BuildNYC
Office with commercial, 7-19 stories
7 Penn Plaza
370 7TH AVENUE · BIN 1014343
💬 Discuss this project
1921Year Built
17Stories
O6Building Class
M1-6Zoning
332,383 sfGross Floor Area
0Units
LL97 Covered0 Active ViolationsFISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 370 Seventh Avenue Fee Owner · 19,750 sf lot · 16.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSOSVUnder Construction50p · 6 filings · 20 docs
BulkheadRoof terrace elevator signageUnder Construction2p · 2 filings · 20 docs
PenthouseNaya2p · 1 filing · 11 docs
Floor 17HDRUnder Construction20p · 1 filing · 20 docs
Floor 16HDRUnder Construction45p · 2 filings · 20 docs
Floor 15HDRUnder Construction13p · 1 filing · 20 docs
Floor 14HDRUnder Construction12p · 2 filings · 20 docs
Floor 13EstreichUnder Construction19p · 1 filing · 7 docs
Floor 12Residential sprinklers modification27p · 5 filings · 20 docs
Floor 11
Floor 10
Floor 9SOSV12p · 8 filings · 20 docs
Floor 8Marcum Asia, Protax49p · 5 filings · 20 docs
Floor 7Demolition and constructionUnder Construction2p · 2 filings · 5 docs
Floor 6Tenant renovations and sprinkler workUnder Construction20p · 1 filing · 20 docs
Floor 5UG227p · 4 filings · 20 docs
Floor 4Wounded WarriorUnder Construction39p · 2 filings · 20 docs
Floor 3Rental space interior constructionUnder Construction41p · 6 filings · 20 docs
Floor 2Protos & MulliganUnder Construction54p · 4 filings · 20 docs
Floor 1Starbucks, Pop Up Bagels +6Under Construction147p · 30 filings · 20 docs
MezzanineStarbucks, Sweetgreen +2Under Construction69p · 11 filings · 20 docs
CellarPop Up Bagels, Mulligan Security +4Under Construction121p · 20 filings · 20 docs
BasementPop Up Bagels7p · 3 filings · 20 docs
Site & exteriorMulligan Security37p · 23 filings · 20 docs
Filed — no permit issuedThe Feil Organization7p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
370 7th Avenue Associates36303/21/2026
PopUp Bagels1407/08/2026
370 Joint Venture1303/21/2026
370 Seventh Ave Asso603/21/2026
Feil Organization 370 7th Ave503/21/2026
841 853 Broadway Associates303/21/2026
370 Sevent303/21/2026
370 Seventh Ave Fee Owner103/22/2026
Comscore103/22/2026
Feil Organization103/21/2026
488 Madiso103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Universal Management & ContGeneral Contractor3708/26/2026
Five Town Neon Sign CoSign hanger1507/08/2026
Mauceri Sign CoSign hanger607/08/2026
Everest ScaffoldingScaffold507/08/2026
Reem Plumbing & HeatingPlumbing507/31/2026
Brennan OperatingGeneral Contractor507/08/2026
Sean Coakley P & HFire Protection407/08/2026
Sean Coakley P & HPlumbing407/10/2026
New York Construction AssociatesScaffold307/08/2026
Bedrock Plumbing & HeatingPlumbing307/28/2026
Urban IntelligenceScaffold303/21/2026
H&B Construction ServicesGeneral Contractor307/08/2026
Aura PlumbingPlumbing307/08/2026
Paul F. VivianoElectrical303/21/2026
Alchemy DevelopmentGeneral Contractor303/21/2026
Accord Contracting and ManagementGeneral Contractor307/08/2026
Reem Plumbing & HeatingFire Protection308/16/2026
Tishman ConstructionGeneral Contractor207/08/2026
Cooper WorksGeneral Contractor203/21/2026
CuanGeneral Contractor203/21/2026
Moore RichardElectrical203/21/2026
New York Construction AssociatesGeneral Contractor207/08/2026
North Shore Neon Signspecialty_contractor203/21/2026
Nucor ConstructionGeneral Contractor204/09/2026
Full Capacity FireFire Protection207/08/2026
Service Sign Erectors CoSign hanger207/08/2026
Power Tech ElectricElectrical203/21/2026
J. Caiazzo Plumbing & HeatingFire Protection107/08/2026
Metrotech MechanicalPlumbing107/08/2026
P & D MechanicalFire Protection107/08/2026
PSI PartnersFire Protection107/08/2026
