← Back
Four families
37 PERRY STREET
MANHATTAN · BIN 1010929
💬 Discuss this project
1855Year Built
4Stories
C3Building Class
R6Zoning
6,750 sfGross Floor Area
4Units
Rent Stabilized0 Open Violations
Four families · Owner of record: PERRY STREET 3739 LLC · 2,516 sf lot · 2.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Roof11p · 4 filings · 20 docs
Penthouse2p · 1 filing · 20 docs
Floor 101p · 1 filing · 19 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 52p · 1 filing · 19 docs
Floor 41p · 2 filings · 20 docs
Floor 38p · 4 filings · 20 docs
Floor 24p · 3 filings · 20 docs
Floor 1
Cellar13p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PERRY STREET 3739 LLC3003/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/08/2019$19.2M—— → —$2,852/sf building
06/14/2018$17.5M—— → —$2,593/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BECHT ENGINEERING BT, INC.1012/03/2025
KZ ENGINEERING, P.C903/18/2025
PLAN B ENGINEERING603/14/2025
ROBERT SILMAN ASSOC STRUCT ENG DPC610/24/2024
ASHRAF CORP406/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC403/21/2026
SYNERGY BUILDING CONSULTANTS903/21/2026
EUROCELT EXPEDITING, INC203/21/2026
J CALLAHAN CONSULTING3403/21/2026
S DONADIC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S. DONADIC INCGeneral Contractor3607/08/2026
CEPRINE CONSTRUCTION INCGeneral Contractor2207/08/2026
WARREN OSTROFFElectrical403/21/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor407/08/2026
WARREN OSTROFF ELEC., INCElectrical403/22/2026
DONATO PLUMBING, INCPlumbing407/08/2026
KG SPRINKLER CORPFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4232512/03/2025
GZA GEOENVIRONMENTAL OF N1179403/14/2025
Building Lifecycle
All (168)Filed (35)Permit Issued (39)Signed Off (12)Violation (21)Inspection (7)Objection (24)Special Inspection (30)
03/25/2026
Signed off — Alteration
plumbing work for a single family home
M00401475-I1
01/29/2026
Signed off — Alteration
MECHANICAL WORK PROPOSED FOR A SINGLE FAMILY HOME
M00401459-I1
01/06/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Young Suh
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
12/19/2025
Objection resolved — Addressed
12/17/2025
Objection raised — Admin
12/08/2025
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR A SINGLE FAMILY HOME
M00401446-I1
12/03/2025
Filed — Alteration
plumbing work for a single family home
M00401475-P6
10/31/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
10/16/2025
Special inspection requirement — Final
Young Suh
10/16/2025
Special inspection requirement — Mechanical Systems
Young Suh
10/16/2025
Special inspection requirement — Heating Systems
Young Suh
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
10/09/2025
Special inspection requirement — Sprinkler Systems
Young Suh
10/02/2025
Objection resolved — Addressed
09/15/2025
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR A SINGLE FAMILY HOME
M00401446-P2
09/12/2025
Objection resolved — Addressed
09/10/2025
Objection raised — Cost
09/10/2025
Objection raised — Scope
08/27/2025
Filed — Alteration
MECHANICAL WORK PROPOSED FOR A SINGLE FAMILY HOME
M00401459-P1
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/18/2025
Special inspection requirement — Sprinkler Systems
Young Suh
08/06/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00785154-I1
08/06/2025
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00785145-I1
07/17/2025
Permit issued — Supported Scaffold
M00785154-I1-SF
07/16/2025
Signed off — Alteration
M00896200-I1
07/16/2025
Signed off — Alteration
INSTALLATION OF 8FT CONSTRUCTION FENCE
M00548199-I1
07/15/2025
Permit issued — Sidewalk Shed
M00785145-I1-SH
06/30/2025
Permit issued — Mechanical Systems
M00401459-I1-MS
05/13/2025
Permit issued — Plumbing
M00401475-I1-PL
04/02/2025
Signed off — Alteration
The means and methods for the partial demolition of an existing residential building.
M00658860-I1
03/20/2025
Special inspection requirement — Final
John McErlean
03/20/2025
Special inspection requirement — Demolition
Young Suh
03/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Cassandra Wetzel
03/20/2025
Special inspection requirement — Post-installed Anchors
Young Suh
03/18/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00785154-P6
03/14/2025
Filed — Alteration
The means and methods for the partial demolition of an existing residential building.
