Miscellaneous educational facility
School in the Square Ecc
37 PARK TERRACE EAST · Inwood · BIN 1082065
💬 Discuss this project
1912Year Built
5Stories
W9Building Class
R7AZoning
7,939 sfGross Floor Area
0Units
0 Open Violations
Miscellaneous educational facility · Owner of record: NORTHEAST EDUCATION DEVELOPMENT CORP. · 5,975 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Attic99p · 4 filings · 20 docs
Floor 346p · 3 filings · 20 docs
Floor 2108p · 5 filings · 20 docs
Floor 1107p · 7 filings · 20 docs
Cellar75p · 2 filings · 20 docs
Sub-Basement32p · 3 filings · 20 docs
Site & exterior14p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AZIMUTH DEVELOPMENT GROUP LLC7107/08/2026
WESBUILT CONSTRUCTION MANAGERS807/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.3403/21/2026
A1 EXPEDITING SERVICE403/21/2026
AE DESIGN SOLUTION203/21/2026
W J PROFESSIONAL EXPEDITING COMPANY603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WESBUILT CONSTRUCTION MANGeneral Contractor1307/08/2026
REEM PLBG & HTG CORPPlumbing307/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor307/08/2026
REEM PLBG & HTG CORPFire Protection307/08/2026
VANQUISH GROUP INCGeneral Contractor207/08/2026
JEM CONTRACTING CORPGeneral Contractor203/21/2026
IPS PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT68641710/04/2024
JOEL PHAGOO ,PE, PLLC2416110/26/2023
PROJECT TACTICAL SOLUTION5859206/15/2021
Building Lifecycle
All (119)Filed (24)Permit Issued (20)Signed Off (11)Violation (16)Inspection (12)Objection (6)Special Inspection (30)
03/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/30/2024
Signed off — Alteration
Application is filed for the structural work related to the renovation of the existing school building as per plans
M08055507-I1
10/29/2024
Signed off — Alteration
Site Plumbing work related to the renovation and bulkhead enlargement of the existing school building as per plans
M00994371-I1
10/28/2024
Signed off — Alteration
Application is filed for the mechanical scope related to the renovation and bulkhead enlargement of the existing school building as per plans
M08055496-I1
10/21/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/16/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/08/2024
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
10/08/2024
Special inspection requirement — Sprinkler Systems
JUAN GOMEZ
10/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
10/04/2024
Filed — Alteration
Plumbing sprinkler work related to the renovation and bulkhead enlargement of the existing school building as per plans
M08055067-P4
09/30/2024
Signed off — Alteration
Site Plumbing work related to the renovation and bulkhead enlargement of the existing school building as per plans
M00994371-S1
09/26/2024
Special inspection requirement — Sprinkler Systems
JUAN GOMEZ
09/26/2024
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
09/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/25/2024
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
09/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
09/25/2024
Special inspection requirement — Interior lighting power
JUAN GOMEZ
09/25/2024
Special inspection requirement — Electrical motors and elevators
JUAN GOMEZ
09/25/2024
Special inspection requirement — Lighting controls
JUAN GOMEZ
09/25/2024
Special inspection requirement — Shutoff dampers
JUAN GOMEZ
09/25/2024
Special inspection requirement — Final
JUAN GOMEZ
09/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
JUAN GOMEZ
09/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
JUAN GOMEZ
09/25/2024
Special inspection requirement — Exterior lighting power
JUAN GOMEZ
09/19/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/17/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/17/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/16/2024
Filed — Alteration
Application is filed for the mechanical scope related to the renovation and bulkhead enlargement of the existing school building as per plans
M08055496-P1
09/16/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/16/2024
