Four families
370 ADELPHI STREET
BROOKLYN · BIN 3059448
💬 Discuss this project
1930Year Built
3Stories
C3Building Class
R6BZoning
4,565 sfGross Floor Area
4Units
Rent Stabilized61 Open Violations 59 unresolved · 2 paperwork only ▸FDNY Report ↗
Four families · 2,200 sf lot · 2.08 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionGeneral
Roof25p · 3 filings · 20 docs
Penthouse2p · 1 filing · 10 docs
Floor 718p · 1 filing · 16 docs
Floor 619p · 1 filing · 16 docs
Floor 518p · 1 filing · 16 docs
Floor 418p · 1 filing · 16 docs
Floor 342p · 2 filings · 20 docs
Floor 245p · 3 filings · 20 docs
Floor 142p · 3 filings · 20 docs
Cellar56p · 7 filings · 20 docs
Basement3p · 1 filing · 10 docs
Sub-Basement23p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL CONSTRUCTION1007/08/2026
ASG CONSTRUCTION GROUP IN603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/18/2019$2.5M—LORI LAPIN JONES, AS C7 TRUSTEE OF LAWRENCE BEST → Private party$553/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XH&RC PLUMBING AND HEATING INC203/21/2026
MEL CONSULTING SERVICE403/21/2026
QUICK FILING OF NY INC303/21/2026
QUICK FILING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ASG CONSTRUCTION GROUP INGeneral Contractor2007/08/2026
STEEL CONSTRUCTION LLCGeneral Contractor707/08/2026
ORBIT PLBG & HTG INCPlumbing607/08/2026
ORBIT SPRINKLERPlumbing303/22/2026
ORBIT SPRINKLER CORPFire Protection207/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
C.L. ELECTRIC CORPElectrical103/22/2026
CARLOS LOPEZElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRUDIGM ENGINEERING LLCU43041409/17/2026
CROSSCHECK INSPECTION SER544311/29/2022
ENTHINK ENGINEERS LLC6247111/09/2021
Building Lifecycle
All (175)Filed (21)Permit Issued (20)Signed Off (2)Violation (60)Inspection (6)Objection (36)Special Inspection (30)
09/17/2026
Filed — Alteration
Rehabilitation work on the existing 3 story building with basement and cellar as well as a 2 story horizontal addition at the rear.
B00390622-P3
05/01/2026
Violation issued (HPD, open)
A
04/17/2026
Special inspection requirement — Structural Steel - Welding
Naeem Anwar
04/17/2026
Special inspection requirement — Post-installed Anchors
Naeem Anwar
04/17/2026
Special inspection requirement — Concrete - Cast-In-Place
Naeem Anwar
04/17/2026
Special inspection requirement — Final
Naeem Anwar
04/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Naeem Anwar
04/17/2026
Special inspection requirement — Structural Steel - Details
Naeem Anwar
04/17/2026
Special inspection requirement — Structural Cold-Formed Steel
Naeem Anwar
04/17/2026
Special inspection requirement — Masonry
Naeem Anwar
04/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Naeem Anwar
02/25/2026
Violation issued (FDNY_NOV, closed)
02/18/2026
Signed off — Alteration
INSTALLATION OF HVAC SYSTEM AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00354307-I1
02/06/2026
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM AS INDICTED ON THE DRAWINGS
B00389400-I1
11/20/2025
Violation issued (HPD, open)
I
07/17/2025
Objection resolved — Addressed
07/17/2025
Objection resolved — Addressed
07/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/06/2025
Violation issued (HPD, open)
A
06/05/2025
Permit issued — Sprinklers
B00389400-I1-EW-SP
05/15/2025
Objection raised — Mechanical
05/15/2025
Objection raised — Mechanical
05/15/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
04/11/2025
Objection raised — Other
11/29/2024
Violation issued (HPD, open)
I
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
08/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
08/19/2024
Objection resolved — Addressed
08/19/2024
Special inspection requirement — Sprinkler Systems
Naeem Anwar
07/19/2024
Objection resolved — Addressed
07/19/2024
Objection resolved — Addressed
07/19/2024
Objection resolved — Addressed
07/16/2024
Objection raised — Other
07/16/2024
Objection raised — Other
07/16/2024
Objection raised — Other
07/16/2024
Objection raised — Scope
07/16/2024
Objection raised — Structural
07/10/2024
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM AS INDICTED ON THE DRAWINGS
B00389400-P2
07/03/2024
Filed — Alteration
INSTALLATION OF HVAC SYSTEM AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00354307-P1
07/03/2024
Filed — Alteration
PAA being filed for updated floor layouts and field plumbing changes.