M00658860-P3
03/12/2025
Special inspection requirement — Demolition
Young Suh
03/12/2025
Special inspection requirement — Post-installed Anchors
Young Suh
03/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Cassandra Wetzel
03/12/2025
Special inspection requirement — Final
John McErlean
01/30/2025
Violation issued (ECB, closed)
Unknown
01/29/2025
Violation issued (ECB, closed)
Unknown
01/29/2025
Violation issued (ECB, closed)
Construction
01/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/10/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/07/2025
Permit issued — Sprinklers
M00401446-I1-EW-SP
12/11/2024
Signed off — Alteration
STRUCTURAL WORK PROPOSED FOR A SINGLE FAMILY DWELLING. REPLACE FLOOR STRUCTURE WITH NEW C-JOISTS AND STEEL FRAMING AT FLOORS 1 - 2. NEW PENTHOUSE ROOF FRAMING ADDED WITH C-JOISTS AND STEEL FRAMING.
M00401441-I1
11/15/2024
Special inspection requirement — Final
Young Suh
11/15/2024
Special inspection requirement — Post-installed Anchors
Young Suh
11/15/2024
Special inspection requirement — Masonry
Young Suh
11/15/2024
Special inspection requirement — Concrete - Cast-In-Place
Young Suh
11/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
11/15/2024
Special inspection requirement — Structural Steel - Details
Young Suh
11/15/2024
Special inspection requirement — Structural Steel - Welding
Young Suh
11/15/2024
Special inspection requirement — Structural Cold-Formed Steel
Young Suh
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC07/17/2025
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC07/15/2025
DOB NOWMechanical SystemsSigned-offSAPOL CONSTRUCTION LLC06/30/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC05/13/2025
DOB NOWSprinklersSigned-offH M SPRINKLER INC01/07/2025
DOB NOWGeneral ConstructionSigned-offSAPOL CONSTRUCTION LLC08/01/2024
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC07/31/2024
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC07/31/2024
DOB NOWProtection and Mechanical MethodsSigned-offSAPOL CONSTRUCTION LLC07/30/2024
DOB NOWConstruction FenceSigned-offSAPOL CONSTRUCTION LLC07/29/2024
DOB NOWMechanical SystemsSigned-offSAPOL CONSTRUCTION LLC07/29/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC05/09/2024
DOB NOWSupported ScaffoldSigned-offINTERSYSTEMS INSTAL S&S01/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEMS INSTAL S&S11/20/2023
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC08/14/2023
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC08/10/2023
DOB NOWGeneral ConstructionSigned-offSAPOL CONSTRUCTION LLC08/04/2023
DOB NOWGeneral ConstructionSigned-offSAPOL CONSTRUCTION LLC08/03/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAPOL CONSTRUCTION LLC08/01/2023
DOB NOWConstruction FenceSigned-offSAPOL CONSTRUCTION LLC08/01/2023
DOB NOWMechanical SystemsSigned-offSAPOL CONSTRUCTION LLC08/01/2023
DOB NOWStructuralSigned-offSAPOL CONSTRUCTION LLC08/01/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAPOL CONSTRUCTION LLC06/29/2023
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC05/16/2023
DOB NOWStructuralSigned-offSAPOL CONSTRUCTION LLC01/24/2023
DOB NOWStructuralSigned-offSAPOL CONSTRUCTION LLC01/04/2023
DOB NOWMechanical SystemsSigned-offSAPOL CONSTRUCTION LLC01/04/2023
DOB NOWConstruction FenceSigned-offSAPOL CONSTRUCTION LLC01/04/2023
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC08/22/2022
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC08/19/2022
DOB NOWGeneral ConstructionSigned-offSAPOL CONSTRUCTION LLC08/09/2022
DOB NOWStructuralSigned-offSAPOL CONSTRUCTION LLC08/09/2022
DOB NOWConstruction FenceSigned-offSAPOL CONSTRUCTION LLC08/08/2022
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC05/27/2022
DOB NOWSprinklersSigned-offH M SPRINKLER INC05/27/2022
DOB NOWMechanical SystemsSigned-offSAPOL CONSTRUCTION LLC11/10/2021
DOB NOWStructuralSigned-offSAPOL CONSTRUCTION LLC11/09/2021
DOB NOWConstruction FenceSigned-offSAPOL CONSTRUCTION LLC08/09/2021
DOB NOWConstruction FenceSigned-offSAPOL CONSTRUCTION LLC07/19/2021
BIS—ISSUEDS. DONADIC INC06/30/2025
+ 17 more permits on file
4 projects · most recent 12/10/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
12/10/2025CompleteWARREN OSTROFF ELEC., INCGeneral Wiring, HVAC Wiring
10/21/2022CompleteWARREN OSTROFF ELEC., INC—
09/01/2022CompleteBOROWIDE ELECT'L CONTR'S—
