← Back
Luxury hotel
Hotel Plaza Athenee
37 EAST 64 STREET · Upper East Side-Carnegie Hill · BIN 1041080
💬 Discuss this project
1927Year Built
16Stories
H1Building Class
R8BZoning
125,274 sfGross Floor Area
2Units
LL97 CoveredRent Stabilized18 Open Violations 15 unresolved · 3 paperwork only ▸FISP: UNSAFE
Luxury hotel · Owner of record: PLAZA ATHENEE HOTELCOMPANY LIMITED · 10,041 sf lot · 12.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing
BulkheadUnder Construction1p · 1 filing · 2 docs
Floor 14Under Construction1 filing · 6 docs
Floor 13
Floor 12
Floor 11
Floor 101 filing
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction1p · 2 filings · 4 docs
CellarUnder Construction5p · 3 filings · 4 docs
Site & exteriorUnder Construction5 filings · 20 docs
Filed — no permit issued7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLAZA ATHENEE HOTEL COMPANY9909/22/2026
Plaza Athenee Hotel Company Limited2303/22/2026
HOTEL PLAZA ATHENEE1307/08/2026
HOTEL PLAZA ATHENEE-NATIONAL607/22/2026
PLAZA ATHENEE COMPANY403/21/2026
HOTEL PLAZA ATHENEE NEW YORK403/21/2026
PLAZA ATHENEE HOTELCOMPANY LIMITED103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK DESIGN ARCHITECT LLP1003/21/2026
SPRING SCAFFOLDING LLC603/21/2026
A1 EXPEDITING SERVICE CORP.803/21/2026
SKYLINE ACCESS203/21/2026
AE DESIGN SOLUTION603/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
RYBAK DEVELOPMENT203/21/2026
LEWSAN CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor907/08/2026
SHAWMUT WOODWORKING & SUPPLYGeneral Contractor507/25/2026
CONTRACT & HOSPITALITYGeneral Contractor303/21/2026
STARR INDUSTRIES LLCGeneral Contractor308/07/2026
ASPRO PLUMBING INCPlumbing309/22/2026
DNA CONTRACTING LLCGeneral Contractor307/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor207/08/2026
NYC FIRE SPRINKLER CORPFire Protection207/08/2026
LAWRENCE J. LEVINEFire Protection203/21/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
GREGORY PAPANTONIOUElectrical103/21/2026
JOSEPH BRAMANElectrical103/21/2026
KLEINKNECHT ELEC. CO.,INCElectrical103/22/2026
MRGC USA INT INCGeneral Contractor107/08/2026
DAVID JABLONPlumbing107/08/2026
ANTHONY RANIERIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERICAN CONSTRUCTION TES9731308/25/2026
BANGASH ASSOCIATES INC8488208/04/2026
AKS ARCHITECTURAL & ENGIN1957407/09/2026
MILROSE CONSULTANTS LLC2003712/23/2025
LEO Y LEE ASSOCIATES2481303/17/2025
SOCOTEC, INC.301209/30/2024
Building Lifecycle
All (191)Filed (39)Permit Issued (33)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (5)Objection (6)Special Inspection (30)
09/21/2026
Permit issued — Plumbing
M01416169-S1-PL
09/10/2026
Filed — Alteration
Application filed for renovation of 14th floor construction (15th floor marketing) level within existing Residential Hotel. No change to use, bulk, or occupancy.
M01416192-S1
09/03/2026
Permit issued — Sidewalk Shed
M00604483-I1-SH
08/25/2026
Filed — Alteration
FILING FOR STRUCTURAL WORK THROUGHOUT THE EXISTING BLDG. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
M01296130-P2
08/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAZAL BANGASH
08/07/2026
Special inspection requirement — Post-installed Anchors
FAZAL BANGASH
08/06/2026
Permit issued — Sidewalk Shed
M01400342-S2-SH
08/05/2026
Filed — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01400342-S2
08/04/2026
Filed — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01400342-P1
08/04/2026
Filed — Alteration
Installation of temporary supported scaffold as hoist runback structure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress, and/or occupancy with this application.
