Zoned residential, not Manhattan
37 GARNET STREET
BROOKLYN · BIN 3008172
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6BZoning
0 sfGross Floor Area
0Units
7 Open Violations 5 unresolved · 2 paperwork only ▸
Zoned residential, not Manhattan · Owner of record: GARNET ALFA LLC · 2,000 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction82p · 6 filings · 20 docs
Bulkhead8p · 2 filings · 20 docs
Floor 4Under Construction42p · 2 filings · 20 docs
Floor 3Under Construction75p · 5 filings · 20 docs
Floor 2Under Construction72p · 4 filings · 20 docs
Floor 1Under Construction75p · 6 filings · 20 docs
CellarUnder Construction38p · 1 filing · 10 docs
BasementUnder Construction37p · 3 filings · 20 docs
Sub-BasementUnder Construction41p · 3 filings · 20 docs
1 job · most recent 08/19/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026Permit IssuedGIRON CONTRACTING INCAir Conditioning Systems, Heating Systems
Cooling
Daikin RXTQ48TAVJU 48,116 BTU · Vrf Outdoor ×1
RXTQ60TAVJU 57,678 BTU · Vrf Outdoor ×1
Heating
Daikin ×2
1 job · most recent 03/02/2026
FiledStatusContractorScope
03/02/2026Permit IssuedT.N.T PLBG & HTG INC37 heads
1 job · most recent 03/02/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/02/2026Permit IssuedRAYMOND'S PLBG & HTG LLCGas, Storm, Water/Sanitary
3 jobs · most recent 06/19/2025
General Wiring
FiledStatusContractorScope
06/19/2025Permit IssuedNAS ELECTRIC CORPGeneral Wiring
03/25/2025Permit IssuedRICHARD NEU—
07/06/2021CompleteNASH ELECTRIC SERVICES IN—
1 job · most recent 05/12/2021
FiledStatusContractorScope
05/12/2021Permit IssuedPERCIBALLI INDUSTRIES INC1 scope_items
3 jobs · most recent 03/28/2025
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
03/28/2025Permit IssuedCLASSIC CONSULTING GROUPScaffold
03/20/2025Permit IssuedCLASSIC CONSULTING GROUPSidewalk Shed
06/06/2023Permit IssuedGIRON CONTRACTING INCFence
Building Lifecycle
All (168)Filed (21)Permit Issued (20)Signed Off (5)Violation (5)Inspection (8)Objection (79)Special Inspection (30)
09/10/2026
Objection resolved — Addressed
09/08/2026
Objection raised — Other
08/30/2026
Objection resolved — Addressed
08/30/2026
Objection resolved — Addressed
08/30/2026
Objection resolved — Addressed
08/30/2026
Objection resolved — Addressed
08/26/2026
Objection raised — Other
08/26/2026
Objection raised — Fire_Protection
08/26/2026
Objection raised — Inspections
08/26/2026
Objection raised — Scope
08/19/2026
Filed — Alteration
FILING FOR MECHANICAL WORK ASSOCIATED WITH FOUR STORY, TWO FAMILY NEW BUILDING AS PER PLANS.
B00580678-P2
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Rajasekhar Sakhamuri
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
08/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Rajasekhar Sakhamuri
08/11/2026
Special inspection requirement — Sprinkler Systems
Rajasekhar Sakhamuri
08/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Rajasekhar Sakhamuri
08/11/2026
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
07/14/2026
Objection resolved — Resolved
07/14/2026
Objection resolved — Resolved
07/14/2026
Objection resolved — Resolved
07/14/2026
Objection resolved — Resolved
07/14/2026
Objection resolved — Resolved
07/14/2026
Objection resolved — Resolved
07/14/2026
Objection resolved — Resolved
07/14/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Addressed
06/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Rajasekhar Sakhamuri
06/29/2026
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
06/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Rajasekhar Sakhamuri
06/29/2026
Special inspection requirement — Mechanical Systems
Rajasekhar Sakhamuri
06/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Rajasekhar Sakhamuri
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
06/29/2026
Special inspection requirement — Final
Rajasekhar Sakhamuri
06/13/2026
Objection resolved — Addressed
06/13/2026
Objection resolved — Addressed
06/13/2026
Objection resolved — Addressed
06/13/2026
Objection resolved — Addressed
06/09/2026
Signed off — Alteration
B00565395-I1
05/15/2026
Permit issued — Construction Fence
B00534482-I1-FN
05/03/2026
Objection resolved — Addressed
05/03/2026
Objection resolved — Addressed
05/03/2026
Objection resolved — Addressed
04/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/21/2026
Special inspection requirement — Lighting in dwelling units
Rajasekhar Sakhamuri
04/21/2026
Special inspection requirement — Air barrier - visual inspection
Rajasekhar Sakhamuri
04/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Rajasekhar Sakhamuri
04/21/2026
Special inspection requirement — Fenestration areas
Rajasekhar Sakhamuri
04/21/2026
Special inspection requirement — Fenestration air leakage
Rajasekhar Sakhamuri
04/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
04/21/2026
Special inspection requirement — Insulation placement and R values
Rajasekhar Sakhamuri
04/03/2026
Filed — New Building
FILING FOR CONSTRUCTION OF TWO FAMILY, FOUR STORY NEW BUILDING AS PER PLANS SUBMITTED HEREWITH.