Tristate Plumbing ServicesPlumbing107/08/2026
Universal Fire SprinklerFire Protection107/08/2026
Village P & H NYFire Protection107/08/2026
William C. Gerakaris P&HPlumbing107/08/2026
Archer Consultants GroupFire Protection107/28/2026
Accurate ElectricalElectrical103/21/2026
Ecs Electrical Contg ServiceElectrical103/22/2026
Interphase ElectricElectrical103/21/2026
Triboro Electrical Contracting CoElectrical103/21/2026
Karalis JohnElectrical103/21/2026
Maximum ElectricElectrical103/21/2026
Power Tech ElectricElectrical103/22/2026
Vitale EricElectrical103/21/2026
AzarkGeneral Contractor110/09/2026
DGC Capital ContractingGeneral Contractor107/08/2026
Eyecrave ConstrucGeneral Contractor107/08/2026
Pristine Air Conditioningspecialty_contractor107/08/2026
Arsenal ScaffoldScaffold107/08/2026
Spring ScaffoldingScaffold107/08/2026
North Shore Neon Sign CoSign hanger107/08/2026
Accurate MechanicalPlumbing107/08/2026
Accurate MechanicalFire Protection107/08/2026
5 J'S Electl ContsElectrical103/22/2026
Bedrock MechanicalFire Protection107/08/2026
Bluewater Plumbing & HeatingPlumbing107/08/2026
Branch PlumbingPlumbing107/08/2026
Cma Plumbing & HeatingFire Protection107/08/2026
CM PlumbingPlumbing107/08/2026
Flint MechanicalPlumbing107/08/2026
Hydro MechanicalFire Protection107/08/2026
J. Caiazzo Plumbing & HeatingPlumbing107/08/2026
Building Lifecycle
All (60)Inspection (60)
09/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/23/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/28/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/28/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/26/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/23/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/18/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/22/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/26/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/23/2024
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
10/01/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
09/24/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/01/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/29/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/23/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/16/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/27/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/01/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/29/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/01/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/01/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/20/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/20/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/20/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/25/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/19/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/18/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/15/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAzark10/08/2026
DOB NOWGeneral ConstructionPermit IssuedUniversal Management & Cont08/18/2026
DOB NOWStructuralPermit IssuedUniversal Management & Cont08/18/2026
DOB NOWSprinklersPermit IssuedReem Plumbing & Heating08/14/2026
DOB NOWPlumbingSigned-offReem Plumbing & Heating07/30/2026
DOB NOWSprinklersPermit IssuedArcher Consultants Group07/27/2026
DOB NOWPlumbingPermit IssuedBedrock Plumbing & Heating07/27/2026
DOB NOWGeneral ConstructionPermit IssuedUniversal Management & Cont07/15/2026
DOB NOWMechanical SystemsPermit IssuedUniversal Management & Cont07/15/2026
DOB NOWPlumbingPermit IssuedSean Coakley P & H07/09/2026
DOB NOWGeneral ConstructionPermit IssuedUniversal Management & Cont07/08/2026
