← Back
Office with commercial, 7-19 stories
37 WEST 26 STREET
MANHATTAN · BIN 1015634
💬 Discuss this project
1909Year Built
12Stories
O6Building Class
M1-8A/R11Zoning
112,259 sfGross Floor Area
25Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: KIAMIE PRINCESS MARION REALTY CORP · 9,875 sf lot · 11.37 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 98p · 1 filing · 20 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WINDSOR MANAGEMENT2507/08/2026
SYPHON GROUP307/08/2026
KIAMIE PRINCESS REALTY203/22/2026
SOHO CONST CORP203/22/2026
CUT & DRY CONSTRUCTION103/22/2026
OWNER OF PREMISES 37 W 26103/22/2026
KIAME CORP.103/22/2026
OWNER OF 37 WEST 26 ST103/22/2026
MERINGOFF PROPERTIES303/22/2026
IDESCO INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JD DESIGN ASSOCIATES INC308/12/2026
JS ARCHITECTURE DESIGN, PC201/28/2025
ENGINEERING SOLUTIONS211/17/2023
NMI ARCHITECTURE, PLLC212/07/2021
ASIF JAMIL, RA102/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JD ARCH403/21/2026
WALTER T GORMAN PE803/21/2026
NMI ARCHITECTURE PLLC203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JAMES E FITZGERALD INCGeneral Contractor307/08/2026
GREAT STONE GEN'L CONST*General Contractor207/08/2026
LCS RESTORATION CORPGeneral Contractor207/08/2026
LAWRENCE J. LEVINEFire Protection203/21/2026
EPIC ELECTRIC INCElectrical103/22/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
GARY BLANKOPHElectrical103/21/2026
ABCO-PEERLESS SPRKLR CORPFire Protection107/08/2026
AMS CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244208/12/2026
ENGINEERING SOLUTIONS, PL6492211/17/2023
WALTER T. GORMAN, P.E., P268111/14/2023
Building Lifecycle
All (134)Filed (10)Permit Issued (9)Signed Off (4)Facade (FISP) (12)Violation (60)Inspection (7)Objection (2)Special Inspection (30)
08/12/2026
Filed — Alteration
MECHANICAL WORK FOR INSTALL KITCHEN HOOD SYSTEM IN THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01436281-I1
08/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
07/24/2026
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
07/24/2026
Special inspection requirement — Final
Guoyu Liu
04/27/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/15/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/02/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
12/05/2025
Permit issued — General Construction
M01278690-I1-GC-CX
09/25/2025
Permit issued — General Construction
M01278690-I1-GC-CX
09/19/2025
Filed — Alteration
INTERIOR RENOVATION EXISTING STORE WITH PARTITION AND MECHANICAL WORK ON 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01278690-S1
09/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/15/2025
Filed — Alteration
INTERIOR RENOVATION EXISTING STORE WITH PARTITION AND MECHANICAL WORK ON 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01278690-I1
09/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
08/27/2025
Special inspection requirement — Final
Guoyu Liu
08/27/2025
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
07/24/2025
Signed off — Alteration
Proposed interior alteration on 9th floor, all as per plans. No change of egress, occupancy or use.
M00937619-I1
07/23/2025
Signed off — Alteration
Proposed interior alteration on 9th floor, all as per plans. No change of egress, occupancy or use.
M00937619-S2
05/29/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/28/2025
Filed — Alteration
Proposed interior alteration on 9th floor, all as per plans. No change of egress, occupancy or use.
M00937619-P1
01/28/2025
Special inspection requirement — Interior lighting power
John Ryan
01/28/2025
Special inspection requirement — Lighting controls
John Ryan
01/28/2025
Special inspection requirement — Final
John Ryan
01/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Walter Gorman
01/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/09/2025
Special inspection requirement — Final
John Ryan
01/09/2025
Special inspection requirement — Lighting controls
John Ryan
01/09/2025
Special inspection requirement — Interior lighting power
John Ryan
12/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/18/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/17/2024
Violation issued (FDNY_ORDER, closed)
12/17/2024
Violation issued (FDNY_NOV, closed)
10/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/18/2024
Permit issued — General Construction
M00937619-I1-GC
07/15/2024
Permit issued — Plumbing
M00937619-S2-EW-SP
07/15/2024
Permit issued — Mechanical Systems
M00937619-S1-MS
07/12/2024
Permit issued — Sprinklers
M00937619-S2-PL
11/17/2023
Filed — Alteration
Proposed interior alteration on 9th floor, all as per plans. No change of egress, occupancy or use.