M01400352-I1
07/31/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/24/2026
Permit issued — General Construction
M01415298-I1-GC
07/22/2026
Permit issued — Plumbing
M01415298-S1-PL
07/20/2026
Permit issued — Suspended Scaffold
M01051756-I1-SC
07/20/2026
Special inspection requirement — Final
EDWIN HOPKINS
07/20/2026
Special inspection requirement — Structural Steel - High Strength Bolting
EDWIN HOPKINS
07/20/2026
Special inspection requirement — Structural Steel - Welding
EDWIN HOPKINS
07/20/2026
Special inspection requirement — Concrete - Cast-In-Place
EDWIN HOPKINS
07/20/2026
Special inspection requirement — Post-installed Anchors
EDWIN HOPKINS
07/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EDWIN HOPKINS
07/20/2026
Special inspection requirement — Structural Steel - Details
EDWIN HOPKINS
07/15/2026
Permit issued — Construction Fence
M01400342-S1-FN
07/14/2026
Filed — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01400342-S1
07/10/2026
Filed — Alteration
ASSOCIATED SPRINKLER/STANDPIPE WORK FOR CELALR/FRIST FLOOR INTERIOR RENOVATION. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
M01415298-S1
07/09/2026
Filed — Alteration
ASSOCIATED SPRINKLER/STANDPIPE WORK FOR CELALR/FRIST FLOOR INTERIOR RENOVATION. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
M01415298-I1
06/16/2026
Objection resolved — Open
06/10/2026
Objection raised — Other
06/10/2026
Special inspection requirement — Luminous Exit Path Markings
Joseph Smerina
06/10/2026
Special inspection requirement — Post-installed Anchors
Joseph Smerina
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Smerina
06/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Smerina
06/10/2026
Special inspection requirement — Final
Joseph Smerina
06/08/2026
Permit issued — Protection and Mechanical Methods
M01400342-I1-PMM
06/08/2026
Special inspection requirement — Post-installed Anchors
FAZAL BANGASH
06/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAZAL BANGASH
06/07/2026
Objection raised — Other
06/07/2026
Objection raised — Other
06/03/2026
Filed — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01400342-I1
06/03/2026
Permit issued — Plumbing
M01295671-I1-PL
06/01/2026
Filed — No Work
M01379688-I1
06/01/2026
Filed — No Work
M01380429-I1
05/29/2026
Filed — Alteration CO
WE ARE SEEKING HUB REVIEW. CHANGE OF USE AT 2/3 FLOORS - CHANGE TO ROOM COUNT ON UPPER SUITE FLOORS, EXCEPT 14/15.
M01356335-I1
05/21/2026
Cycle 9 facade report submitted
04/29/2026
Violation issued (HPD, open)
A
04/20/2026
Violation issued (ECB, open)
Local Law
04/13/2026
Special inspection requirement — Post-installed Anchors
EDWIN HOPKINS
04/13/2026
Special inspection requirement — Final
EDWIN HOPKINS
04/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EDWIN HOPKINS
04/13/2026
Special inspection requirement — Structural Steel - High Strength Bolting
EDWIN HOPKINS
04/13/2026
Special inspection requirement — Concrete - Cast-In-Place
EDWIN HOPKINS
04/13/2026
Special inspection requirement — Structural Steel - Welding
EDWIN HOPKINS
04/13/2026
Special inspection requirement — Structural Steel - Details
EDWIN HOPKINS
04/10/2026
Filed — Alteration
FILING FOR STRUCTURAL WORK THROUGHOUT THE EXISTING BLDG. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
M01296130-P1
03/31/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/27/2026
Cycle 9 facade inspection completed
03/27/2026
Special inspection requirement — Public Assembly Emergency Lighting
Joseph Smerina
03/20/2026
Permit issued — Structural
M01296130-I1-ST
03/04/2026
Permit issued — General Construction
M01070286-I1-GC
Latest 60 of 191 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedASPRO PLUMBING INC09/21/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC09/03/2026
DOB NOWSidewalk ShedPermit IssuedSTARR INDUSTRIES LLC08/06/2026
DOB NOWGeneral ConstructionPermit IssuedSHAWMUT WOODWORKING & SUPPLY07/24/2026
DOB NOWPlumbingPermit IssuedASPRO PLUMBING INC07/22/2026
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC07/20/2026
DOB NOWConstruction FencePermit IssuedSTARR INDUSTRIES LLC07/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSTARR INDUSTRIES LLC06/08/2026