DOB NOWGeneral ConstructionPermit IssuedTishman Construction07/06/2026
DOB NOWMechanical SystemsPermit IssuedTishman Construction07/06/2026
DOB NOWStructuralPermit IssuedUniversal Management & Cont07/02/2026
DOB NOWSprinklersPermit IssuedReem Plumbing & Heating04/23/2026
DOB NOWPlumbingSigned-offReem Plumbing & Heating04/23/2026
DOB NOWMechanical SystemsPermit IssuedUniversal Management & Cont04/10/2026
DOB NOWGeneral ConstructionPermit IssuedUniversal Management & Cont04/09/2026
DOB NOWMechanical SystemsPermit IssuedUniversal Management & Cont03/24/2026
DOB NOWGeneral ConstructionPermit IssuedUniversal Management & Cont03/24/2026
DOB NOWMechanical SystemsPermit IssuedUniversal Management & Cont03/24/2026
DOB NOWMechanical SystemsPermit IssuedUniversal Management & Cont03/24/2026
DOB NOWGeneral ConstructionPermit IssuedUniversal Management & Cont03/23/2026
DOB NOWMechanical SystemsSigned-offUniversal Management & Cont03/20/2026
DOB NOWSprinklersSigned-offHydro Mechanical03/05/2026
DOB NOWMechanical SystemsPermit IssuedUniversal Management & Cont03/02/2026
DOB NOWSprinklersSigned-offReem Plumbing & Heating02/24/2026
DOB NOWGeneral ConstructionPermit IssuedNucor Construction02/19/2026
DOB NOWPlumbingPermit IssuedReem Plumbing & Heating02/17/2026
DOB NOWSprinklersPermit IssuedCma Plumbing & Heating02/13/2026
DOB NOWGeneral ConstructionSigned-offUniversal Management & Cont02/13/2026
DOB NOWPlumbingSigned-offWilliam C. Gerakaris P&H02/13/2026
DOB NOWMechanical SystemsPermit IssuedNucor Construction02/11/2026
DOB NOWMechanical SystemsPermit IssuedUniversal Management & Cont02/09/2026
DOB NOWSprinklersSigned-offReem Plumbing & Heating01/28/2026
DOB NOWGeneral ConstructionSigned-offUniversal Management & Cont01/27/2026
DOB NOWMechanical SystemsPermit IssuedUniversal Management & Cont01/26/2026
DOB NOWPlumbingPermit IssuedReem Plumbing & Heating01/22/2026
DOB NOWMechanical SystemsSigned-offUniversal Management & Cont11/13/2025
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration10/02/2025
+ 60 more permits on file
8 projects · most recent 10/16/2026
Ventilation Systems Air Conditioning Systems Heating and Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
10/16/2026Permit IssuedTishman ConstructionAir Conditioning Systems, Ventilation Systems—
07/07/2026Permit IssuedUniversal Management & ContVentilation Systems—
06/24/2026Permit IssuedUniversal Management & ContAir Conditioning Systems, Heating and Air Conditioning Systems—
03/30/2026Permit IssuedUniversal Management & ContAir Conditioning Systems, Ventilation Systems—
02/05/2026Permit IssuedNucor ConstructionVentilation Systems—
12/19/2025Permit IssuedUniversal Management & ContVentilation Systems—
04/08/2025Signed-offPristine Air ConditioningHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Climatemaster TCH120AH 4,000 CFM · Wshp ×1
Mars HBH120A3C3ACLS 4,000 CFM · Wshp ×2
Ventilation
Greenheck EHV-550 8,686 CFM · Exhaust Fan ×1
EVH-501-D 10,963 CFM · Exhaust Fan ×1
SP-LP0511-1 75 CFM · Exhaust Fan ×3
SQ-160-BX-QD 2,600 CFM · Exhaust Fan ×1
SQ-90-VG1X-QD 585 CFM · Exhaust Fan ×1
SQ-95-VG6X-QD 785 CFM · Exhaust Fan ×1
SQ-90-VG 585 CFM · Exhaust Fan ×2
SQ-95-VG 785 CFM · Exhaust Fan ×2
Econ-Air EA-A1-G10 2,217 CFM · Exhaust Fan ×2
EASIF13DD-SS 1,100 CFM · Exhaust Fan ×2
EASIF18DD-HE 1,425 CFM · Exhaust Fan ×2
12/16/2020——Associated Ducts and Piping—
10 projects · most recent 10/16/2026
Sprinkler System
FiledStatusContractorScope
10/16/2026Permit IssuedArcher Consultants GroupSprinkler System
07/16/2026——Sprinkler System
07/07/2026Permit IssuedReem Plumbing & Heating—
06/24/2026——2 heads
03/30/2026Permit IssuedReem Plumbing & HeatingSprinkler System
02/05/2026Permit IssuedCma Plumbing & Heating46 heads
