37 SKILLMAN AVENUE
BROOKLYN · BIN 3068360
💬 Discuss this project
1920Year Built
10Stories
D6Building Class
M1-2/R6Zoning
50,170 sfGross Floor Area
49Units
LL97 Covered1 Open Violation ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: MEEKER AVE PROPERTIES LLC · 11,647 sf lot · 4.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 4 filings · 20 docs
Floor 94p · 1 filing · 20 docs
Floor 84p · 1 filing · 20 docs
Floor 74p · 1 filing · 20 docs
Floor 64p · 1 filing · 20 docs
Floor 54p · 1 filing · 20 docs
Floor 44p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 25p · 2 filings · 20 docs
Floor 14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PSG CONSTRUCTION7309/13/2026
UNITED RESTORATION DEVELOPMENT107/25/2026
JVS CONTRACTING GROUP303/22/2026
MEEKER AVE PROPERTIES LLC103/22/2026
P.S.G. CONTRACTORS103/22/2026
PSG CONST CO603/22/2026
PSB CONST CO103/22/2026
2150 MILL DEVELOPEMENT603/21/2026
240 MEEKER AVENUE2203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC2403/21/2026
AE DESIGN SOLUTION1603/21/2026
HIERARCH-E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor1908/26/2026
YEVGENY KOLTUNOVElectrical603/21/2026
PSG CONSTRUCTION CO.,INCGeneral Contractor507/08/2026
STARLITE PLBG & HTG CORPPlumbing407/08/2026
OPTIMAL ELECTRIC INC 004689General Contractor403/22/2026
WATERFIRE INCPlumbing207/08/2026
FIREQUEST CORPFire Protection207/08/2026
J&S CONTRACTING GROUP INCGeneral Contractor106/27/2026
L.J.F. & SONS ELECL CONTSElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
URBAN INTEGRATIONS LLC7993107/13/2026
SCALAR ARCHITECTURE PC4696104/22/2026
CENTURY TESTING & CONSULT4081406/11/2025
METRIC CONSULTING AND INS1803704/08/2022
Building Lifecycle
All (167)Filed (23)Permit Issued (27)Signed Off (11)Facade (FISP) (6)Violation (52)Inspection (2)Objection (16)Special Inspection (30)
08/25/2026
Permit issued — Sidewalk Shed
B00870940-I1-SH
07/24/2026
Permit issued — Suspended Scaffold
B01414301-I1-SC
07/13/2026
Filed — Alteration
Installation of a suspended scaffold for facade inspection only as per plan submitted. No change to egress or occupancy.
B01414301-I1
07/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
07/07/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
DANNY TRUJILLO
07/07/2026
Special inspection requirement — Post-installed Anchors
DANNY TRUJILLO
06/25/2026
Permit issued — General Construction
B01383275-I1-GC
05/29/2026
Permit issued — Sidewalk Shed
B00870940-I1-SH
04/22/2026
Filed — Alteration
FACADE REPAIR AS PER PLANS. FACADE CLADDING INSTALLATION ON EAST ELEVATION. FILED FOR FACADE WORK PERMIT ONLY. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B01383275-I1
02/05/2026
Cycle 10 facade report submitted
02/05/2026
Cycle 10 facade report signed — SAFE
12/09/2025
Cycle 10 facade inspection completed
07/10/2025
Signed off — Alteration
INSTALL 42 NEW MINI-SPLIT / AC HEAT PUMP FOR HEATING AND COOLING OF RESIDENTIAL UNITS IN AN EXISTING MULTIPLE DWELLING BUILDING.NO CHANGE IN USE, OCCUPANCY, OR MEANS OR EGRESS
B01191818-S1
07/09/2025
Signed off — Alteration
INSTALL 42 NEW MINI-SPLIT / AC HEAT PUMP FOR HEATING AND COOLING OF RESIDENTIAL UNITS IN AN EXISTING MULTIPLE DWELLING BUILDING.NO CHANGE IN USE, OCCUPANCY, OR MEANS OR EGRESS