M00937619-S1
11/17/2023
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS, SIDEWALK SHED LIVE LOAD WILL BE 300 PSF. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES TO USE, EGRESS AND OCCUPANCY.
M00470192-I1
11/16/2023
Filed — Alteration
Proposed interior alteration on 9th floor, all as per plans. No change of egress, occupancy or use.
M00937619-S2
11/14/2023
Filed — Alteration
Proposed interior alteration on 9th floor, all as per plans. No change of egress, occupancy or use.
M00937619-I1
09/28/2023
Special inspection requirement — Maintenance information
John Ryan
09/28/2023
Special inspection requirement — Maintenance information
John Ryan
09/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
John Ryan
09/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
John Ryan
09/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
John Ryan
09/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Ryan
09/28/2023
Special inspection requirement — Sprinkler Systems
John Ryan
09/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
John Ryan
09/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Ryan
09/28/2023
Special inspection requirement — Heating Systems
John Ryan
09/28/2023
Special inspection requirement — Mechanical Systems
John Ryan
09/28/2023
Special inspection requirement — Final
John Ryan
09/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
John Ryan
09/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
John Ryan
09/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
John Ryan
09/27/2022
Violation issued (ECB, closed)
Construction
09/27/2022
Violation issued (ECB, closed)
Construction
09/15/2022
Cycle 9 facade report signed — SAFE
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGREAT STONE GEN'L CONST*12/05/2025
DOB NOWGeneral ConstructionSigned-offGREAT STONE GEN'L CONST*09/25/2025
DOB NOWGeneral ConstructionSigned-offJAMES E FITZGERALD INC07/18/2024
DOB NOWPlumbingSigned-offABCO-PEERLESS SPRKLR CORP07/15/2024
DOB NOWMechanical SystemsPermit IssuedJAMES E FITZGERALD INC07/15/2024
DOB NOWSprinklersSigned-offPAR PLUMBING CO., INC07/12/2024
DOB NOWSidewalk ShedSigned-offLCS RESTORATION CORP05/26/2022
DOB NOWGeneral ConstructionSigned-offAMS CONSTRUCTION CORP09/17/2021
DOB NOWSidewalk ShedSigned-offLCS RESTORATION CORP02/22/2021
BIS—ISSUEDJZ CONSTRUCTION GROUP INC09/23/2021
BISOTISSUEDGEMINI WATERPROOFING & RE09/08/2021
BISSPISSUEDPHOENIX PLMBG & MECH CORP04/23/2021
BISOTISSUEDSQUAN CONSTRUCTION SERVIC09/23/2016
BISOTISSUEDINTERIOR CONSTRUCTION COR06/22/2016
BISMHISSUEDINTERIOR CONSTRUCTION COR06/21/2016
BISOTISSUEDINTERIOR CONSTRUCTION COR06/20/2016
BISMHISSUEDINTERIOR CONSTRUCTION COR11/10/2015
BISOTISSUEDINTERIOR CONSTRUCTION COR11/10/2015
BISPLISSUEDA PLUS PLUMBING CORP09/01/2015
BISSPISSUEDDENKO MECHANICAL INC09/01/2015
BISOTISSUEDINTERIOR CONSTRUCTION COR08/26/2015
BISMHISSUEDINTERIOR CONSTRUCTION COR08/26/2015
BISPLISSUEDD.C. PLUMBING INC03/06/2014
BISPLISSUEDD.C. PLUMBING INC03/18/2013
BISSPISSUEDANESIS SERVICES CORP01/11/2013
BISBLISSUEDD.C. PLUMBING INC01/09/2013
BISOTISSUEDPS & M HOME IMPROVEMENT L11/02/2012
BISPLISSUEDD.C. PLUMBING INC10/04/2012
BISMHISSUEDJARLATH CONNAUGHTON10/01/2012
BISOTISSUEDJARLATH CONNAUGHTON10/01/2012
BISFPISSUEDNY FIRE LLC09/06/2012
BISOTISSUEDJARLATH CONNAUGHTON08/03/2012
BISOTISSUEDSOHO CONTRACTING CORP02/25/2010
BISPLISSUEDRELIABLE PLBG & HTG CORP10/15/2009
BISEQISSUEDEVEREST SCAFFOLDING INC03/14/2009
BISOTISSUEDSOHO CONTRACTING CORP03/06/2009
BISEQISSUEDVERTICAL SCAFFOLD LLC01/28/2009
BIS—ISSUEDC & I PLUMBING CONSTRUCTION INC12/12/2008
BISEQISSUEDEVEREST SCAFFOLDING INC11/21/2008
BISEQISSUEDVERTICAL SCAFFOLD LLC01/31/2008
+ 19 more permits on file
3 projects · most recent 08/12/2026
Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2026——Ventilation Systems—
09/19/2025Signed-offGREAT STONE GEN'L CONST*Ventilation Systems—
01/28/2025Signed-offJAMES E FITZGERALD INCHeating and Air Conditioning Systems
Heat / Cool
Johnson Controls DSV144C2 144,000 BTU · Vrf Outdoor ×2
ESH024C2 97,900 BTU · Condensing Unit ×1
