Rent Stabilized34 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 37 LEE LLC · 1,426 sf lot · 1.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction38p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 5 docs
Floor 5Under Construction36p · 2 filings · 20 docs
Floor 4Under Construction37p · 2 filings · 20 docs
Floor 3Under Construction40p · 2 filings · 20 docs
Floor 2Under Construction39p · 1 filing · 20 docs
Floor 1Under Construction38p · 2 filings · 20 docs
CellarUnder Construction56p · 2 filings · 20 docs
Basement2p · 1 filing · 8 docs
1 job · most recent 06/30/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/30/2026Permit IssuedRMCH INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAM2-U1 36,000 BTU · Heat Pump Outdoor ×5
MXZ-SM48NAM2-U1 48,000 BTU · Heat Pump Outdoor ×2
SUZ-KA24NA2 24,000 BTU · Heat Pump Outdoor ×1
1 job · most recent 06/30/2026
Sprinkler System
FiledStatusContractorScope
06/30/2026Permit IssuedPIPING & PLUMBING SOLUTIOSprinkler System
1 job · most recent 06/30/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/30/2026Permit IssuedTAP PLUMBING CORPGas, Storm, Water/Sanitary
4 jobs · most recent 02/05/2026
General Wiring
FiledStatusContractorScope
02/05/2026Permit IssuedRICHARD NEU—
12/15/2025Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
01/03/2022Permit IssuedV. VASS ELECTRIC CORP—
05/30/2021CompleteTRUE POWER ELECL CONT LLC—
2 jobs · most recent 06/30/2026
Steel Concrete Masonry
FiledStatusContractorScope
06/30/2026Permit IssuedRMCH INCSteel
03/04/2022——Steel, Concrete, Masonry
1 job · most recent 06/30/2026
Fence
FiledStatusContractorScope
06/30/2026Permit IssuedRMCH INCFence
Building Lifecycle
All (208)Filed (20)Permit Issued (15)Signed Off (1)Violation (60)Inspection (6)Objection (76)Special Inspection (30)
08/13/2026
Objection raised — Other
07/24/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
07/22/2026
Objection resolved — Addressed
07/09/2026
Objection raised — Other
07/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT SIQECA
07/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT SIQECA
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT SIQECA
07/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT SIQECA
07/09/2026
Special inspection requirement — Sprinkler Systems
ROBERT SIQECA
07/09/2026
Special inspection requirement — Maintenance information
ROBERT SIQECA
07/09/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
ROBERT SIQECA
07/09/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT SIQECA
07/09/2026
Special inspection requirement — Seismic Isolation Systems
ROBERT SIQECA
07/09/2026
Special inspection requirement — Post-installed Anchors
ROBERT SIQECA
06/30/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER AND PLUMBING PLANS FILED HEREWITH.
B01179432-P6
06/30/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER AND PLUMBING PLANS FILED HEREWITH.
B01179432-P7
06/30/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT SIQECA
06/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT SIQECA
06/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT SIQECA
06/30/2026
Special inspection requirement — Sprinkler Systems
ROBERT SIQECA
06/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT SIQECA
06/30/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
ROBERT SIQECA
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT SIQECA
06/30/2026
Special inspection requirement — Post-installed Anchors
ROBERT SIQECA
06/30/2026
Special inspection requirement — Seismic Isolation Systems
ROBERT SIQECA
06/30/2026
Special inspection requirement — Maintenance information
ROBERT SIQECA
06/29/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT SIQECA
06/29/2026
Special inspection requirement — Lighting in dwelling units
ROBERT SIQECA
06/29/2026
Special inspection requirement — Permanent certificate
ROBERT SIQECA
06/29/2026
Special inspection requirement — Metering
ROBERT SIQECA
06/29/2026
Special inspection requirement — Insulation placement and R values
ROBERT SIQECA
06/29/2026
Special inspection requirement — Air barrier — testing
ROBERT SIQECA
06/29/2026
Special inspection requirement — Fenestration air leakage
ROBERT SIQECA
06/29/2026
Special inspection requirement — Protection of exposed foundation insulation
ROBERT SIQECA
06/29/2026
Special inspection requirement — Interior lighting power
ROBERT SIQECA
06/29/2026
Special inspection requirement — Lighting controls
ROBERT SIQECA
06/05/2026
Permit issued — Sidewalk Shed
B01355865-I1-SH
05/26/2026
Objection resolved — Addressed
05/21/2026
Objection raised — Other
05/05/2026
Violation issued (HPD, open)
A
05/04/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER AND PLUMBING PLANS FILED HEREWITH.