12/19/2025Signed-offReem Plumbing & HeatingSprinkler System
04/04/2025Signed-offCMP Piping35 heads
02/09/2022Permit IssuedPSI Partners17 heads
12/16/2020———
11 projects · most recent 10/16/2026
Water/Sanitary
FiledStatusContractorScope
10/16/2026Permit IssuedBedrock Plumbing & HeatingWater/Sanitary
07/07/2026Signed-offReem Plumbing & HeatingWater/Sanitary
06/29/2026Permit IssuedSean Coakley P & HWater/Sanitary
06/24/2026——Water/Sanitary
03/30/2026Signed-offReem Plumbing & HeatingWater/Sanitary
02/05/2026Signed-offWilliam C. Gerakaris P&H—
01/29/2026Signed-offReem Plumbing & HeatingWater/Sanitary
12/19/2025Permit IssuedReem Plumbing & HeatingWater/Sanitary
04/04/2025Signed-offCM PlumbingWater/Sanitary
06/24/2024Signed-offSean Coakley P & HWater/Sanitary
12/16/2020——Water/Sanitary
25 projects · most recent 07/31/2026
General Wiring
FiledStatusContractorScope
07/31/2026Permit IssuedTeam ElectricGeneral Wiring
07/20/2026Permit IssuedPower Tech ElectricGeneral Wiring
05/27/2026Permit IssuedCentennial Elevator IndustriesGeneral Wiring
04/08/2026Permit IssuedPower Tech ElectricGeneral Wiring
12/19/2024CompleteMidland Electrical CoGeneral Wiring
11/14/2024Permit IssuedPower Tech Electric—
10/25/2024Permit IssuedPower Tech ElectricGeneral Wiring
06/03/2024CompleteConde ElectricGeneral Wiring
05/08/2024Permit IssuedNyco ElectricGeneral Wiring
04/02/2024Permit IssuedPower Tech ElectricGeneral Wiring
09/25/2023Permit IssuedCentennial Elevator IndustriesGeneral Wiring
08/30/2023Complete5 J'S Electl Conts—
03/23/2023Permit IssuedOmd Electrical1 meters, 1 new_meters
03/22/2023Permit IssuedTrincity ElectricGeneral Wiring
12/27/2022CompleteC.M. Richey Electrical ContractingGeneral Wiring
3 projects · most recent 10/16/2026
Steel Concrete
FiledStatusContractorScope
10/16/2026Permit IssuedArcher Consultants GroupSteel, Concrete
07/16/2026Permit IssuedUniversal Management & ContSteel, Concrete
06/24/2026Permit IssuedUniversal Management & ContSteel, Concrete
1 project · most recent 09/09/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/09/2025Permit IssuedTribute RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 70
DateTypeResultReport
09/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/26/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/18/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 70.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/08/2026Electrical motors and elevatorsDANIEL COLOMBINIenergy_progress
10/08/2026Energy Code Compliance InspectionsDANIEL COLOMBINIprogress
10/08/2026Fire-Resistant Penetrations and JointsDANIEL COLOMBINIspecial
10/08/2026Shutoff dampersDANIEL COLOMBINIenergy_progress
10/08/2026Mechanical SystemsDANIEL COLOMBINIspecial
10/08/2026HVAC-R and service water heating system controlsDANIEL COLOMBINIenergy_progress
10/08/2026HVAC-R and service water heating equipmentDANIEL COLOMBINIenergy_progress
10/08/2026Maintenance informationDANIEL COLOMBINIenergy_progress
10/08/2026HVAC-R and service water piping design and insulationDANIEL COLOMBINIenergy_progress
10/08/2026FinalDANIEL COLOMBINIprogress
10/08/2026Duct leakage testing, insulation and designDANIEL COLOMBINIenergy_progress
10/01/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
10/01/2026Fire-Resistant Penetrations and JointsDANIEL COLOMBINIspecial
10/01/2026Sprinkler SystemsDANIEL COLOMBINIspecial
10/01/2026Maintenance informationJOHN MCMONAGLEenergy_progress
10/01/2026Lighting controlsJOHN MCMONAGLEenergy_progress
10/01/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
10/01/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
10/01/2026MeteringJOHN MCMONAGLEenergy_progress