B01191818-I1
07/02/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANZ SEBORGA
06/20/2025
Special inspection requirement — Maintenance information
FRANZ SEBORGA
06/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
FRANZ SEBORGA
06/20/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANZ SEBORGA
06/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
FRANZ SEBORGA
06/18/2025
Filed — Alteration
INSTALL 42 NEW MINI-SPLIT / AC HEAT PUMP FOR HEATING AND COOLING OF RESIDENTIAL UNITS IN AN EXISTING MULTIPLE DWELLING BUILDING.NO CHANGE IN USE, OCCUPANCY, OR MEANS OR EGRESS
B01191818-P2
06/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
FRANZ SEBORGA
06/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/18/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANZ SEBORGA
06/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANZ SEBORGA
06/18/2025
Special inspection requirement — Maintenance information
FRANZ SEBORGA
06/11/2025
Filed — Alteration
INSTALL 42 NEW MINI-SPLIT / AC HEAT PUMP FOR HEATING AND COOLING OF RESIDENTIAL UNITS IN AN EXISTING MULTIPLE DWELLING BUILDING.NO CHANGE IN USE, OCCUPANCY, OR MEANS OR EGRESS
B01191818-P1
06/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
FRANZ SEBORGA
06/11/2025
Special inspection requirement — Final
FRANZ SEBORGA
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANZ SEBORGA
06/11/2025
Special inspection requirement — Mechanical Systems
FRANZ SEBORGA
06/11/2025
Special inspection requirement — Maintenance information
FRANZ SEBORGA
06/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANZ SEBORGA
06/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
FRANZ SEBORGA
06/02/2025
Permit issued — Sidewalk Shed
B00870940-I1-SH
04/30/2025
Permit issued — Mechanical Systems
B01191818-I1-MS
04/21/2025
Permit issued — Plumbing
B01191818-S1-PL
04/04/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS. RACKED USING A PRE-ENGINEERED RACKING SYSTEM. THE RACKED MODULES WILL BE ELECTRICALLY CONNECTED WITH DC TO AC POWER INVERTERS AND INTERCONNECTED TO THE LOCAL UTILITY USING MEANS AND METHODS CONSISTANT WITH THE UTILITY.
B01080275-I1
03/19/2025
Filed — Alteration
INSTALL 42 NEW MINI-SPLIT / AC HEAT PUMP FOR HEATING AND COOLING OF RESIDENTIAL UNITS IN AN EXISTING MULTIPLE DWELLING BUILDING.NO CHANGE IN USE, OCCUPANCY, OR MEANS OR EGRESS
B01191818-S1
03/14/2025
Filed — Alteration
INSTALL 42 NEW MINI-SPLIT / AC HEAT PUMP FOR HEATING AND COOLING OF RESIDENTIAL UNITS IN AN EXISTING MULTIPLE DWELLING BUILDING.NO CHANGE IN USE, OCCUPANCY, OR MEANS OR EGRESS
B01191818-I1
03/11/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00870946-I1
02/03/2025
Violation issued (ECB, closed)
Construction
10/21/2024
Permit issued — Solar
B01080275-I1-SL
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
08/06/2024
Objection resolved — Addressed
08/06/2024
Objection resolved — Addressed
08/06/2024
Objection resolved — Addressed
08/06/2024
Objection resolved — Addressed
07/22/2024
Filed — Alteration
Suspended scaffold installation and use as per plans filed herewith.