12/18/2020CompleteWARREN OSTROFF ELEC., INC—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/31/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/10/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
01/06/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYoung Suhspecial
01/06/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
10/16/2025Heating SystemsYoung Suhspecial
10/16/2025Mechanical SystemsYoung Suhspecial
10/16/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
10/16/2025FinalYoung Suhprogress
10/09/2025Sprinkler SystemsYoung Suhspecial
10/09/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
08/18/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
08/18/2025Sprinkler SystemsYoung Suhspecial
03/20/2025Structural Stability – Alterations of existing buildingsCassandra Wetzelspecial
03/20/2025Post-installed AnchorsYoung Suhspecial
03/20/2025DemolitionYoung Suhspecial
03/20/2025FinalJohn McErleanprogress
03/12/2025DemolitionYoung Suhspecial
03/12/2025FinalJohn McErleanprogress
03/12/2025Structural Stability – Alterations of existing buildingsCassandra Wetzelspecial
03/12/2025Post-installed AnchorsYoung Suhspecial
11/15/2024Structural Steel - DetailsYoung Suhspecial
11/15/2024Structural Stability – Alterations of existing buildingsYoung Suhspecial
11/15/2024Concrete - Cast-In-PlaceYoung Suhspecial
11/15/2024MasonryYoung Suhspecial
11/15/2024Post-installed AnchorsYoung Suhspecial
11/15/2024FinalYoung Suhprogress
11/15/2024Structural Steel - High Strength BoltingYoung Suhspecial
Latest 25 of 72.
▾Documents — 404 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch20
09/03/2026M00548199-I1Request digital key ↗
09/02/2026M00658860-P1Request digital key ↗
09/02/2026M00658860-P3Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Structural5
09/03/2026M00401441-P3Request digital key ↗
09/03/2026M00401441-P5Request digital key ↗
08/15/2026M00401441-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/02/2026M00401475-P2Request digital key ↗
09/02/2026M00401475-I1Request digital key ↗
08/15/2026M00401475-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/29/2026M00401446-I1Request digital key ↗
08/15/2026M00401446-P1Request digital key ↗
08/15/2026M00401446-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00401459-I1Request digital key ↗
08/15/2026M00401459-P1Request digital key ↗
▸Applications & Permits74
▸BISPLAN / WORK APPROVAL APPLICATION54
11/19/2025140967746Open ↗
11/17/2025140967746Open ↗
11/17/2025140967746Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWLPC Approval/Permit12
09/03/2026M00401459-I1Open ↗
09/03/2026M00401441-P3Open ↗
08/15/2026M00401441-P2Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION6
08/11/2023140967746Open ↗
06/30/2023140967746Open ↗
12/17/2021140967746Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/23/2025141003152Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/01/2025140967746Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM3
08/26/2021140967746Open ↗
Showing 1 of 3 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING RESOLUTION DETERMINATION1
02/08/2021140967746Open ↗
▸BISAMENDED ZONING DIAGRAM1
09/23/2025140967746Open ↗
▸Seals & Professional Certifications87
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/03/2026M00548199-I1Open ↗
09/03/2026M00401459-I1Open ↗
09/03/2026M00401441-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/02/2026M00401441-P1Open ↗
09/02/2026M00401441-P1Open ↗
09/01/2026M00401446-P2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026M00401441-P1Open ↗
09/01/2026M00401441-P5Open ↗
08/31/2026M00401441-P2Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
05/27/2021123833762Open ↗
05/27/2021123833762Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/05/2021141003152Open ↗
11/19/2020140975327Open ↗
11/10/2020140967746Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/05/2021141003152Open ↗
11/10/2020140967746Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/19/2020140975327Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/19/2020140975327Open ↗
▸Trade Schedules & Equipment2
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
11/20/2025140967746Open ↗
08/25/2021140967746Open ↗
▸Safety & Tenant Protection12
▸BISSTREET TREE CHECKLIST4
11/23/2020140967746Open ↗
