Miscellaneous two family
37 ARTHUR AVENUE
STATEN ISLAND · BIN 5146202
💬 Discuss this project
2005Year Built
2Stories
B9Building Class
R3-1Zoning
1,460 sfGross Floor Area
2Units
Miscellaneous two family · 3,520 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NNT DEVELOPMNT503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC209/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J B I CONSTRUCTION GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.B.I. CONSTRUCTION GROUPGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116209/19/2024
Building Lifecycle
All (14)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (10)
10/04/2024
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01052392-I1
09/19/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01052392-P1
09/19/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
09/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
09/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
09/19/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
09/19/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
09/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
09/18/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
09/18/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
09/18/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
05/21/2024
Permit issued — Solar
S01052392-I1-SL
05/16/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01052392-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP05/21/2024
BISPLRE-ISSUEDALISON PLBG & HTG INC07/28/2005
BIS—ISSUEDNNT DEVELOPMENT CORP04/22/2005
1 project · most recent 05/09/2024
FiledStatusContractorScope
05/09/2024CompleteJSP ELECTL CNTNG CORP—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
09/19/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
09/19/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
09/19/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
09/19/2024FinalVYACHESLAV NECHAYEVprogress
09/19/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
09/18/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
09/18/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
09/18/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
09/18/2024FinalVYACHESLAV NECHAYEVprogress
09/18/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026S01052392-P1Request digital key ↗
08/21/2026S01052392-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026S01052392-P1Open ↗
08/29/2026S01052392-P1Open ↗
08/28/2026S01052392-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01052392-I1Open ↗
08/13/2026S01052392-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026S01052392-P1Open ↗
08/28/2026S01052392-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01052392-I1Open ↗