B01083495-I1
07/22/2024
Permit issued — Suspended Scaffold
B01083495-I1-SC
07/22/2024
Objection raised — Structural
07/22/2024
Objection raised — Other
07/22/2024
Objection raised — Inspections
07/22/2024
Objection raised — Scope
07/22/2024
Objection raised — Other
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOLDING08/25/2026
DOB NOWSuspended ScaffoldPermit IssuedUNITED REST. AND DEV. COR07/24/2026
DOB NOWGeneral ConstructionPermit IssuedJ&S CONTRACTING GROUP INC06/25/2026
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOLDING05/29/2026
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL06/02/2025
DOB NOWMechanical SystemsSigned-offPSG CONSTRUCTION CO.,INC04/30/2025
DOB NOWPlumbingSigned-offWATERFIRE INC04/21/2025
DOB NOWSolarSigned-offPSG CONSTRUCTION CO.,INC10/21/2024
DOB NOWSuspended ScaffoldPermit IssuedJ.V.S. CONTRACTING GROUP07/22/2024
DOB NOWSupported ScaffoldSigned-offPOWERS BRIDGING & SCAFFOL06/04/2024
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL06/03/2024
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL06/13/2023
DOB NOWSupported ScaffoldSigned-offPOWERS BRIDGING & SCAFFOL06/10/2023
DOB NOWPlumbingSigned-offSTARLITE PLBG & HTG CORP04/26/2021
DOB NOWBoiler EquipmentSigned-offSTARLITE PLBG & HTG CORP04/26/2021
DOB NOWMechanical SystemsSigned-offPSG CONSTRUCTION CO.,INC04/19/2021
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL08/20/2020
DOB NOWBoiler EquipmentSigned-offSTARLITE PLBG & HTG CORP08/04/2020
DOB NOWSprinklersSigned-offFIREQUEST CORP07/29/2020
DOB NOWPlumbingSigned-offFIREQUEST CORP07/29/2020
DOB NOWMechanical SystemsSigned-offPSG CONSTRUCTION CO.,INC06/15/2020
DOB NOWPlumbingSigned-offSTARLITE PLBG & HTG CORP06/03/2020
DOB NOWSupported ScaffoldSigned-offPOWERS BRIDGING & SCAFFOL03/30/2020
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL03/27/2020
DOB NOWSupported ScaffoldSigned-offPOWERS BRIDGING & SCAFFOL10/16/2019
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL09/19/2019
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL05/24/2019
BISOTISSUEDPSG CONSTRUCTION CO.,INC04/19/2021
BIS—ISSUEDPSG CONSTRUCTION CO.,INC04/19/2021
BIS—ISSUEDPSG CONSTRUCTION CO.,INC06/29/2020
BISOTISSUEDPSG CONSTRUCTION CO.,INC05/04/2020
BISOTISSUEDPSG CONSTRUCTION CO.,INC02/21/2020
BISOTISSUEDPOWERS BRIDGING & SCAFFOLDING03/14/2019
BISOTISSUEDPOWERS BRIDGING & SCAFFOLDING08/15/2018
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING06/18/2018
BISOTISSUEDPOWERS BRIDGING & SCAFFOLDING12/11/2015
BIS—RE-ISSUEDPOWERS BRIDGING & SCAFFOLDING09/18/2015
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING09/04/2015
BIS—RE-ISSUEDPSG CONSTRUCTION CO.,INC05/31/2013
BISEQISSUEDPSG CONSTRUCTION CO.,INC03/26/2013
+ 37 more permits on file
7 projects · most recent 03/26/2026
General Wiring
FiledStatusContractorScope
03/26/2026Permit IssuedOPTIMAL ELECTRIC, INC—
07/14/2025CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
03/06/2025CompleteOPTIMAL ELECTRIC, INC—
09/01/2022CompleteL.J.F. & SONS ELECL CONTSGeneral Wiring
06/21/2021CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
09/26/2019CompleteOPTIMAL ELECTRIC, INC—
05/22/2019CompleteOPTIMAL ELECTRIC, INC—
1 project · most recent 08/11/2023
Sidewalk Shed
FiledStatusContractorScope
08/11/2023Permit IssuedPOWERS BRIDGING & SCAFFOLSidewalk Shed
2 projects · most recent 07/13/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/13/2026Permit IssuedUNITED REST. AND DEV. CORSuspended Scaffold (SC)
07/22/2024Permit IssuedJ.V.S. CONTRACTING GROUPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/02/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
07/07/2026Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
07/07/2026Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
07/07/2026Post-installed AnchorsDANNY TRUJILLOspecial
06/20/2025HVAC-R and service water piping design and insulationFRANZ SEBORGAenergy_progress
06/20/2025Maintenance informationFRANZ SEBORGAenergy_progress
06/20/2025HVAC-R and service water heating equipmentFRANZ SEBORGAenergy_progress
06/20/2025Energy Code Compliance InspectionsFRANZ SEBORGAprogress
06/20/2025Tenant Protection Plan ComplianceFRANZ SEBORGAspecial
06/18/2025HVAC-R and service water heating equipmentFRANZ SEBORGAenergy_progress