Special inspection requirement — Lighting controls
JUAN GOMEZ
09/16/2024
Special inspection requirement — Final
JUAN GOMEZ
09/16/2024
Special inspection requirement — Electrical motors and elevators
JUAN GOMEZ
09/16/2024
Special inspection requirement — Shutoff dampers
JUAN GOMEZ
09/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
09/16/2024
Special inspection requirement — Exterior lighting power
JUAN GOMEZ
09/16/2024
Special inspection requirement — Interior lighting power
JUAN GOMEZ
09/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
JUAN GOMEZ
09/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
JUAN GOMEZ
09/16/2024
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
08/29/2024
Signed off — Alteration
M00958492-I1
08/28/2024
Signed off — Alteration
M00960618-I1
08/19/2024
Permit issued — Mechanical Systems
M08055496-I1-MS
07/17/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
JUAN GOMEZ
07/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUAN GOMEZ
07/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
07/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
07/15/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/03/2024
Filed — Alteration
Plumbing sprinkler work related to the renovation and bulkhead enlargement of the existing school building as per plans
M08055067-P3
07/03/2024
Filed — Alteration CO
Application is filed for the renovation and bulkhead enlargement of the existing school building as per plans
M08050860-P5
06/12/2024
Filed — Alteration CO
Application is filed for the renovation and bulkhead enlargement of the existing school building as per plans
M08050860-P3
05/31/2024
Permit issued — Plumbing
M00994371-I1-PL
05/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2024
Violation issued (ECB, closed)
Construction
05/30/2024
Violation issued (ECB, closed)
Unknown
05/22/2024
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00948652-I1
05/22/2024
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00948652-S1
05/14/2024
Filed — Alteration CO
Application is filed for the renovation and bulkhead enlargement of the existing school building as per plans
M08050860-P2
05/01/2024
Filed — Alteration
Plumbing sprinkler work related to the renovation and bulkhead enlargement of the existing school building as per plans
M08055067-P2
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offWESBUILT CONSTRUCTION MAN08/19/2024
DOB NOWPlumbingSigned-offIPS PLUMBING CORP05/31/2024
DOB NOWGeneral ConstructionPermit IssuedWESBUILT CONSTRUCTION MAN03/15/2024
DOB NOWFoundationSigned-offWESBUILT CONSTRUCTION MAN02/26/2024
DOB NOWPlumbingSigned-offREEM PLBG & HTG CORP01/09/2024
DOB NOWPlumbingSigned-offREEM PLBG & HTG CORP01/09/2024
DOB NOWSprinklersSigned-offREEM PLBG & HTG CORP01/03/2024
DOB NOWSprinklersSigned-offREEM PLBG & HTG CORP01/03/2024
DOB NOWConstruction FenceSigned-offWESBUILT CONSTRUCTION MAN12/12/2023
DOB NOWSupport of ExcavationSigned-offWESBUILT CONSTRUCTION MAN12/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offJEM CONTRACTING CORP12/11/2023
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP10/27/2023
DOB NOWSupported ScaffoldSigned-offROCKLEDGE SCAFFOLD CORP10/27/2023
DOB NOWPlumbingSigned-offREEM PLBG & HTG CORP09/14/2023
DOB NOWPlumbingSigned-offREEM PLBG & HTG CORP09/14/2023
DOB NOWMechanical SystemsSigned-offWESBUILT CONSTRUCTION MAN08/31/2023
DOB NOWStructuralSigned-offWESBUILT CONSTRUCTION MAN08/31/2023
DOB NOWGeneral ConstructionPermit IssuedWESBUILT CONSTRUCTION MAN08/29/2023
DOB NOWConstruction FenceSigned-offVANQUISH GROUP INC05/04/2021
DOB NOWGeneral ConstructionSigned-offVANQUISH GROUP INC04/23/2021
BISFBISSUEDSTEPHEN BRAUN05/14/1999
BISBLISSUEDNEAL M. RUDIKOFF08/22/1996
1 project · most recent 10/04/2024
FiledStatusContractorScope
10/04/2024Signed-offREEM PLBG & HTG CORP836 heads
1 project · most recent 10/04/2024
Gas Water/Sanitary
FiledStatusContractorScope
10/04/2024Signed-offREEM PLBG & HTG CORPGas, Water/Sanitary
4 projects · most recent 11/04/2024
General Wiring
FiledStatusContractorScope
11/04/2024CompleteTWINTECH ELECTRIC INCGeneral Wiring
