← Back
BuildNYC
Multi-story retail building (2+)
37 HILLEL PLACE
BROOKLYN · BIN 3205805
💬 Discuss this project
1965Year Built
2Stories
K2Building Class
C4-4AZoning
5,286 sfGross Floor Area
3Units
0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: Pad Realty · 3,886 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPizza Hut11p · 4 filings · 20 docs
Floor 2Pizza Hut2p · 1 filing · 2 docs
Floor 1Pizza Hut66p · 5 filings · 20 docs
CellarPad Realty CORP2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pad Realty3207/08/2026
Starbucks103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Marin Architects509/08/2022
Emtec Consultants210/19/2021
HC Engineering109/22/2021
A Tech Engineering NYC112/05/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Marin Architects503/21/2026
Bohler Engineering203/21/2026
JP Expedite203/21/2026
A Tech Engineering NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. Caiazzo Plumbing & HeatingPlumbing507/08/2026
Kaback EnterprisesGeneral Contractor203/21/2026
Signs CadSign hanger207/08/2026
James Simpson & SonPlumbing207/08/2026
M-Pak ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Z & T Engineering591202/04/2022
Eti Consultants7694210/19/2021
Building Lifecycle
All (73)Filed (9)Permit Issued (7)Signed Off (3)Violation (26)Inspection (6)Special Inspection (22)
04/13/2026
Violation issued (ECB, closed)
Construction
07/01/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/21/2025
Permit issued — Plumbing
B00270833-I1-PL
11/29/2023
Violation issued (FDNY_NOV, closed)
09/08/2022
Filed — Alteration
installation of new hand sink, 3 comp sink, commercial dish washer, and 2 floor drains. Replace existing mop sink, toilet and hand sink with new fixtures, replace grease interceptor, replace HWH.
B00506933-P2
08/22/2022
Permit issued — Plumbing
B00270833-I1-PL
04/07/2022
Violation issued (FDNY_NOV, closed)
03/17/2022
Signed off — Alteration
INTERIOR FIT OUT OF PIZZA SHOP/ TAKE OUT ONLY WITH COMMERCIAL KITCHEN AT 1ST FLOOR. NO CHANGE TO USE GROUP, OCCUPANT LOAD, OR EGRESS. INSTALLATION OF MECHANCIAL EQUIPMENT AND ASSOCIATED DUCT WORK FOR HEATING AND COOLING.
B00482417-I1
02/10/2022
Special inspection requirement — Mechanical Systems
Fei Zeng
02/10/2022
Special inspection requirement — Final
Fei Zeng
02/10/2022
Special inspection requirement — Maintenance information
Fei Zeng
02/10/2022
Special inspection requirement — Lighting controls
Fei Zeng
02/10/2022
Special inspection requirement — Interior lighting power
Fei Zeng
02/10/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fei Zeng
02/10/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fei Zeng
02/10/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fei Zeng
02/10/2022
Special inspection requirement — Ventilation and air distribution system
Fei Zeng
02/04/2022
Filed — Alteration
INTERIOR FIT OUT OF PIZZA SHOP/ TAKE OUT ONLY WITH COMMERCIAL KITCHEN AT 1ST FLOOR. NO CHANGE TO USE GROUP, OCCUPANT LOAD, OR EGRESS. INSTALLATION OF MECHANCIAL EQUIPMENT AND ASSOCIATED DUCT WORK FOR HEATING AND COOLING.
B00482417-P1
01/27/2022
Special inspection requirement — Mechanical Systems
Fei Zeng
01/27/2022
Special inspection requirement — Final
Fei Zeng
01/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fei Zeng
01/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fei Zeng
01/27/2022
Special inspection requirement — Lighting controls
Fei Zeng
01/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fei Zeng
01/27/2022
Special inspection requirement — Maintenance information
Fei Zeng
01/27/2022
Special inspection requirement — Ventilation and air distribution system
Fei Zeng
01/27/2022
Special inspection requirement — Interior lighting power
Fei Zeng
11/08/2021
Signed off — Alteration
B00585819-I1
11/05/2021
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
10/27/2021
Signed off — Alteration
Installation of mechanical systems ducting and piping
B00470583-I1
10/27/2021
Filed — Alteration
installation of new hand sink, 3 comp sink, commercial dish washer, and 2 floor drains. Replace existing mop sink, toilet and hand sink with new fixtures, replace grease interceptor, replace HWH.