06/18/2025Tenant Protection Plan Compliance—special
06/18/2025Energy Code Compliance InspectionsFRANZ SEBORGAprogress
06/18/2025HVAC-R and service water piping design and insulationFRANZ SEBORGAenergy_progress
06/18/2025Maintenance informationFRANZ SEBORGAenergy_progress
06/11/2025Tenant Protection Plan Compliance—special
06/11/2025HVAC-R and service water heating equipmentFRANZ SEBORGAenergy_progress
06/11/2025FinalFRANZ SEBORGAprogress
06/11/2025Energy Code Compliance InspectionsFRANZ SEBORGAprogress
06/11/2025Mechanical SystemsFRANZ SEBORGAspecial
06/11/2025Maintenance informationFRANZ SEBORGAenergy_progress
06/11/2025HVAC-R and service water piping design and insulationFRANZ SEBORGAenergy_progress
06/11/2025HVAC-R and service water heating system controlsFRANZ SEBORGAenergy_progress
07/12/2024Fire-Resistant Penetrations and JointsALDO BRAVOspecial
07/12/2024Structural Stability – Alterations of existing buildingsALDO BRAVOspecial
07/12/2024Energy Code Compliance InspectionsALDO BRAVOprogress
07/12/2024FinalALDO BRAVOprogress
Latest 25 of 43.
▾Documents — 384 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch12
08/27/2026B00870940-I1Request digital key ↗
08/27/2026B00870940-P1Request digital key ↗
08/26/2026B00870946-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/02/2026B00170915-I1Request digital key ↗
09/02/2026B00225066-I1Request digital key ↗
09/02/2026B00384884-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
08/30/2026B00328302-P1Request digital key ↗
08/30/2026B00328302-I1Request digital key ↗
08/15/2026B00328302-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
08/30/2026B00328302-P1Request digital key ↗
08/30/2026B00328302-I1Request digital key ↗
08/15/2026B00328302-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/01/2026B00342650-P1Request digital key ↗
09/01/2026B00342650-I1Request digital key ↗
08/15/2026B00342650-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/30/2026B00328302-I1Request digital key ↗
08/30/2026B00328302-P1Request digital key ↗
08/15/2026B00328302-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00243192-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00377762-I1Request digital key ↗
▸Applications & Permits73
▸BISPLAN / WORK APPROVAL APPLICATION44
04/24/2023321926449Open ↗
03/02/2023321926449Open ↗
12/21/2022321926449Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION20
06/29/2020321926449Open ↗
08/16/2018321284800Open ↗
06/21/2018302348109Open ↗
Showing 3 of 20 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1134
05/07/2019300700604Open ↗
05/07/2019300700542Open ↗
04/23/2019300700542Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
05/20/2020321926449Open ↗
05/20/2020321926449Open ↗
05/20/2020321926449Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/21/2021321926449Open ↗
▸Seals & Professional Certifications92
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/02/2026B00170915-I1Open ↗
08/27/2026B00870940-P1Open ↗
08/27/2026B00870940-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/27/2026B01191818-S1Open ↗
09/27/2026B01191818-S1Open ↗
09/01/2026B01080275-I1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
03/09/2020321926449Open ↗
02/27/2020321926421Open ↗
03/25/2019321284800Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/27/2026B01191818-S1Open ↗
09/25/2026B01414301-I1Open ↗
09/25/2026B01414301-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
02/27/2020321926421Open ↗
12/11/2015321284800Open ↗
08/29/2012320533810Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
08/10/2012320533810Open ↗
04/12/2012320460345Open ↗
12/17/2008310234840Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/27/2020321926421Open ↗
12/11/2015321284800Open ↗
▸Trade Schedules & Equipment20
▸BISSELF-CERT PLUMBING NOTICE9
08/08/2013310157246Open ↗
08/08/2013310157246Open ↗
07/12/2013310157246Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING6
10/23/2012310157246Open ↗
08/30/2012310157246Open ↗
Showing 2 of 6 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-841
12/13/2012310157246Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/14/2013320314995Open ↗
▸BISWATER METER PERMIT : DEP-METER1