B01049462-P1
04/02/2026
Special inspection requirement — Air barrier - visual inspection
Rajasekhar Sakhamuri
04/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Rajasekhar Sakhamuri
04/02/2026
Special inspection requirement — Fenestration areas
Rajasekhar Sakhamuri
04/02/2026
Special inspection requirement — Lighting in dwelling units
Rajasekhar Sakhamuri
04/02/2026
Special inspection requirement — Insulation placement and R values
Rajasekhar Sakhamuri
04/02/2026
Special inspection requirement — Fenestration air leakage
Rajasekhar Sakhamuri
04/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
Latest 60 of 168 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CLASSIC CONSULTING GROUP507/08/2026
GIRON CONTRACTING203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/10/2019$1.3M—Private party → GARNET ALFA LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN LIGHT EXPEDITING LLC3003/21/2026
PERCIBALLI INDUSTRIES203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GIRON CONTRACTING INCGeneral Contractor1307/08/2026
CLASSIC CONSULTING GROUPGeneral Contractor207/08/2026
PERCIBALLI INDUSTRIES INC.General Contractor204/09/2026
RAYMOND'S PLBG & HTG LLCPlumbing207/08/2026
T.N.T PLBG & HTG INCFire Protection107/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor107/08/2026
NAS ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES74951008/19/2026
GZA GEOENVIRONMENTAL OF N1179402/29/2024
MCALPINE ARCHITECTURE PC5694202/05/2024
PETRACCA DESIGN AND ENGIN668106/07/2023
BUILDING CONSULTING ENGIN1034105/12/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedGIRON CONTRACTING INC05/15/2026
DOB NOWPlumbingPermit IssuedT.N.T PLBG & HTG INC02/06/2026
DOB NOWMechanical SystemsPermit IssuedGIRON CONTRACTING INC12/10/2025
DOB NOWGeneral ConstructionPermit IssuedGIRON CONTRACTING INC10/22/2025
DOB NOWSprinklersPermit IssuedRAYMOND'S PLBG & HTG LLC08/29/2025
DOB NOWConstruction FencePermit IssuedGIRON CONTRACTING INC05/16/2025
DOB NOWSupported ScaffoldPermit IssuedCLASSIC CONSULTING GROUP03/31/2025
DOB NOWSidewalk ShedPermit IssuedCLASSIC CONSULTING GROUP03/20/2025
DOB NOWStructuralSigned-offGIRON CONTRACTING INC12/26/2024
DOB NOWGeneral ConstructionPermit IssuedGIRON CONTRACTING INC12/06/2024
DOB NOWSprinklersPermit IssuedRAYMOND'S PLBG & HTG LLC10/11/2024
DOB NOWFoundationSigned-offGIRON CONTRACTING INC06/04/2024
DOB NOWConstruction FencePermit IssuedGIRON CONTRACTING INC05/30/2024
DOB NOWSupport of ExcavationSigned-offGIRON CONTRACTING INC05/29/2024
DOB NOWSupport of ExcavationSigned-offGIRON CONTRACTING INC05/15/2024
DOB NOWFoundationSigned-offGIRON CONTRACTING INC05/15/2024
DOB NOWFoundationSigned-offGIRON CONTRACTING INC09/22/2023
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC07/08/2021
DOB NOWConstruction FencePermit IssuedPERCIBALLI INDUSTRIES INC.07/01/2021
DOB NOWGeneral ConstructionPermit IssuedPERCIBALLI INDUSTRIES INC.05/18/2021
BIS—ISSUEDPERCIBALLI INDUSTRIES INC.07/06/2021
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/25/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/25/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
08/11/2026Sprinkler SystemsRajasekhar Sakhamurispecial
08/11/2026HVAC-R and service water heating equipmentRajasekhar Sakhamurienergy_progress
08/11/2026HVAC-R and service water heating system controlsRajasekhar Sakhamurienergy_progress
08/11/2026HVAC-R and service water piping design and insulationRajasekhar Sakhamurienergy_progress
08/11/2026Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
08/11/2026Maintenance informationRajasekhar Sakhamurienergy_progress
06/29/2026HVAC-R and service water heating system controlsRajasekhar Sakhamurienergy_progress
06/29/2026Maintenance informationRajasekhar Sakhamurienergy_progress
06/29/2026HVAC-R and service water heating equipmentRajasekhar Sakhamurienergy_progress
06/29/2026HVAC-R and service water piping design and insulationRajasekhar Sakhamurienergy_progress
06/29/2026Mechanical SystemsRajasekhar Sakhamurispecial
