← Back
Five to six families
37 FROST STREET
BROOKLYN · BIN 3068043
💬 Discuss this project
1930Year Built
3Stories
C2Building Class
M1-2/R6BZoning
4,125 sfGross Floor Area
6Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 37 FROST OWNER LLC · 2,500 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Floor 32p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
APEX MANAGEMENT GROUP904/11/2026
37 FROST OWNER LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/05/2024$3.0M—37 FROST LLC → 37 FROST OWNER LLC$715/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC310/22/2025
JIN LEE, RA109/12/2025
JAMES CHAI ARCHITECT, P.C.308/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RICHARD WAINER ARCHITECT, PLLC803/21/2026
A1 EXPEDITING SERVICE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REDIRECTING LIC INCGeneral Contractor204/09/2026
YARKS NYC INCGeneral Contractor207/08/2026
BADGER MANAGEMENT INCGeneral Contractor104/11/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SANDEEP GUNNALA ENGINEERI8482110/22/2025
JAMES JH CHAI & ASSOCIATE6481409/12/2025
Building Lifecycle
All (34)Filed (7)Permit Issued (6)Signed Off (6)Violation (15)
04/13/2026
Signed off — Alteration
RENOVATE UNITS #1B, 1D, 2A, 2B, 2C, 2D, 3A, 3B, 3C, 3D & COMMON HALLWAY FROM 2ND FL TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS,LIGHTING AND FINISH WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01006074-S2
04/09/2026
Permit issued — Mechanical Systems
B01006074-S2-MS
01/20/2026
Signed off — Alteration
REPAIR WORK FOR EXISTING FIRE ESCAPE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01277316-I1
01/16/2026
Signed off — Alteration
RENOVATE UNITS #1B, 1D, 2A, 2B, 2C, 2D, 3A, 3B, 3C, 3D & COMMON HALLWAY FROM 2ND FL TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS,LIGHTING AND FINISH WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01006074-I1
01/09/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01283720-I1
01/09/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01283720-S1
12/23/2025
Signed off — Alteration
RENOVATE UNITS #1B, 1D, 2A, 2B, 2C, 2D, 3A, 3B, 3C, 3D & COMMON HALLWAY FROM 2ND FL TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS,LIGHTING AND FINISH WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01006074-S1
12/05/2025
Permit issued — Supported Scaffold
B01283720-S1-SF
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/22/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01283720-S1
10/09/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01283720-P1
10/01/2025
Violation issued (ECB, closed)
Construction
10/01/2025
Violation issued (ECB, closed)
Construction
09/19/2025
Permit issued — General Construction
B01277316-I1-GC
09/12/2025
Filed — Alteration
REPAIR WORK FOR EXISTING FIRE ESCAPE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01277316-I1
09/12/2025
Permit issued — Sidewalk Shed
B01283720-I1-SH
09/11/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01283720-I1
08/27/2025
Permit issued — General Construction
B01006074-I1-GC
08/20/2025
Permit issued — Plumbing
B01006074-S1-PL
08/19/2025
Filed — Alteration
RENOVATE UNITS #1B, 1D, 2A, 2B, 2C, 2D, 3A, 3B, 3C, 3D & COMMON HALLWAY FROM 2ND FL TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS,LIGHTING AND FINISH WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01006074-S2
07/29/2025
Filed — Alteration
RENOVATE UNITS #1B, 1D, 2A, 2B, 2C, 2D, 3A, 3B, 3C, 3D & COMMON HALLWAY FROM 2ND FL TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS,LIGHTING AND FINISH WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01006074-S1
04/10/2024
Violation issued (HPD, closed)
A
02/15/2024
Filed — Alteration