DOB NOWPlumbingPermit IssuedASPRO PLUMBING INC06/03/2026
DOB NOWStructuralPermit IssuedSHAWMUT WOODWORKING & SUPPLY03/20/2026
DOB NOWGeneral ConstructionPermit IssuedPAUL CHARLTON03/04/2026
DOB NOWMechanical SystemsPermit IssuedSHAWMUT WOODWORKING & SUPPLY01/30/2026
DOB NOWGeneral ConstructionPermit IssuedSHAWMUT WOODWORKING & SUPPLY01/30/2026
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC01/12/2026
DOB NOWSuspended ScaffoldPermit IssuedDNA CONTRACTING LLC01/09/2026
DOB NOWMechanical SystemsSigned-offMRGC USA INT INC12/03/2025
DOB NOWGeneral ConstructionPermit IssuedCONTRACT & HOSPITALITY09/26/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC09/09/2025
DOB NOWGeneral ConstructionPermit IssuedPAUL CHARLTON02/27/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC01/10/2025
DOB NOWGeneral ConstructionPermit IssuedPAUL CHARLTON01/02/2025
DOB NOWSuspended ScaffoldPermit IssuedDNA CONTRACTING LLC11/20/2024
DOB NOWSprinklersPermit IssuedNYC FIRE SPRINKLER CORP10/21/2024
DOB NOWPlumbingSigned-offNYC FIRE SPRINKLER CORP10/15/2024
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC10/09/2024
DOB NOWGeneral ConstructionSigned-offSHAWMUT WOODWORKING & SUPPLY09/25/2024
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC09/19/2024
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC08/08/2024
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC05/29/2024
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC09/26/2023
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC09/29/2022
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC10/05/2021
DOB NOWPlumbingPermit IssuedDAVID JABLON02/25/2020
BISMHISSUEDSTEVEN ENTERPRISES INC10/27/2015
BISOTISSUEDFENNELL ENGINEERING PC11/24/2014
BISEQISSUEDEVEREST SCAFFOLDING INC06/02/2014
BISPLISSUEDAMR MECHANICAL INC04/12/2013
BISOTISSUEDUNITED TOWER MAINTENANCE03/05/2012
BISPLISSUEDAMR MECHANICAL INC03/05/2012
BISSPISSUEDPACE PLUMBING CORP04/12/2011
+ 32 more permits on file
2 projects · most recent 07/10/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/10/2026Permit IssuedSHAWMUT WOODWORKING & SUPHeating and Air Conditioning Systems
Heat / Cool
Multistack MS30C5A2W 180 tons · Chiller ×2
11/14/2025Permit IssuedSHAWMUT WOODWORKING & SUPHeating and Air Conditioning Systems
Heat / Cool
Multistack MS30C5A2W 180 tons · Chiller ×2
3 projects · most recent 09/10/2026
Sprinkler System
FiledStatusContractorScope
09/10/2026——Sprinkler System
07/10/2026——Sprinkler System
03/12/2025———
4 projects · most recent 09/10/2026
Water/Sanitary Storm Gas
FiledStatusContractorScope
09/10/2026——Storm, Water/Sanitary
07/10/2026Permit IssuedASPRO PLUMBING, INCGas, Storm, Water/Sanitary
12/08/2025Permit IssuedASPRO PLUMBING, INCGas, Storm, Water/Sanitary
03/12/2025——Water/Sanitary
9 projects · most recent 08/06/2026
General Wiring
FiledStatusContractorScope
08/06/2026Permit IssuedJ.A. LEE ELEC SVCS LLC—
05/13/2026Permit IssuedJ.A. LEE ELEC SVCS LLC—
04/07/2026Permit IssuedNEE ELECTRICAL, LLC—
03/31/2026Permit IssuedH. & L. ELECTRIC INC—
11/13/2025CompleteH. & L. ELECTRIC INCGeneral Wiring
12/23/2024Permit IssuedTOP SHELF ELECTRIC CORP—
10/15/2024Permit IssuedKLEINKNECHT ELEC. CO.,INCGeneral Wiring
01/30/2024Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
10/08/2021Permit IssuedBOROWIDE ELECT'L CONTR'S—
1 project · most recent 08/25/2026
Steel Concrete
FiledStatusContractorScope
08/25/2026Permit IssuedSHAWMUT WOODWORKING & SUPSteel, Concrete
2 projects · most recent 08/05/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
08/05/2026Permit IssuedSTARR INDUSTRIES LLCFence, Sidewalk Shed
08/04/2026——Scaffold
3 projects · most recent 03/17/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/17/2025Permit IssuedDNA CONTRACTING LLCSuspended Scaffold (SC)
05/25/2024Permit Issued——
05/15/2024Permit IssuedSKYLINE ACCESS LLC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/31/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/31/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
08/07/2026Structural Stability – Alterations of existing buildingsFAZAL BANGASHspecial