10/01/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
10/01/2026FinalGerard Geierprogress
09/24/2026FinalALLEN AZARKIANprogress
09/21/2026Fire-Resistant Penetrations and JointsDANIEL COLOMBINIspecial
09/21/2026Energy Code Compliance InspectionsDANIEL COLOMBINIprogress
09/21/2026Electrical motors and elevatorsDANIEL COLOMBINIenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
EstreichOfficeFloor 13
Project M01390082 Alteration · Permit Entire · 06/29/2026
Wounded WarriorOfficeFloor 4
Project M01379046 Alteration · Permit Entire · 05/28/2026
HDROfficeFloors 14–17
Project M01369536 Alteration · Prof Cert QA Review · 05/21/2026
Pop Up BagelsRetailCellar, Floor 1
Project M01148335 Alteration · Permit Entire · 11/27/2024
Project M01121467 Alteration · Permit Entire · 10/25/2024
Project M01121484 Alteration · Permit Entire · 10/25/2024
Project M01121433 Alteration · Objections · 10/22/2024
Mulligan SecurityOffice—
Project M01129881 Alteration · LOC Issued · 11/07/2024
SweetgreenRestaurant / Food ServiceCellar, Floor 1, Mezzanine
Project M01048176 Alteration · LOC Issued · 05/16/2024
Project M01025771 Alteration · LOC Issued · 05/15/2024
Project M01048189 Alteration · LOC Issued · 05/15/2024
Project M00236683 Alteration · LOC Issued · 10/08/2019
Project M00236692 Alteration · LOC Issued · 10/08/2019
Marcum AsiaOfficeFloor 8
Project M00963718 Alteration · LOC Issued · 04/10/2024
Protos & MulliganOfficeFloors 1, 2
Project M01006860 Alteration · LOC Issued · 03/15/2024
OakberryRestaurant / Food ServiceFloor 1
Project M00843189 Alteration · Permit Entire · 03/13/2023
ProtaxOfficeFloor 8
Project M08041636 Alteration · LOC Issued · 12/22/2022
Project M08055368 Alteration · LOC Issued · 12/21/2022
Project M08041654 Alteration · LOC Issued · 12/20/2022
Project M08041673 Alteration · LOC Issued · 12/20/2022
UG2OfficeFloor 5
Project M00774522 Alteration · LOC Issued · 11/21/2022
Project M00774534 Alteration · LOC Issued · 11/21/2022
Project M00774817 Alteration · LOC Issued · 11/21/2022
Project M00774510 Alteration · LOC Issued · 11/19/2022
SOSVOfficeFloor 9, Roof
Project M00709530 Alteration · LOC Issued · 07/19/2022
Project M00728197 No Work · PAA Approved · 07/18/2022
Project M00709451 Alteration · LOC Issued · 04/25/2022
Project M00721179 Alteration · LOC Issued · 04/22/2022
Project M00709442 Alteration · LOC Issued · 04/21/2022
Project M00709457 Alteration · LOC Issued · 04/21/2022
SmashburgerRestaurant / Food ServiceCellar, Floor 1, Mezzanine
Project M00520970 Alteration · LOC Issued · 05/19/2021
Project M00361841 Alteration · LOC Issued · 01/28/2021
Project M00361851 Alteration · LOC Issued · 01/28/2021
Project M00368033 No Work · PA Certificate of Operation Issued · 01/28/2021
StarbucksRestaurant / Food ServiceFloor 1
Project M00326795 Alteration · LOC Issued · 03/27/2020
Sticky FingersOfficeCellar, Floor 1, Mezzanine
Project M00260438 Alteration · LOC Issued · 01/22/2020
Project M00260314 Alteration · LOC Issued · 11/29/2019
Project M00260377 Alteration · LOC Issued · 11/29/2019
NayaRestaurant / Food ServiceCellar, Floor 1
Project M00267218 Alteration · LOC Issued · 12/19/2019
Project M00250484 Alteration · LOC Issued · 12/18/2019
Project M00277436 Alteration · LOC Issued · 12/18/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3,099 on file (BIS + DOB NOW)
▸Plans & Drawings143
▸DOB NOWPlans/Sketch97
10/08/2026M01465193-I1Request digital key ↗
09/15/2026M01444736-I1Request digital key ↗
09/06/2026M01369536-S4Request digital key ↗
Showing 3 of 97 on file for this type
▸DOB NOWPlans/Sketch - Sign21
09/05/2026M00236683-I1Request digital key ↗
09/05/2026M00236692-I1Request digital key ↗
09/05/2026M00236742-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Plumbing9