1 project · most recent 01/28/2025
FiledStatusContractorScope
01/28/2025Signed-offABCO-PEERLESS SPRKLR CORP—
2 projects · most recent 09/19/2025
Water/Sanitary Gas
FiledStatusContractorScope
09/19/2025——Gas, Water/Sanitary
01/28/2025Signed-offPAR PLUMBING CO., INCWater/Sanitary
3 projects · most recent 07/17/2024
General Wiring
FiledStatusContractorScope
07/17/2024CompleteP.E. STONE INCGeneral Wiring
11/17/2023Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
05/02/2023CompleteEPIC ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/27/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/15/2026Fail-Final General Construction Non-Directive 14FailView ↗
05/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
08/07/2026Tenant Protection Plan ComplianceNARESH MAHANGUspecial
07/24/2026Mechanical SystemsNARESH MAHANGUspecial
07/24/2026FinalGuoyu Liuprogress
09/17/2025Tenant Protection Plan Compliance—special
09/15/2025Tenant Protection Plan ComplianceNARESH MAHANGUspecial
08/27/2025FinalGuoyu Liuprogress
08/27/2025Mechanical SystemsNARESH MAHANGUspecial
01/28/2025Interior lighting powerJohn Ryanenergy_progress
01/28/2025Lighting controlsJohn Ryanenergy_progress
01/28/2025FinalJohn Ryanprogress
01/28/2025Tenant Protection Plan ComplianceWalter Gormanspecial
01/09/2025Tenant Protection Plan Compliance—special
01/09/2025FinalJohn Ryanprogress
01/09/2025Lighting controlsJohn Ryanenergy_progress
01/09/2025Interior lighting powerJohn Ryanenergy_progress
09/28/2023Maintenance informationJohn Ryanenergy_progress
09/28/2023Maintenance informationJohn Ryanenergy_progress
09/28/2023HVAC-R and service water heating equipmentJohn Ryanenergy_progress
09/28/2023HVAC-R and service water heating system controlsJohn Ryanenergy_progress
09/28/2023Tenant Protection Plan ComplianceJohn Ryanspecial
09/28/2023Fire-Resistant Penetrations and JointsJohn Ryanspecial
09/28/2023Sprinkler SystemsJohn Ryanspecial
09/28/2023Tenant Protection Plan ComplianceJohn Ryanspecial
09/28/2023Fire-Resistant Penetrations and JointsJohn Ryanspecial
09/28/2023Heating SystemsJohn Ryanspecial
Latest 25 of 33.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Local USA 829OfficeFloor 9
Project M00937619 Alteration · Permit Entire · 11/14/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 509 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
09/03/2026M00582979-I1Request digital key ↗
08/25/2026M00937619-P1Request digital key ↗
08/25/2026M00937619-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026M00639068-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00470192-I1Request digital key ↗
▸Applications & Permits126
▸BISPLAN / WORK APPROVAL APPLICATION82
09/24/2025101444741Open ↗
09/24/2025101344458Open ↗
09/24/2025121420523Open ↗
Showing 3 of 82 on file for this type
▸BISWORK PERMIT APPLICATION30
09/23/2021110351805Open ↗
06/02/2021140997125Open ↗
05/27/2021101444769Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWLPC Approval/Permit7
09/03/2026M00582979-I1Open ↗
08/25/2026M00937619-I1Open ↗
08/13/2026M01278690-S1Open ↗
Showing 3 of 7 on file for this type
▸BISPLACE OF ASSEMBLY3
07/12/2024123375150Open ↗
09/06/2018123375150Open ↗
Showing 2 of 3 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/25/2025102589511Open ↗
▸BISPLAN / WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
06/28/2024110351805Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/28/2024110351805Open ↗
▸Seals & Professional Certifications97
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
07/09/2024123375150Open ↗
09/06/2018123375150Open ↗
03/03/2017122386934Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026M01278690-I1Open ↗
08/31/2026M00639068-I1Open ↗
08/28/2026M00937619-S2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00582979-I1Open ↗
08/25/2026M00937619-I1Open ↗
08/16/2026M01436281-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M01278690-I1Open ↗
09/23/2026M01278690-I1Open ↗
08/28/2026M00937619-S2Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
09/06/2018123375150Open ↗