B01179432-P4
04/02/2026
Permit issued — General Construction
B01179432-I1-GC
03/26/2026
Permit issued — Construction Fence
B01179432-S5-FN
03/18/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/12/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER AND PLUMBING PLANS FILED HEREWITH.
B01179432-P3
03/04/2026
Violation issued (ECB, closed)
Construction
02/10/2026
Permit issued — Supported Scaffold
B01355866-I1-SF
02/10/2026
Permit issued — Sidewalk Shed
B01355865-I1-SH
02/09/2026
Filed — Alteration
B01355866-I1
02/09/2026
Filed — Alteration
B01355865-I1
02/09/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/05/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
02/05/2026
Objection resolved — Addressed
01/28/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/31/2025
Objection raised — Zoning
12/18/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER AND PLUMBING PLANS FILED HEREWITH.
B01179432-S7
12/11/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER AND PLUMBING PLANS FILED HEREWITH.
B01179432-P1
12/11/2025
Permit issued — Earth Work
B01179432-S8-FO-EA
12/03/2025
Permit issued — General Construction
B01179432-I1-GC
Latest 60 of 208 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
168- 170 CLYMER ST2309/13/2026
YELLOW HAT CONSTGRUCTION INC903/22/2026
RMCH103/22/2026
37 LEE LLC1203/22/2026
HERMAN LOWY 37 LEE LLC203/22/2026
OWNER OF 37 LEE AVE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO GALLOS606/30/2026
CHOSEN MEP, CORP.506/30/2026
BITOPI CONSULTANTS LLC202/09/2026
ROBERT SIQECA PE309/18/2025
AVISHAY I. MAZOR, P.E.203/04/2022
FL&M ENGINEERING DESIGN &INSPECTION101/11/2022
KNF SERVICES CROP104/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
KNF SERVICES CROP103/21/2026
RELIABLE EXPEDITING203/21/2026
EXPEDITER GROUP2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN D ENTERPRISESGeneral Contractor603/21/2026
RMCH INCGeneral Contractor606/27/2026
SUPREME INSTALLATIONS CORGeneral Contractor307/08/2026
GAGAN G.C. INCGeneral Contractor204/09/2026
SERGIO GIANNACHIElectrical103/21/2026
PIPING & PLUMBING SOLUTIOFire Protection107/08/2026
CARL WEISSElectrical103/21/2026
TAP PLUMBING CORPPlumbing107/08/2026
LELIS, ARILSONElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCTURAL ENGINEERING &56991106/30/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSUPREME INSTALLATIONS COR06/05/2026
DOB NOWGeneral ConstructionPermit IssuedRMCH INC04/02/2026
DOB NOWConstruction FencePermit IssuedGAGAN G.C. INC03/26/2026
DOB NOWSupported ScaffoldPermit IssuedSUPREME INSTALLATIONS COR02/10/2026
DOB NOWSidewalk ShedPermit IssuedSUPREME INSTALLATIONS COR02/10/2026
DOB NOWEarth WorkPermit IssuedRMCH INC12/11/2025
DOB NOWGeneral ConstructionPermit IssuedRMCH INC12/03/2025
DOB NOWPlumbingPermit IssuedEMPIRE PLUMBING INC12/02/2025
DOB NOWFoundationPermit IssuedRMCH INC11/18/2025
DOB NOWPlumbingPermit IssuedTAP PLUMBING CORP11/18/2025
DOB NOWStructuralSigned-offRMCH INC11/17/2025
DOB NOWMechanical SystemsPermit IssuedRMCH INC11/17/2025
DOB NOWConstruction FencePermit IssuedGAGAN G.C. INC11/10/2025
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES01/12/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES01/12/2022
BISOTISSUEDJSB WORKS INC07/05/2022
BISOTISSUEDYELLOW HAT CONSTRUCTION I12/16/2021
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/24/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/18/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/09/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/28/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 144
DateRequirementInspectorRole
07/09/2026Maintenance informationROBERT SIQECAenergy_progress
07/09/2026HVAC-R and service water heating equipmentROBERT SIQECAenergy_progress
07/09/2026HVAC-R and service water piping design and insulationROBERT SIQECAenergy_progress
07/09/2026HVAC-R and service water heating system controlsROBERT SIQECAenergy_progress
07/09/2026Energy Code Compliance InspectionsROBERT SIQECAprogress
07/09/2026Post-installed AnchorsROBERT SIQECAspecial
07/09/2026Sprinkler SystemsROBERT SIQECAspecial
07/09/2026Seismic Isolation SystemsROBERT SIQECAspecial
07/09/2026On-Site Private Sewage Disposal Systems InstallationROBERT SIQECAspecial
07/09/2026Fire-Resistant Penetrations and JointsROBERT SIQECAspecial
06/30/2026Post-installed AnchorsROBERT SIQECAspecial
06/30/2026Fire-Resistant Penetrations and JointsROBERT SIQECAspecial
06/30/2026HVAC-R and service water heating system controlsROBERT SIQECAenergy_progress