01/24/2024CompleteNEWBRIDGE ELECTL CONTNG—
12/22/2023CompleteTWINTECH ELECTRIC INC—
10/10/2023CompleteANTHONY G FERRY INC—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/16/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/16/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/15/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 108
DateRequirementInspectorRole
10/08/2024Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
10/08/2024Post-installed AnchorsJUAN GOMEZspecial
10/08/2024Sprinkler SystemsJUAN GOMEZspecial
09/26/2024Sprinkler SystemsJUAN GOMEZspecial
09/26/2024Post-installed AnchorsJUAN GOMEZspecial
09/26/2024Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
09/25/2024Shutoff dampersJUAN GOMEZenergy_progress
09/25/2024HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
09/25/2024HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
09/25/2024Mechanical SystemsJUAN GOMEZspecial
09/25/2024FinalJUAN GOMEZprogress
09/25/2024Exterior lighting powerJUAN GOMEZenergy_progress
09/25/2024Lighting controlsJUAN GOMEZenergy_progress
09/25/2024Interior lighting powerJUAN GOMEZenergy_progress
09/25/2024Electrical motors and elevatorsJUAN GOMEZenergy_progress
09/25/2024HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
09/16/2024Exterior lighting powerJUAN GOMEZenergy_progress
09/16/2024Mechanical SystemsJUAN GOMEZspecial
09/16/2024FinalJUAN GOMEZprogress
09/16/2024HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
09/16/2024HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
09/16/2024Electrical motors and elevatorsJUAN GOMEZenergy_progress
09/16/2024Lighting controlsJUAN GOMEZenergy_progress
09/16/2024HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
09/16/2024Interior lighting powerJUAN GOMEZenergy_progress
Latest 25 of 108.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Adlai E. Stevenson High SchoolEducation—
Project M08055507 Alteration · LOC Issued · 03/01/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
09/03/2026M00491123-I1Request digital key ↗
09/03/2026M00491116-I1Request digital key ↗
09/03/2026M00491116-P1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
05/13/2024102088198Open ↗
05/13/2024101325479Open ↗
▸DOB NOWHPD - Permit Notice1
09/03/2026M00491116-I1Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram5
08/27/2026M08050860-P3Open ↗
08/27/2026M08050860-P2Open ↗
08/27/2026M08050860-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/27/2026M08050860-P2Open ↗
08/27/2026M08050860-P1Open ↗
08/27/2026M08050860-P3Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications61
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/03/2026M00491123-I1Open ↗
09/03/2026M00491116-P1Open ↗
09/03/2026M00491116-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026M08050860-P5Open ↗
09/18/2026M00948652-S1Open ↗
09/02/2026M08055507-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026M08050860-P5Open ↗
09/02/2026M08055507-I1Open ↗
09/01/2026M00491116-P1Open ↗
Showing 3 of 17 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/27/2026M08050860-P1Open ↗
08/27/2026M08050860-P3Open ↗
08/27/2026M08050860-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/31/2026M08055067-I1Open ↗
08/26/2026M08055496-I1Open ↗
08/15/2026M00960013-I1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
08/31/2026M08055067-P3Open ↗
08/31/2026M08055067-I1Open ↗
08/31/2026M08055067-P1Open ↗
Showing 3 of 21 on file for this type
▸Other Documents22
▸DOB NOWSite Survey: Initial5
08/27/2026M08050860-P3Open ↗
08/27/2026M08050860-P2Open ↗
08/27/2026M08050860-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/27/2026M08050860-P3Open ↗
08/27/2026M08050860-P2Open ↗
08/27/2026M08050860-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/27/2026M08050860-P3Open ↗
08/27/2026M08050860-P2Open ↗
08/27/2026M08050860-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/27/2026M08050860-P3Open ↗
08/27/2026M08050860-P2Open ↗
08/27/2026M08050860-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00960013-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M08050860-I1Open ↗