08/07/2026Post-installed AnchorsFAZAL BANGASHspecial
07/20/2026FinalEDWIN HOPKINSprogress
07/20/2026Structural Steel - High Strength BoltingEDWIN HOPKINSspecial
07/20/2026Structural Steel - WeldingEDWIN HOPKINSspecial
07/20/2026Concrete - Cast-In-PlaceEDWIN HOPKINSspecial
07/20/2026Post-installed AnchorsEDWIN HOPKINSspecial
07/20/2026Structural Stability – Alterations of existing buildingsEDWIN HOPKINSspecial
07/20/2026Structural Steel - DetailsEDWIN HOPKINSspecial
06/10/2026Luminous Exit Path MarkingsJoseph Smerinaspecial
06/10/2026Post-installed AnchorsJoseph Smerinaspecial
06/10/2026Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
06/10/2026Fire-Resistance Rated ConstructionJoseph Smerinaprogress
06/10/2026FinalJoseph Smerinaprogress
06/08/2026Post-installed AnchorsFAZAL BANGASHspecial
06/08/2026Structural Stability – Alterations of existing buildingsFAZAL BANGASHspecial
04/13/2026Post-installed AnchorsEDWIN HOPKINSspecial
04/13/2026FinalEDWIN HOPKINSprogress
04/13/2026Structural Stability – Alterations of existing buildingsEDWIN HOPKINSspecial
04/13/2026Structural Steel - High Strength BoltingEDWIN HOPKINSspecial
04/13/2026Concrete - Cast-In-PlaceEDWIN HOPKINSspecial
04/13/2026Structural Steel - WeldingEDWIN HOPKINSspecial
04/13/2026Structural Steel - DetailsEDWIN HOPKINSspecial
03/31/2026Construction Operations Influencing Adjacent Structures—special
03/31/2026Fire-Resistant Penetrations and Joints—special
Latest 25 of 51.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Nobu Hotel & SpaOtherCellar, Floor 1
Project M01415298 Alteration · Permit Entire · 07/09/2026
Plaza Athénée Hotel CompanyOtherFloors 4–17
Project M01293873 Alteration · Permit Entire · 11/12/2025
Plaza Athénée Nobu Hotel & SpaMixed Use—
Project M01105617 Alteration · Approved · 03/12/2025
Hôtel Plaza Athénée Plaza Athénée Hotel CompanyOther—
Project M01070286 Alteration · Permit Entire · 08/29/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 571 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch38
09/22/2026M01416192-I1Request digital key ↗
09/22/2026M01416192-S1Request digital key ↗
09/03/2026M00604483-I1Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
09/05/2026M00121081-I1Request digital key ↗
08/14/2026M01380429-I1Request digital key ↗
08/14/2026M01379688-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00260147-I1Request digital key ↗
▸Applications & Permits121
▸BISPLAN / WORK APPROVAL APPLICATION63
12/16/2025103518409Open ↗
11/10/2015122559953Open ↗
11/09/2015122559953Open ↗
Showing 3 of 63 on file for this type
▸BISWORK PERMIT APPLICATION31
11/10/2015122559953Open ↗
11/24/2014140282138Open ↗
06/02/2014140205659Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWLPC Approval/Permit25
09/22/2026M01416192-S1Open ↗
09/22/2026M01416192-I1Open ↗
09/10/2026M01296130-P2Open ↗
Showing 3 of 25 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY APPLICATION1
04/14/2010120017828Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026M01356335-I1Open ↗
▸Seals & Professional Certifications152
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION55
09/12/2018122559953Open ↗
12/03/2015140205659Open ↗
11/24/2015140205659Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/22/2026M01416192-S1Open ↗
09/22/2026M01416192-I1Open ↗
09/05/2026M00121081-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/23/2026M01296130-P2Open ↗
09/23/2026M01294056-I1Open ↗
09/02/2026M01067540-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
11/10/2015122559953Open ↗
03/05/2012120994683Open ↗
05/06/2010120335930Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026M01296130-P2Open ↗
09/23/2026M01294056-I1Open ↗
09/02/2026M01067540-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
03/05/2012120994683Open ↗
05/06/2010120335930Open ↗
Showing 2 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/10/2015122559953Open ↗
11/18/2014140282138Open ↗
06/02/2014140205659Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/18/2014140282138Open ↗
06/02/2014140205659Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/18/2014140282138Open ↗
06/02/2014140205659Open ↗
▸Trade Schedules & Equipment65
