← Back
Church, synagogue, chapel
Salvation and Deliverence Church
37 WEST 116 STREET · Name © OpenStreetMap contributors · Harlem (South) · BIN 1051428
💬 Discuss this project
1920Year Built
5Stories
M1Building Class
C4-5XZoning
29,350 sfGross Floor Area
1Units
LL97 Covered12 Open Violations 9 unresolved · 3 paperwork only ▸
Church, synagogue, chapel · 10,092 sf lot · 2.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentCivilGeneral
Roof1p · 1 filing · 6 docs
Floor 17p · 4 filings · 12 docs
Site & exterior1 filing · 6 docs
Filed — no permit issued26p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GSR CONTRACTOR807/08/2026
TOPLINE NYC CONTRACTING607/08/2026
HPD303/22/2026
SALVATION DELIVERANCE CHURCH103/21/2026
SALVATION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIERRA CONSTRUCTION101/06/2026
ASR ENGINEERING PC207/07/2024
BACKFORTY ARCHITECTURE, LLC101/19/2024
ALBERTO ROMAN106/09/2020
SYED ENGINEERING, P.C.206/01/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SIERRA SAFETY CORP203/21/2026
ADVANCED BUILDERS SERVICES403/21/2026
RIGHT WAY SERVICES NYC203/21/2026
CONAPAC SERVICES DBA103/21/2026
CONAPAC SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor407/08/2026
CARLITOS CONTRACTING CORPGeneral Contractor303/21/2026
DEAN RESTORATION INCGeneral Contractor303/21/2026
RICHARD NEUElectrical203/22/2026
GSR CONTRACTOR INCGeneral Contractor207/08/2026
SERGIO GIANNACHIElectrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
JAMAL DUDLEYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLACK BOX ENGINEERING7196101/19/2024
Building Lifecycle
All (73)Filed (7)Permit Issued (6)Signed Off (5)Violation (46)Objection (2)Special Inspection (7)
07/08/2026
Violation issued (ECB, open)
Construction
01/06/2026
Filed — Alteration
Filling for approval of restoration and reinforcement of structural members.
M01336121-I1
12/18/2025
Special inspection requirement — Masonry
12/18/2025
Special inspection requirement — Structural Steel - Details
12/17/2025
Special inspection requirement — Final
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/06/2025
Violation issued (ECB, open)
Construction
05/30/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01076663-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/09/2024
Permit issued — Sidewalk Shed
M01076663-I1-SH
07/07/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01076663-I1
06/05/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01023450-I1
04/11/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01023450-I1
04/11/2024
Permit issued — Sidewalk Shed
M01023450-I1-SH
03/19/2024
Permit issued — Structural
M00990440-I1-GC-CX
01/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Bueno
01/29/2024
Objection raised — Other
01/29/2024
Objection resolved — Addressed
01/19/2024
Filed — Alteration
Rear wall exterior facade repair consisting of steel lintels replacements at existing window openings. brick tuckpointing, new exterior plaster application, new metal coping covers to be installed over existing stone coping. No change to use egress or occ
M00990440-I1
01/15/2024
Special inspection requirement — Final
Michael Mitchell
08/22/2023
Violation issued (ECB, closed)
Boilers
05/19/2023
Signed off — Alteration
HPD ORDERED EMERGENCY INSTALLATION OF SIDEWALK SHED TO PREVENT DEBRIS FROM FALLING ON PUBLIC. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2013 B.C
M00354731-I1
02/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/18/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/02/2021
Violation issued (ECB, open)
Construction
06/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/21/2021
Violation issued (ECB, open)
Construction
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/26/2021
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00352035-I1
04/26/2021
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
M00348529-I1
04/10/2021
Violation issued (ECB, closed)
Construction
03/30/2021
Violation issued (ECB, open)
Construction
03/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/04/2020
Violation issued (ECB, closed)
Construction
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/10/2020
Permit issued — Sidewalk Shed
M00354731-I1-SH
06/09/2020
Filed — Alteration
HPD ORDERED EMERGENCY INSTALLATION OF SIDEWALK SHED TO PREVENT DEBRIS FROM FALLING ON PUBLIC. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2013 B.C
M00354731-I1
06/02/2020
Permit issued — Supported Scaffold
M00352035-I1-SF
06/01/2020