B00506933-P1
10/21/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/19/2021
Filed — Alteration
Installation of mechanical systems ducting and piping
B00470583-P1
10/15/2021
Special inspection requirement — Mechanical Systems
ANTHONY MUSUMECI
10/15/2021
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY MUSUMECI
10/15/2021
Special inspection requirement — Final
ANTHONY MUSUMECI
10/15/2021
Special inspection requirement — Maintenance information
ANTHONY MUSUMECI
10/05/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/24/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/23/2021
Permit issued — Sign
B00585819-I1-SG
09/23/2021
Permit issued — Sign
B00585871-I1-SG
09/22/2021
Filed — Alteration
B00585819-I1
08/02/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/22/2021
Permit issued — Mechanical Systems
B00470583-I1-MS
06/07/2021
Permit issued — Plumbing
B00506933-I1-PL
05/28/2021
Permit issued — General Construction
B00482417-I1-GC-CX
05/25/2021
Filed — Alteration
Installation of mechanical systems ducting and piping
B00470583-I1
04/27/2021
Filed — Alteration
installation of new hand sink, 3 comp sink, commercial dish washer, and 2 floor drains. Replace existing mop sink, toilet and hand sink with new fixtures, replace grease interceptor, replace HWH.
B00506933-I1
04/07/2021
Filed — Alteration
INTERIOR FIT OUT OF PIZZA SHOP/ TAKE OUT ONLY WITH COMMERCIAL KITCHEN AT 1ST FLOOR. NO CHANGE TO USE GROUP, OCCUPANT LOAD, OR EGRESS. INSTALLATION OF MECHANCIAL EQUIPMENT AND ASSOCIATED DUCT WORK FOR HEATING AND COOLING.
B00482417-I1
12/05/2019
Filed — Alteration
Application to document existing gas piping for replaced rooftop HVAC unit. Filed in conjunction with alteration type 2, job# 321932414.
B00270833-I1
08/28/2019
Violation issued (FDNY_NOV, closed)
04/23/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/08/2019
Violation issued (FDNY_NOV, closed)
03/06/2018
Violation issued (FDNY_NOV, closed)
12/28/2016
Violation issued (FDNY_NOV, closed)
04/18/2016
Violation issued (FDNY_NOV, closed)
01/06/2016
Violation issued (ECB, closed)
Signs
12/18/2015
Violation issued (ECB, closed)
Signs
04/09/2015
Violation issued (FDNY_NOV, closed)
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJames Simpson & Son03/21/2025
DOB NOWPlumbingPermit IssuedJames Simpson & Son08/22/2022
DOB NOWSignSigned-offSigns Cad09/23/2021
DOB NOWSignPermit IssuedSigns Cad09/23/2021
DOB NOWMechanical SystemsSigned-offKaback Enterprises06/22/2021
DOB NOWPlumbingPermit IssuedJ. Caiazzo Plumbing & Heating06/07/2021
DOB NOWGeneral ConstructionSigned-offM-Pak Construction05/28/2021
BISPLISSUEDHydro Mechanical03/26/2026
BISPLISSUEDJames Simpson & Son03/09/2020
BISMHISSUEDJM Mechanical HVAC03/13/2019
BISMHISSUEDAdelphi Innovative Design04/18/2018
BISFPISSUEDMega Fire Protection09/19/2016
BISPLISSUEDDNA Plumbing Contractors08/06/2014
BISOTISSUEDGabe Construction and Development06/13/2014
BISPLISSUEDRao Plumbing & Heating01/03/2007
BISPLISSUEDAmok09/28/2005
BISMHISSUEDSni Construction Management09/21/2005
BIS—ISSUEDFrank Torrone & Sons09/20/2005
BISOTISSUEDSni Construction Management09/08/2005
BISOTISSUEDFerrandino & Son08/23/2005
BISMHISSUEDFerrandino & Son08/23/2005
BIS—ISSUEDNational Maintenace08/10/2005
BIS—ISSUEDNational Maintenace08/10/2005
BIS—ISSUEDNational Maintenace08/10/2005
BISPLISSUEDMercury PL & Heating07/25/2005
BISOTISSUEDFerrandino & Son07/21/2005
BISMHISSUEDFerrandino & Son07/21/2005
BISEQISSUEDVanort General Construction04/25/2005
BIS—ISSUEDVanort General Construction04/25/2005
BISMHISSUEDGabe Construction and Development03/29/2005
BISOTISSUEDGabe Construction and Development03/24/2005
BISPLISSUEDAce Contracting06/18/1999
BIS—ISSUEDPad Realty Dba/Campus Sugar Bowl03/12/1999
BISEQISSUEDPad Realty Dba/Campus Sugar Bowl03/12/1999
BISEQISSUEDPad Realty Corp T/A Campus Sugar08/19/1992
2 projects · most recent 09/08/2022
Gas Water/Sanitary
FiledStatusContractorScope
09/08/2022Permit IssuedJ. Caiazzo Plumbing & HeatingGas, Water/Sanitary
12/05/2019Permit IssuedJames Simpson & SonGas
4 projects · most recent 09/24/2021
General Wiring
FiledStatusContractorScope
09/24/2021CompleteSigns Cad—
09/24/2021CompleteSigns Cad—
06/14/2021CompleteWMS Electrical ContngGeneral Wiring
06/01/2021CompleteWMS Electrical Contng—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/05/2021Pass-Final Construction Permit WithdrawalPassView ↗
10/21/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/05/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/24/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/02/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/10/2022Mechanical SystemsFei Zengspecial
02/10/2022FinalFei Zengprogress
02/10/2022Maintenance informationFei Zengenergy_progress
02/10/2022Lighting controlsFei Zengenergy_progress