B00353525-P2
06/20/2024
Special inspection requirement — Sprinkler Systems
Naeem Anwar
05/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
05/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
05/06/2024
Special inspection requirement — HVAC insulation and sealing
Naeem Anwar
05/06/2024
Special inspection requirement — Maintenance information
Naeem Anwar
05/06/2024
Special inspection requirement — Permanent certificate
Naeem Anwar
05/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
05/06/2024
Special inspection requirement — HVAC and service water heating equipment
Naeem Anwar
05/06/2024
Special inspection requirement — Mechanical Systems
Naeem Anwar
05/06/2024
Special inspection requirement — HVAC and service water heating system controls
Naeem Anwar
05/06/2024
Special inspection requirement — Final
Naeem Anwar
04/08/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, open)
I
08/14/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
07/20/2023
Permit issued — Construction Fence
B00485604-I1-FN
07/18/2023
Violation issued (ECB, closed)
Construction
04/24/2023
Permit issued — Sprinklers
B00389400-I1-EW-SP
03/21/2023
Violation issued (HPD, open)
A
Latest 60 of 175 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP06/05/2025
DOB NOWConstruction FencePermit IssuedASG CONSTRUCTION GROUP IN07/20/2023
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP04/24/2023
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC02/22/2023
DOB NOWSupport of ExcavationPermit IssuedASG CONSTRUCTION GROUP IN09/16/2022
DOB NOWFoundationPermit IssuedASG CONSTRUCTION GROUP IN09/16/2022
DOB NOWSidewalk ShedPermit IssuedSTEEL CONSTRUCTION LLC09/09/2022
DOB NOWConstruction FencePermit IssuedASG CONSTRUCTION GROUP IN07/14/2022
DOB NOWStructuralPermit IssuedASG CONSTRUCTION GROUP IN07/14/2022
DOB NOWFoundationPermit IssuedASG CONSTRUCTION GROUP IN04/06/2022
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC03/24/2022
DOB NOWMechanical SystemsSigned-offASG CONSTRUCTION GROUP IN03/22/2022
DOB NOWSupport of ExcavationPermit IssuedASG CONSTRUCTION GROUP IN03/21/2022
DOB NOWSupported ScaffoldPermit IssuedSTEEL CONSTRUCTION LLC11/27/2021
DOB NOWSidewalk ShedPermit IssuedSTEEL CONSTRUCTION LLC08/26/2021
DOB NOWConstruction FencePermit IssuedASG CONSTRUCTION GROUP IN07/01/2021
DOB NOWStructuralPermit IssuedASG CONSTRUCTION GROUP IN06/29/2021
DOB NOWStructuralPermit IssuedASG CONSTRUCTION GROUP IN06/23/2021
DOB NOWConstruction FencePermit IssuedASG CONSTRUCTION GROUP IN04/05/2021
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR02/17/2021
BISOTISSUEDASG CONSTRUCTION GROUP IN08/27/2025
BISOTISSUEDASG CONSTRUCTION GROUP IN06/03/2025
BISOTISSUEDASG CONSTRUCTION GROUP IN07/02/2024
BISOTISSUEDASG CONSTRUCTION GROUP IN06/30/2023
BISOTISSUEDASG CONSTRUCTION GROUP IN09/13/2022
BISOTISSUEDASG CONSTRUCTION GROUP IN06/16/2022
BISOTISSUEDASG CONSTRUCTION GROUP IN08/13/2021
BISOTRE-ISSUEDASG CONSTRUCTION GROUP IN02/26/2021
2 projects · most recent 07/03/2024
Storm Water/Sanitary Gas
FiledStatusContractorScope
07/03/2024Permit IssuedORBIT PLBG & HTG INCStorm, Water/Sanitary
12/04/2020Permit IssuedJ. CAIAZZO PLBG & HTG CORGas
5 projects · most recent 03/18/2022
General Wiring
FiledStatusContractorScope
03/18/2022Permit IssuedC.L. ELECTRIC CORPGeneral Wiring
11/11/2021CompleteC.L. ELECTRIC CORP4 meters, 4 new_meters
08/26/2021Permit IssuedRICHARD NEU—
08/07/2021CompleteC.L. ELECTRIC CORP5 meters, 5 new_meters
03/22/2021CompleteDENMAR ELECTRIC CORPGeneral Wiring
1 project · most recent 09/17/2026
Steel Concrete Masonry
FiledStatusContractorScope
09/17/2026Permit IssuedASG CONSTRUCTION GROUP INSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/14/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
06/17/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
04/17/2026MasonryNaeem Anwarspecial
04/17/2026FinalNaeem Anwarprogress
04/17/2026Concrete - Cast-In-PlaceNaeem Anwarspecial
04/17/2026Structural Steel - WeldingNaeem Anwarspecial
04/17/2026Structural Steel - High Strength BoltingNaeem Anwarspecial
04/17/2026Structural Steel - DetailsNaeem Anwarspecial
04/17/2026Structural Stability – Alterations of existing buildingsNaeem Anwarspecial
04/17/2026Structural Cold-Formed SteelNaeem Anwarspecial
04/17/2026Post-installed AnchorsNaeem Anwarspecial
08/28/2024Fire-Resistant Penetrations and JointsNaeem Anwarspecial
08/28/2024Energy Code Compliance InspectionsNaeem Anwarprogress
08/19/2024Sprinkler SystemsNaeem Anwarspecial
06/20/2024Sprinkler SystemsNaeem Anwarspecial
05/09/2024Fire-Resistant Penetrations and JointsNaeem Anwarspecial
05/09/2024Energy Code Compliance InspectionsNaeem Anwarprogress
05/06/2024HVAC insulation and sealing Naeem Anwarenergy_progress
05/06/2024HVAC and service water heating equipment Naeem Anwarenergy_progress
05/06/2024FinalNaeem Anwarprogress
05/06/2024Mechanical SystemsNaeem Anwarspecial
05/06/2024Fire-Resistant Penetrations and JointsNaeem Anwarspecial
05/06/2024Permanent certificateNaeem Anwarenergy_progress
05/06/2024HVAC and service water heating system controls Naeem Anwarenergy_progress
05/06/2024Maintenance informationNaeem Anwarenergy_progress
03/13/2023Concrete - Cast-In-PlaceNaeem Anwarspecial
03/13/2023Subgrade InspectionsNaeem Anwarspecial
Latest 25 of 61.