09/05/2026M00260377-I1Request digital key ↗
09/04/2026M00250484-I1Request digital key ↗
09/04/2026M00349750-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00267218-I1Request digital key ↗
09/05/2026M00260438-I1Request digital key ↗
09/04/2026M00420771-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
09/05/2026M00260314-I1Request digital key ↗
09/05/2026M00277436-I1Request digital key ↗
09/04/2026M00349752-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
09/02/2026M00728197-P1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits470
▸BISPLAN / WORK APPROVAL APPLICATION273
11/19/2025123830907Open ↗
11/17/2025123830907Open ↗
11/17/2025123830907Open ↗
Showing 3 of 273 on file for this type
▸BISWORK PERMIT APPLICATION197
04/15/2021140936101Open ↗
11/28/2020123830907Open ↗
01/17/2020123864274Open ↗
Showing 3 of 197 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING RESOLUTION DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications1,002
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION366
04/10/2020123830907Open ↗
02/13/2020123547377Open ↗
02/13/2020123547377Open ↗
Showing 3 of 366 on file for this type
▸DOB NOWProgress Inspector Seal & Signature158
10/19/2026M01121467-I1Open ↗
10/19/2026M01121467-I1Open ↗
10/13/2026M01369536-S1Open ↗
Showing 3 of 158 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature143
10/08/2026M01465193-I1Open ↗
10/08/2026M01369536-P1Open ↗
10/08/2026M01369536-P2Open ↗
Showing 3 of 143 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature111
10/19/2026M01121467-I1Open ↗
10/13/2026M01369536-S1Open ↗
10/13/2026M01369536-S1Open ↗
Showing 3 of 111 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST87
06/09/2021123592264Open ↗
04/10/2020123830907Open ↗
12/23/2019123726021Open ↗
Showing 3 of 87 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT69
10/14/2020140960155Open ↗
04/10/2020123830907Open ↗
12/23/2019123726021Open ↗
Showing 3 of 69 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM49
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 49 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY10
10/14/2020140960155Open ↗
08/10/2020140936101Open ↗
Showing 2 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
10/14/2020140960155Open ↗
Showing 1 of 9 on file for this type
▸Trade Schedules & Equipment223
▸BISSELF-CERT PLUMBING NOTICE50
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 50 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISSCHEDULE B - PLUMBING38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISEQUIPMENT USE PERMITS37
11/24/2021123592264Open ↗
10/02/2020123820767Open ↗
Showing 2 of 37 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT30
11/24/2021123592264Open ↗
10/02/2020123820767Open ↗
Showing 2 of 30 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISSPRINKLER INSP REPORT : FP-857
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos288
▸DOB NOWDEP ACP-5: Asbestos Assessment Report129
10/08/2026M01465193-I1Open ↗
10/08/2026M01369536-P1Open ↗
10/08/2026M01369536-S4Open ↗
Showing 3 of 129 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)98
11/30/2020123830907Open ↗
10/14/2020140960155Open ↗
12/23/2019123726021Open ↗
Showing 3 of 98 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'56
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 56 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Energy Compliance184
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS85
04/10/2020123830907Open ↗
02/13/2020123547377Open ↗
12/23/2019123726021Open ↗
Showing 3 of 85 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS36
08/04/2021123726021Open ↗
05/25/2021123686671Open ↗