02/10/2022Interior lighting powerFei Zengenergy_progress
02/10/2022HVAC-R and service water piping design and insulationFei Zengenergy_progress
02/10/2022HVAC-R and service water heating system controlsFei Zengenergy_progress
02/10/2022HVAC-R and service water heating equipmentFei Zengenergy_progress
02/10/2022Ventilation and air distribution systemFei Zengenergy_progress
01/27/2022Mechanical SystemsFei Zengspecial
01/27/2022FinalFei Zengprogress
01/27/2022HVAC-R and service water piping design and insulationFei Zengenergy_progress
01/27/2022HVAC-R and service water heating equipmentFei Zengenergy_progress
01/27/2022Lighting controlsFei Zengenergy_progress
01/27/2022HVAC-R and service water heating system controlsFei Zengenergy_progress
01/27/2022Maintenance informationFei Zengenergy_progress
01/27/2022Ventilation and air distribution systemFei Zengenergy_progress
01/27/2022Interior lighting powerFei Zengenergy_progress
10/15/2021Mechanical SystemsANTHONY MUSUMECIspecial
10/15/2021Energy Code Compliance InspectionsANTHONY MUSUMECIprogress
10/15/2021FinalANTHONY MUSUMECIprogress
10/15/2021Maintenance informationANTHONY MUSUMECIenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Pizza HutRestaurant / Food ServiceFloors 1, 2
Project B00585819 Alteration · LOC Issued · 09/22/2021
Project B00506933 Alteration · Permit Entire · 04/27/2021
Project B00482417 Alteration · LOC Issued · 04/07/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch6
09/01/2026B00482417-P1Request digital key ↗
09/01/2026B00482417-I1Request digital key ↗
09/01/2026B00585819-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00470583-I1Request digital key ↗
08/15/2026B00470583-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00270833-I1Request digital key ↗
08/15/2026B00270833-P1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION7
03/14/2019321932414Open ↗
03/14/2018321797515Open ↗
09/14/2016321446084Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION6
03/10/2020321797515Open ↗
03/15/2019321932414Open ↗
04/18/2018321797515Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/31/2019321932414Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature19
10/09/2026B00482417-P1Open ↗
10/09/2026B00482417-P1Open ↗
10/09/2026B00482417-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00482417-I1Open ↗
09/01/2026B00482417-P1Open ↗
09/01/2026B00470583-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
03/14/2019321932414Open ↗
04/18/2018321797515Open ↗
03/14/2018321797515Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/14/2019321932414Open ↗
03/14/2018321797515Open ↗
09/14/2016321446084Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
10/09/2026B00482417-P1Open ↗
08/30/2026B00482417-I1Open ↗
08/26/2026B00470583-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/14/2019321932414Open ↗
06/12/2014340153808Open ↗
▸BISProfessional and Owner Certification (POC3)2
03/14/2018321797515Open ↗
09/14/2016321446084Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/12/2014340153808Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/12/2014340153808Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/14/2018321797515Open ↗
09/14/2016321446084Open ↗
▸BISSCHEDULE B - PLUMBING2
06/12/2014340153808Open ↗
09/21/2011320354969Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
03/14/2018321797515Open ↗
09/21/2011320354969Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00482417-P1Open ↗
09/01/2026B00482417-I1Open ↗
09/01/2026B00470583-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/14/2016321446084Open ↗
06/12/2014340153808Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/18/2019321932414Open ↗
03/14/2019321932414Open ↗
09/14/2016321446084Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00482417-I1Open ↗
08/13/2026B00470583-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/12/2014340153808Open ↗
▸BISNYCECC ANALYSIS1
06/12/2014340153808Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/18/2019321932414Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/12/2014340153808Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/18/2019321932414Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/12/2014340153808Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
09/21/2011320354969Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/18/2019321932414Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
04/18/2019321932414Open ↗
03/14/2019321932414Open ↗
03/14/2018321797515Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
03/14/2019321932414Open ↗
03/05/2018321797515Open ↗
09/06/2016321446084Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
06/12/2014340153808Open ↗
▸BISADDITIONAL INFORMATION1
02/20/2020321932414Open ↗
▸BISBOROUGH INTAKE FORM1
04/18/2019321932414Open ↗