12/19/2012310157246Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
12/13/2012310157246Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
01/22/2013310157246Open ↗
▸Safety & Tenant Protection29
▸DOB NOWHPD-1: Anti-Harassment Area Checklist11
08/13/2026B00384884-I1Open ↗
08/13/2026B00170915-I1Open ↗
08/13/2026B00342650-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWTenant Protection Plan10
08/13/2026B00342650-P1Open ↗
08/13/2026B00225066-I1Open ↗
08/13/2026B00243192-I1Open ↗
Showing 3 of 10 on file for this type
▸BISANTI-HARASSMENT CHECKLIST3
03/09/2020321926449Open ↗
02/27/2020321926421Open ↗
Showing 2 of 3 on file for this type
▸BISTenant Protection Plan and Notes2
03/09/2020321926449Open ↗
02/27/2020321926421Open ↗
▸BISSTREET TREE CHECKLIST2
03/09/2020321926449Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWCertificate of No Harassment1
08/17/2026B01383275-I1Open ↗
▸Environmental & Asbestos28
▸DOB NOWOER: Notice to Proceed10
08/13/2026B00328302-P1Open ↗
08/13/2026B00384884-I1Open ↗
08/13/2026B00243192-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
06/06/2011320314995Open ↗
12/17/2008310234840Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026B01191818-S1Open ↗
08/13/2026B00243192-I1Open ↗
08/13/2026B00384884-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/24/2020321926449Open ↗
02/27/2020321926421Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
06/24/2020321926449Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
02/27/2020321926421Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
10/31/2022321926421Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance6
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/31/2022321926421Open ↗
05/02/2022321926449Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/09/2020321926449Open ↗
12/11/2015321284800Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/29/2022321926449Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00377762-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/04/2022321926449Open ↗
04/29/2022321926449Open ↗
06/29/2020321926449Open ↗
Showing 3 of 5 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/25/2019321284800Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs49
▸BISSCHEDULE A - OCCUPANCY / USE19
03/02/2023321926449Open ↗
12/21/2022321926449Open ↗
12/07/2022321926449Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
08/09/2012320533810Open ↗
04/11/2012320460345Open ↗
06/06/2011320314995Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
11/02/2022321926421Open ↗
09/11/2019302348109Open ↗
03/25/2019321284800Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/16/2022321926449Open ↗
05/12/2022321926449Open ↗
06/13/2013310157246Open ↗
Showing 3 of 6 on file for this type
▸BISThird Party Electrical Signoff Compliance Report2
05/23/2013320460345Open ↗
03/19/2013310234840Open ↗
▸BISACPE Objection Review Request1
07/31/2019310176975Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
12/19/2012310157246Open ↗
▸BISFINAL1
10/31/2022321926421Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01080275-I1Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT10
05/01/2023321926449Open ↗
03/09/2020321926449Open ↗
02/27/2020321926421Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/01/2022321926421Open ↗
04/27/2022321926449Open ↗
▸Filing & Intake Forms30
▸BISADDITIONAL INFORMATION12
06/09/2021321926449Open ↗
05/20/2020321926449Open ↗
09/11/2019302348109Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET11
03/09/2020321926449Open ↗
02/27/2020321926421Open ↗
12/11/2015321284800Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM7
09/10/2021300700604Open ↗
09/11/2019302348109Open ↗
05/07/2019300700542Open ↗
Showing 3 of 7 on file for this type
▸Other Documents9
▸BISPLOT DIAGRAM2
03/09/2020321926449Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWCalculations2
08/16/2026B01414301-I1Open ↗
08/13/2026B01083495-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/16/2026B01414301-I1Open ↗
08/13/2026B01083495-I1Open ↗
▸BISSD/SP FIRE PUMP TEST : FP-861
12/13/2012310157246Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
08/13/2026B00170915-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
08/13/2026B00170915-I1Open ↗