11/10/2020140967746Open ↗
Showing 2 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
05/27/2021123833762Open ↗
05/27/2021123833762Open ↗
05/27/2021123833762Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/05/2021141003152Open ↗
▸BISSTREET TREE SIGNOFF1
02/25/2025140967746Open ↗
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
03/04/2025123833762Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/14/2021140967746Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/02/2026M00765793-I1Open ↗
08/29/2026M00401446-I1Open ↗
08/15/2026M00658860-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
11/19/2020140975327Open ↗
10/28/2020123833762Open ↗
10/21/2020123833762Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
12/15/2025141003152Open ↗
09/13/2021140967746Open ↗
▸Energy Compliance3
▸BISENERGY CODE 1ST REVIEW COMPLETE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC EXEMPTION1
11/10/2020140967746Open ↗
▸Inspections & Test Reports46
▸BISTECHNICAL REPORT: RESPONSIBILITY28
03/04/2025123833762Open ↗
03/04/2025123833762Open ↗
02/28/2025123833762Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT3
09/12/2025140967746Open ↗
02/27/2025123833762Open ↗
08/26/2021140967746Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
11/28/2023123833762Open ↗
08/26/2021140967746Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/04/2025123833762Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
05/27/2021123833762Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
05/27/2021123833762Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/16/2025123833762Open ↗
▸BISBPP: FIELD INSPECTION1
12/23/2025141003152Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/04/2025123833762Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/04/2025140967746Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/04/2025140967746Open ↗
▸Approvals, Objections & Sign-offs23
▸BISSCHEDULE A - OCCUPANCY / USE10
11/19/2025140967746Open ↗
11/17/2025140967746Open ↗
11/17/2025140967746Open ↗
Showing 3 of 10 on file for this type
▸BISLANDMARKS APPROVAL5
06/05/2025141003152Open ↗
10/10/2023140967746Open ↗
09/01/2021123833762Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/23/2025141003152Open ↗
03/11/2025140975327Open ↗
03/04/2025123833762Open ↗
▸BISLANDMARKS SIGNOFF3
12/23/2025141003152Open ↗
03/04/2025123833762Open ↗
02/25/2025140975327Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
12/23/2025141003152Open ↗
12/15/2025141003152Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT11
02/28/2025123833762Open ↗
04/11/2024123833762Open ↗
04/16/2021123833762Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
07/10/2025140967746Open ↗
02/26/2025123833762Open ↗
02/19/2025140975327Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
12/23/2025141003152Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
08/11/2023140967746Open ↗
▸Filing & Intake Forms50
▸BISADDITIONAL INFORMATION31
10/06/2025140967746Open ↗
09/23/2025140967746Open ↗
07/11/2025140967746Open ↗
Showing 3 of 31 on file for this type
▸BISBOROUGH INTAKE FORM8
08/08/2023140967746Open ↗
06/30/2023140967746Open ↗
12/17/2021140967746Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/05/2021141003152Open ↗
11/19/2020140975327Open ↗
11/10/2020140967746Open ↗
▸DOB NOWAI1 Form2
08/13/2026M00401446-I1Open ↗
08/13/2026M00401446-P2Open ↗
▸Other Documents29
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
04/17/2025141003152Open ↗
03/08/2021140967746Open ↗
02/08/2021140967746Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWWaiver Document6
09/03/2026M00401459-I1Open ↗
08/13/2026M00401475-I1Open ↗
08/13/2026M00401459-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026M00658860-P3Open ↗
08/13/2026M00658860-P1Open ↗
08/13/2026M00658860-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM3
11/10/2020140967746Open ↗
Showing 1 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
08/05/2021141003152Open ↗
▸BISCHIMNEYS AND VENTS1
11/04/2025140967746Open ↗
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)1
01/28/2026140967746Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
08/25/2021140967746Open ↗
▸BISLOWEST FLOOR ELEVATION1
09/13/2021140967746Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
12/23/2025141003152Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00658860-I1Open ↗