RENOVATE UNITS #1B, 1D, 2A, 2B, 2C, 2D, 3A, 3B, 3C, 3D & COMMON HALLWAY FROM 2ND FL TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS,LIGHTING AND FINISH WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01006074-I1
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/22/2023
Violation issued (HPD, closed)
A
11/07/2022
Violation issued (HPD, closed)
I
02/24/2022
Violation issued (HPD, closed)
A
04/08/2021
Violation issued (HPD, closed)
A
04/08/2021
Violation issued (HPD, closed)
I
11/09/2016
Violation issued (HPD, closed)
I
10/09/2015
Violation issued (HPD, closed)
I
02/20/2015
Violation issued (HPD, closed)
I
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/25/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBADGER MANAGEMENT04/09/2026
DOB NOWSupported ScaffoldSigned-offYARKS NYC INC12/05/2025
DOB NOWGeneral ConstructionSigned-offREDIRECTING LIC INC09/19/2025
DOB NOWSidewalk ShedSigned-offYARKS NYC INC09/12/2025
DOB NOWGeneral ConstructionSigned-offREDIRECTING LIC INC08/27/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC08/20/2025
2 projects · most recent 03/03/2026
General Wiring
FiledStatusContractorScope
03/03/2026CompleteE & M ELECTRICAL NY CORPGeneral Wiring
10/03/2025Permit IssuedSPICE ELECTRIC COMPANY—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
10/22/2025Post-installed AnchorsSandeep Gunnalaspecial
08/25/2025Tenant Protection Plan ComplianceJoon Ho Chaispecial
08/25/2025FinalJIN WOO LEEprogress
07/29/2025HVAC-R and service water heating equipmentJoon Ho Chaienergy_progress
07/29/2025Maintenance informationJoon Ho Chaienergy_progress
07/29/2025HVAC-R and service water piping design and insulationJoon Ho Chaienergy_progress
07/29/2025HVAC-R and service water heating system controlsJoon Ho Chaienergy_progress
07/24/2025Tenant Protection Plan ComplianceJoon Ho Chaispecial
07/24/2025Energy Code Compliance InspectionsJoon Ho Chaiprogress
07/24/2025Fire-Resistant Penetrations and JointsJoon Ho Chaispecial
02/15/2024Insulation placement and R valuesJoon Ho Chaienergy_progress
02/15/2024Fenestration areasJoon Ho Chaienergy_progress
02/15/2024Fire-Resistant Penetrations and JointsJoon Ho Chaispecial
02/15/2024Interior lighting powerJoon Ho Chaienergy_progress
02/15/2024Fenestration air leakageJoon Ho Chaienergy_progress
02/15/2024Tenant Protection Plan ComplianceJoon Ho Chaispecial
02/15/2024Energy Code Compliance InspectionsJoon Ho Chaiprogress
02/15/2024Fire-Resistance Rated ConstructionJoon Ho Chaiprogress
02/15/2024FinalJIN WOO LEEprogress
02/15/2024Maintenance informationJoon Ho Chaienergy_progress
02/15/2024Fenestration and door U-factor and product ratingsJoon Ho Chaienergy_progress
02/15/2024MeteringJoon Ho Chaienergy_progress
02/15/2024Air barrier - visual inspectionJoon Ho Chaienergy_progress
02/15/2024Permanent certificateJoon Ho Chaienergy_progress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026B01006074-S2Request digital key ↗
08/26/2026B01006074-I1Request digital key ↗
08/26/2026B01006074-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/13/2026B01277316-I1Open ↗
08/13/2026B01006074-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026B01006074-I1Open ↗
09/02/2026B01006074-I1Open ↗
09/02/2026B01006074-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B01006074-S2Open ↗
08/26/2026B01006074-I1Open ↗
08/26/2026B01006074-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B01006074-I1Open ↗
09/01/2026B01277316-I1Open ↗
08/25/2026B01283720-S1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWHPD-1: Anti-Harassment Area Checklist7
08/13/2026B01277316-I1Open ↗
08/13/2026B01006074-S2Open ↗
08/13/2026B01006074-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWCertificate of No Harassment2
08/13/2026B01006074-I1Open ↗
08/13/2026B01277316-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026B01006074-S1Open ↗
08/26/2026B01006074-S2Open ↗
08/26/2026B01006074-I1Open ↗