▸BISSCHEDULE B - PLUMBING36
03/05/2012120994683Open ↗
03/01/2011110422757Open ↗
02/28/2011110422757Open ↗
Showing 3 of 36 on file for this type
▸BISSELF-CERT PLUMBING NOTICE20
05/20/2013120994683Open ↗
05/20/2013120994683Open ↗
06/20/2011120209336Open ↗
Showing 3 of 20 on file for this type
▸BISEQUIPMENT USE PERMITS4
02/14/2011110180768Open ↗
02/14/2011110180768Open ↗
01/26/2011110180768Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
06/20/2011120209336Open ↗
06/02/2011120198188Open ↗
03/08/2011120209336Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
12/01/2010110224409Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
02/14/2011110180768Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
03/05/2012120994683Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00260147-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/15/2026M01356335-I1Open ↗
▸Environmental & Asbestos43
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/05/2026M00260147-I1Open ↗
08/26/2026M01065530-I1Open ↗
08/26/2026M01065490-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
03/05/2012120994683Open ↗
10/27/2010120335930Open ↗
02/25/2011120598530Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
09/22/2026M01416192-S3Open ↗
09/22/2026M01416192-S1Open ↗
09/22/2026M01416192-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/10/2015122559953Open ↗
11/18/2014140282138Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/12/2018122559953Open ↗
11/10/2015122559953Open ↗
▸BISEN2 - As Built Energy Analysis2
06/20/2013120994683Open ↗
09/12/2018122559953Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/05/2012120994683Open ↗
▸BISTR8: Energy Code Progress Inspections1
06/20/2013120994683Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/02/2014140205659Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/02/2014140205659Open ↗
▸Approvals, Objections & Sign-offs56
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
09/12/2018122559953Open ↗
04/01/2016140205659Open ↗
11/24/2015140205659Open ↗
Showing 3 of 20 on file for this type
▸BISLANDMARKS APPROVAL13
05/31/2016140282138Open ↗
11/10/2015122559953Open ↗
11/18/2014140282138Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
03/05/2012120994683Open ↗
02/07/2011120598530Open ↗
05/06/2010120335930Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE9
08/18/2010120017828Open ↗
08/18/2010120017828Open ↗
08/18/2010120017828Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS SIGNOFF1
09/12/2018122559953Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/27/2010120335930Open ↗
▸DOB NOWLandmark Approval1
08/13/2026M01296130-I1Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT23
09/12/2018122559953Open ↗
05/31/2016140282138Open ↗
11/10/2015122559953Open ↗
Showing 3 of 23 on file for this type
▸Filing & Intake Forms28
▸BISEFILING COVER SHEET14
11/10/2015122559953Open ↗
03/05/2012120994683Open ↗
02/07/2011120598530Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION9
02/28/2011110422757Open ↗
02/03/2011110422757Open ↗
06/16/2010110422757Open ↗
Showing 3 of 9 on file for this type
▸BISeFiling Job Application Cover Sheet4
11/18/2014140282138Open ↗
06/02/2014140205659Open ↗
Showing 2 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
09/12/2018122559953Open ↗
▸Other Documents28
▸DOB NOWProof of Historic Building14
08/26/2026M01065530-I1Open ↗
08/20/2026M01294056-P1Open ↗
08/20/2026M01295671-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWManufacturer's Specifications3
08/13/2026M01131461-P2Open ↗
08/13/2026M01131461-P1Open ↗
08/13/2026M01131461-I1Open ↗
▸DOB NOWCalculations3
08/13/2026M01131461-P1Open ↗
08/13/2026M01131461-P2Open ↗
08/13/2026M01131461-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
11/18/2014140282138Open ↗
11/01/2010120335930Open ↗
▸DOB NOWIRA Certification2
08/13/2026M01051756-I1Open ↗
08/13/2026M01057034-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026M01356335-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026M01356335-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026M01356335-I1Open ↗
▸DOB NOWPlot Diagram1
08/15/2026M01356335-I1Open ↗