10/02/2020123820767Open ↗
Showing 3 of 36 on file for this type
▸BISTR8: Energy Code Progress Inspections13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY13
12/14/2021140936101Open ↗
11/11/2021123592264Open ↗
08/13/2021123726021Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS7
10/14/2020140960155Open ↗
08/10/2020140936101Open ↗
Showing 2 of 7 on file for this type
▸BISLIGHTING CONTROLS4
01/06/2026123830907Open ↗
03/14/2022140875453Open ↗
03/14/2022140875453Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER4
01/06/2026123830907Open ↗
03/14/2022140875453Open ↗
03/14/2022140875453Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
01/06/2026123830907Open ↗
03/14/2022140875453Open ↗
12/14/2021140936101Open ↗
Showing 3 of 4 on file for this type
▸BISNYCECC ANALYSIS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
01/06/2026123830907Open ↗
03/14/2022140875453Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports34
▸BISTECHNICAL REPORT: RESPONSIBILITY23
12/14/2021140936101Open ↗
12/14/2021140936101Open ↗
11/11/2021123592264Open ↗
Showing 3 of 23 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
01/06/2026123830907Open ↗
03/14/2022140875453Open ↗
03/14/2022140875453Open ↗
▸BISMECHANICAL SYSTEMS2
01/06/2026123830907Open ↗
Showing 1 of 2 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/06/2026123830907Open ↗
03/14/2022140875453Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
03/14/2022140875453Open ↗
03/14/2022140875453Open ↗
▸Approvals, Objections & Sign-offs191
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST100
01/06/2026123830907Open ↗
03/29/2022140875453Open ↗
02/08/2022122429835Open ↗
Showing 3 of 100 on file for this type
▸BISADMINISTRATIVE OBJECTIONS54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 54 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION19
09/27/2022140936101Open ↗
09/27/2022140936101Open ↗
09/27/2022140936101Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
07/28/2022140936101Open ↗
07/26/2022140936101Open ↗
11/22/2021140936101Open ↗
Showing 3 of 6 on file for this type
▸BISCCD1-Construction Code Determination5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL4
01/06/2026123830907Open ↗
03/14/2022140875453Open ↗
Showing 2 of 4 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership256
▸BISCOST AFFIDAVIT247
08/04/2021123726021Open ↗
05/25/2021123686671Open ↗
10/14/2020140960155Open ↗
Showing 3 of 247 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
01/06/2026123830907Open ↗
03/28/2022140875453Open ↗
02/08/2022122429835Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms245
▸BISEFILING COVER SHEET149
04/10/2020123830907Open ↗
12/23/2019123726021Open ↗
12/10/2019123864274Open ↗
Showing 3 of 149 on file for this type
▸BISADDITIONAL INFORMATION43
11/19/2025123830907Open ↗
03/26/2024140936101Open ↗
09/27/2022140936101Open ↗
Showing 3 of 43 on file for this type
▸BISBOROUGH INTAKE FORM38
05/04/2020100143738Open ↗
05/04/2020100080617Open ↗
05/04/2020100581461Open ↗
Showing 3 of 38 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET15
10/14/2020140960155Open ↗
08/10/2020140936101Open ↗
Showing 2 of 15 on file for this type
▸Other Documents34
▸DOB NOWProof of Historic Building15
09/02/2026M00709442-I1Open ↗
09/02/2026M00709451-I1Open ↗
Showing 2 of 15 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
11/18/2025123830907Open ↗
Showing 1 of 10 on file for this type
▸BISSupporting Document: Fee Exempt3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISMAINTENANCE INFORMATION2
03/14/2022140875453Open ↗
03/14/2022140875453Open ↗
▸DOB NOWAlternate Plan 12
09/02/2026M00728197-P1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type