06/30/2026Maintenance informationROBERT SIQECAenergy_progress
06/30/2026HVAC-R and service water heating equipmentROBERT SIQECAenergy_progress
06/30/2026HVAC-R and service water piping design and insulationROBERT SIQECAenergy_progress
06/30/2026Energy Code Compliance InspectionsROBERT SIQECAprogress
06/30/2026Sprinkler SystemsROBERT SIQECAspecial
06/30/2026Seismic Isolation SystemsROBERT SIQECAspecial
06/30/2026On-Site Private Sewage Disposal Systems InstallationROBERT SIQECAspecial
06/29/2026Air barrier - visual inspectionROBERT SIQECAenergy_progress
06/29/2026Exterior lighting powerROBERT SIQECAenergy_progress
06/29/2026Lighting controlsROBERT SIQECAenergy_progress
06/29/2026Permanent certificateROBERT SIQECAenergy_progress
06/29/2026Interior lighting powerROBERT SIQECAenergy_progress
Latest 25 of 144.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch18
09/01/2026B00505237-I1Request digital key ↗
08/31/2026B00658208-I1Request digital key ↗
08/23/2026B01153502-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00301041-I1Request digital key ↗
08/15/2026B00301041-P1Request digital key ↗
▸Applications & Permits8
▸BISWORK PERMIT APPLICATION2
07/09/2022340759227Open ↗
12/17/2021340759227Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
08/28/2020340759227Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
05/06/2021340759227Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/28/2020340759227Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
05/06/2021340759227Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
05/06/2021340759227Open ↗
▸BISLL104/19 REQUEST FOR EXECEPTION TO PERMIT RESTRICTION1
12/15/2021340759227Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram5
08/20/2026B01179432-P6Open ↗
08/15/2026B01179432-P4Open ↗
08/15/2026B01179432-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/15/2026B01179432-P4Open ↗
08/15/2026B01179432-P6Open ↗
08/13/2026B01179432-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01179432-I1Open ↗
▸Seals & Professional Certifications53
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/01/2026B00505237-I1Open ↗
08/31/2026B00658208-I1Open ↗
08/20/2026B01179432-P4Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/27/2026B01179432-P6Open ↗
09/27/2026B01179432-P6Open ↗
09/02/2026B01179432-P4Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/27/2026B01179432-P6Open ↗
09/27/2026B01179432-P6Open ↗
09/02/2026B01179432-P4Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/28/2020340759227Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/15/2026B01179432-P4Open ↗
08/15/2026B01179432-P6Open ↗
08/13/2026B01179432-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/13/2026B00301041-I1Open ↗
08/13/2026B00301041-P1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
08/28/2020340759227Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01179432-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/17/2026B01179432-S5Open ↗
08/17/2026B01179432-P7Open ↗
08/17/2026B01179432-S7Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/28/2020340759227Open ↗
08/28/2020340759227Open ↗
▸Energy Compliance3
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
08/28/2020340759227Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/06/2021340759227Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/06/2021340759227Open ↗
▸Inspections & Test Reports8
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B01179432-S3Open ↗
08/13/2026B01179432-S8Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B01179432-S3Open ↗
08/13/2026B01179432-S8Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
05/06/2021340759227Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/06/2021340759227Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/28/2020340759227Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/06/2021340759227Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
11/04/2020340759227Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
08/28/2020340759227Open ↗
▸BISADDITIONAL INFORMATION1
10/25/2021340759227Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial4
08/15/2026B01179432-P4Open ↗
08/15/2026B01179432-P6Open ↗
08/13/2026B01179432-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026B01179432-P4Open ↗
08/15/2026B01179432-P6Open ↗
08/13/2026B01179432-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026B01179432-I1Open ↗
08/15/2026B01179432-P4Open ↗
08/15/2026B01179432-P6Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01179432-S8Open ↗