Filed — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00352035-I1
05/27/2020
Special inspection requirement — Final
RAFI HAMID
05/26/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/22/2020
Permit issued — Sidewalk Shed
M00348529-I1-SH
05/19/2020
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
M00348529-I1
05/12/2020
Special inspection requirement — Final
RAFI HAMID
05/11/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/09/2020
Violation issued (ECB, open)
Construction
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/02/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/07/2012
Violation issued (ECB, open)
Construction
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offGSR CONTRACTOR INC07/09/2024
DOB NOWSidewalk ShedSigned-offGSR CONTRACTOR INC04/11/2024
DOB NOWStructuralSigned-offDEAN RESTORATION INC03/19/2024
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP06/10/2020
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING06/02/2020
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING05/22/2020
BISOTISSUEDBRISCO BUILDERS INC06/23/2020
BISOTISSUEDELITE QUALITY CONSTRUCTIO05/09/2013
BISSPISSUEDG.N.T. MECHANICAL LLC02/01/2002
BISMHISSUEDRETAIL PLANNING AND CONSTR09/21/2001
BISEQISSUEDALL STAFF CONTRACTORS08/20/1990
BISOTISSUEDALL STAFF CONTRACTORS08/20/1990
4 projects · most recent 07/10/2024
FiledStatusContractorScope
07/10/2024Permit IssuedRICHARD NEU—
03/22/2023Permit IssuedDUDLEY & ASSOC. LIC. ELEC1 meters
06/05/2020CompleteRICHARD NEU—
06/01/2020Permit IssuedRICHARD NEU—
2 projects · most recent 01/06/2026
Steel Masonry
FiledStatusContractorScope
01/06/2026——Steel, Masonry
01/19/2024Signed-offDEAN RESTORATION INC1 scope_items
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
12/18/2025Masonry—special
12/18/2025Structural Steel - Details—special
12/17/2025Final—progress
01/31/2024Structural Stability – Alterations of existing buildingsDavid Buenospecial
01/15/2024FinalMichael Mitchellprogress
05/27/2020FinalRAFI HAMIDprogress
05/12/2020FinalRAFI HAMIDprogress
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
08/27/2026M01023450-I1Request digital key ↗
08/27/2026M01076663-I1Request digital key ↗
08/20/2026M01336121-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00348529-I1Request digital key ↗
09/04/2026M00354731-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00352035-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
06/18/2020140915062Open ↗
05/13/2013121611906Open ↗
▸BISWORK PERMIT APPLICATION2
06/23/2020140915062Open ↗
05/10/2013121611906Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026M00990440-I1Open ↗
08/13/2026M00354731-I1Open ↗
08/13/2026M01023450-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026M00990440-I1Open ↗
08/25/2026M00352035-I1Open ↗
08/23/2026M00348529-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/13/2013121611906Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION1
05/13/2013121611906Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/18/2020140915062Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/13/2013121611906Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/18/2020140915062Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/18/2020140915062Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026M00990440-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026M00352035-I1Open ↗
08/13/2026M00348529-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/18/2020140915062Open ↗
05/13/2013121611906Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00990440-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/13/2021140915062Open ↗
06/18/2020140915062Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/13/2021140915062Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/18/2020140915062Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/13/2013121611906Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/13/2021140915062Open ↗
06/18/2020140915062Open ↗
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026M01336121-I1Open ↗
08/13/2026M00348529-I1Open ↗
08/13/2026M00354731-I1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
05/13/2013121611906Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/13/2021140915062Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/13/2021140915062Open ↗
06/18/2020140915062Open ↗
05/13/2013121611906Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
06/18/2020140915062Open ↗
▸BISEFILING COVER SHEET1
05/13/2013121611906Open ↗