Showing 1 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/15/2021140997125Open ↗
09/06/2018123375150Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/15/2021140997125Open ↗
▸Trade Schedules & Equipment43
▸BISSCHEDULE B - PLUMBING12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
11/30/2015122386925Open ↗
Showing 1 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
08/24/2016122386925Open ↗
08/24/2016122386925Open ↗
Showing 2 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
02/13/2017122523340Open ↗
12/16/2015122174985Open ↗
08/31/2015121420514Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS4
01/31/2017122386934Open ↗
01/31/2017122386934Open ↗
01/31/2017122386934Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/31/2017122386934Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER SYSTEMS1
05/12/2021121420523Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
03/30/2016122386925Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
12/16/2015122174985Open ↗
▸Safety & Tenant Protection6
▸BISTPP1: TENANT PROTECTION PLAN2
06/02/2021140997125Open ↗
04/26/2021121420523Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
02/05/2025122665598Open ↗
05/21/2021101444769Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
07/01/2024110351805Open ↗
▸Environmental & Asbestos27
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
01/15/2021140997125Open ↗
01/28/2016122665598Open ↗
Showing 2 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/03/2026M00582979-I1Open ↗
08/25/2026M00937619-I1Open ↗
08/16/2026M01436281-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
01/28/2016122665598Open ↗
09/11/2015122386934Open ↗
Showing 2 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
03/05/2025122665598Open ↗
10/25/2024121388266Open ↗
▸BISEMERGENCY LIGHTING - PA1
07/10/2024123375150Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY9
03/05/2025122665598Open ↗
08/29/2022140997125Open ↗
08/29/2022140997125Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
09/11/2015122386934Open ↗
▸Approvals, Objections & Sign-offs77
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST30
03/05/2025122665598Open ↗
10/21/2024121420514Open ↗
09/14/2022140997125Open ↗
Showing 3 of 30 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISLANDMARKS APPROVAL10
01/15/2021140997125Open ↗
09/07/2018123375150Open ↗
Showing 2 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
02/11/2026121354051Open ↗
02/11/2026101444741Open ↗
02/11/2026101344458Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
08/03/2023110351805Open ↗
02/21/2023110351805Open ↗
Showing 2 of 7 on file for this type
▸BISSUPERSEDING LETTER3
09/23/2021110351805Open ↗
05/27/2021101444769Open ↗
04/26/2021121420523Open ↗
▸BISLANDMARKS SIGNOFF2
07/18/2024110351805Open ↗
09/14/2022140997125Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWLandmark Approval2
08/16/2026M01436281-I1Open ↗
08/13/2026M01278690-P1Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT25
08/29/2022140997125Open ↗
01/15/2021140997125Open ↗
05/02/2017122523340Open ↗
Showing 3 of 25 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
10/25/2024121388266Open ↗
10/21/2024121354051Open ↗
10/17/2024121420514Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms48
▸BISADDITIONAL INFORMATION19
01/27/2025122665598Open ↗
01/21/2025122665598Open ↗
07/10/2024123375150Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET18
01/28/2016122665598Open ↗
09/25/2015122523340Open ↗
Showing 2 of 18 on file for this type
▸BISBOROUGH INTAKE FORM10
12/12/2019110351805Open ↗
09/12/2019110351805Open ↗
06/11/2019110351805Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
01/15/2021140997125Open ↗
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDHCR DOCUMENT3
01/14/2026121155873Open ↗
01/14/2026104839383Open ↗
01/13/2026121388266Open ↗
▸BISLOFT BOARD CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLL2604-VIOLATION-MUST-BE-DISMISSED-OR-WAIVED-BY-PROJECT-ADVOCATE1
08/17/2023110351805Open ↗
▸BISUnknown1
05/02/2017122523340Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type