▾Documents — 183 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch - Plumbing4
08/29/2026B00353525-I1Request digital key ↗
08/15/2026B00424680-I1Request digital key ↗
08/15/2026B00353525-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural4
08/28/2026B00390622-P2Request digital key ↗
08/28/2026B00390622-P3Request digital key ↗
08/15/2026B00390622-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/01/2026B00389400-I1Request digital key ↗
08/15/2026B00389400-P1Request digital key ↗
08/15/2026B00389400-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Support of Excavation3
08/27/2026B00475194-I1Request digital key ↗
08/27/2026B00475194-P2Request digital key ↗
08/27/2026B00475194-P1Request digital key ↗
▸DOB NOWPlans/Sketch3
09/01/2026B00485604-I1Request digital key ↗
09/01/2026B00577410-I1Request digital key ↗
08/31/2026B00623634-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Foundation2
08/28/2026B00475137-P1Request digital key ↗
08/28/2026B00475137-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00354307-I1Request digital key ↗
08/15/2026B00354307-P1Request digital key ↗
▸Applications & Permits25
▸DOB NOWLPC Approval/Permit12
08/28/2026B00390622-P3Open ↗
08/13/2026B00390622-P2Open ↗
08/13/2026B00353525-I1Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION9
08/27/2025321997817Open ↗
07/03/2024321997817Open ↗
06/17/2024321997817Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
11/01/2024321997817Open ↗
09/15/2022321997817Open ↗
08/26/2020321997817Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
08/26/2020321997817Open ↗
01/02/2020321997817Open ↗
▸Seals & Professional Certifications83
▸DOB NOWSpecial Inspector Seal & Signature45
09/02/2026B00475137-I1Open ↗
09/02/2026B00475137-I1Open ↗
09/02/2026B00475137-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/02/2026B00424680-I1Open ↗
09/01/2026B00485604-I1Open ↗
09/01/2026B00577410-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026B00475137-I1Open ↗
09/02/2026B00475137-I1Open ↗
09/01/2026B00390622-P2Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/29/2020321997817Open ↗
10/03/2019321997817Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES1
10/24/2022321997817Open ↗
▸BISSTREET TREE CHECKLIST1
10/05/2020321997817Open ↗
▸BISSTREET TREE SIGNOFF1
09/18/2025321997817Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
09/18/2025321997817Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/28/2026B00475137-I1Open ↗
08/27/2026B00475194-I1Open ↗
08/13/2026B00390622-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/05/2020321997817Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/29/2020321997817Open ↗
10/03/2019321997817Open ↗
▸BISLIGHTING IN DWELLING UNITS1
09/18/2025321997817Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/18/2025321997817Open ↗
▸BISLIGHTING CONTROLS1
09/18/2025321997817Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/24/2021321997817Open ↗
▸BISINTERIOR LIGHTING POWER1
09/18/2025321997817Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00354307-I1Open ↗
▸Inspections & Test Reports8
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/18/2025321997817Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/18/2025321997817Open ↗
▸BISPOST-INSTALLED ANCHORS1
09/18/2025321997817Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
09/18/2025321997817Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/24/2021321997817Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
09/18/2025321997817Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/18/2025321997817Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/18/2025321997817Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLANDMARKS APPROVAL1
08/31/2020321997817Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/24/2021321997817Open ↗
▸BISSUPERSEDING LETTER1
09/16/2022321997817Open ↗
▸BISLANDMARKS SIGNOFF1
09/23/2025321997817Open ↗
▸Cost, Insurance & Ownership12
▸BISPROJECT-SPECIFIC GL INSURANCE7
08/27/2025321997817Open ↗
07/03/2024321997817Open ↗
06/30/2023321997817Open ↗
Showing 3 of 7 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
08/27/2025321997817Open ↗
07/03/2024321997817Open ↗
08/16/2021321997817Open ↗
▸BISCOST AFFIDAVIT2
10/05/2020321997817Open ↗
10/03/2019321997817Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION5
10/24/2022321997817Open ↗
10/05/2020321997817Open ↗
10/05/2020321997817Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
10/03/2019321997817Open ↗
▸Other Documents3
▸BISUNDERPINNING (2014)1
09/18/2025321997817Open ↗
▸BISMAINTENANCE INFORMATION1
09/18/2025321997817Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00475194-I1Open ↗