06/29/2026Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
06/29/2026FinalRajasekhar Sakhamuriprogress
04/21/2026Lighting in dwelling unitsRajasekhar Sakhamurienergy_progress
04/21/2026Fenestration and door U-factor and product ratingsRajasekhar Sakhamurienergy_progress
04/21/2026Air barrier - visual inspectionRajasekhar Sakhamurienergy_progress
04/21/2026Fenestration areasRajasekhar Sakhamurienergy_progress
04/21/2026Insulation placement and R valuesRajasekhar Sakhamurienergy_progress
04/21/2026Fire-Resistance Rated ConstructionRajasekhar Sakhamuriprogress
04/21/2026Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
04/21/2026Fenestration air leakageRajasekhar Sakhamurienergy_progress
04/02/2026Fenestration and door U-factor and product ratingsRajasekhar Sakhamurienergy_progress
04/02/2026Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
04/02/2026Fire-Resistance Rated ConstructionRajasekhar Sakhamuriprogress
04/02/2026Fenestration air leakageRajasekhar Sakhamurienergy_progress
Latest 25 of 76.
▾Documents — 165 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/01/2026B00519271-I1Request digital key ↗
09/01/2026B00550779-I1Request digital key ↗
09/01/2026B00564658-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/29/2021322095503Open ↗
▸BISWORK PERMIT APPLICATION1
07/07/2021322095503Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B01049462-I1Open ↗
08/13/2026B00564658-P1Open ↗
08/13/2026B01049462-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00564658-P1Open ↗
08/13/2026B00564658-I1Open ↗
08/13/2026B01049462-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01049462-I1Open ↗
08/13/2026B00564658-I1Open ↗
▸Seals & Professional Certifications94
▸DOB NOWProgress Inspector Seal & Signature48
08/29/2026B00550779-I1Open ↗
08/27/2026B00580755-I1Open ↗
08/27/2026B00580755-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/01/2026B00580781-P1Open ↗
08/29/2026B00580781-I1Open ↗
08/27/2026B00580755-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/01/2026B00564658-I1Open ↗
09/01/2026B00564658-P1Open ↗
08/22/2026B01198096-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/07/2021322095503Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00564658-I1Open ↗
08/13/2026B01049462-I1Open ↗
08/13/2026B00564658-P1Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist4
09/01/2026B00564658-I1Open ↗
08/15/2026B00564658-P1Open ↗
08/13/2026B01049462-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B01049462-I1Open ↗
08/13/2026B00564658-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/07/2021322095503Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
07/07/2021322095503Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/07/2021322095503Open ↗
▸BISRODENT CONTROL1
07/07/2021322095503Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/13/2026B00580755-P1Open ↗
08/13/2026B00580755-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00885445-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00580755-I1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026B00580755-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/07/2021322095503Open ↗
07/07/2021322095503Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
07/07/2021322095503Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
07/07/2021322095503Open ↗
▸Filing & Intake Forms3
▸DOB NOWAI1 Form2
08/21/2026B00580678-P2Open ↗
08/13/2026B00580678-I1Open ↗
▸BISEFILING COVER SHEET1
04/29/2021322095503Open ↗
▸Other Documents13
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B01049462-I1Open ↗
08/13/2026B00564658-P1Open ↗
08/13/2026B00564658-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026B00564658-P1Open ↗
08/13/2026B01049462-I1Open ↗
08/13/2026B01049462-P1Open ↗
▸DOB NOWPD1 Document2
08/13/2026B00564658-P1Open ↗
08/13/2026B00564658-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026B01049462-I1Open ↗
08/17/2026B01049462-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00580781-I1Open ↗
▸DOB NOWWaiver Document1
08/13/2026B00580781-I1Open ↗