← Back
BuildNYC
Gas or electric utility
370 VANDERVOORT AVENUE
BROOKLYN · BIN 3338243
💬 Discuss this project
0Year Built
—Stories
U2Building Class
M3-1Zoning
0 sfGross Floor Area
0Units
6 Active Violations 4 unresolved · 2 paperwork only 10 old, status unconfirmed ▸FDNY Report ↗
Gas or electric utility · Owner of record: Brooklyn Union Gas Company · 5,137,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNational Grid19p · 1 filing · 16 docs
Floor 1National Grid17p · 7 filings · 14 docs
Filed — no permit issuedNational Grid16p · 1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
National Grid2807/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KM Associates of New York503/21/2026
Construction Permit Services403/21/2026
Barnwell Consultants103/21/2026
K & M Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Matco ServiceGeneral Contractor304/09/2026
Clune Construction CoGeneral Contractor207/08/2026
Cross Check MechanicalPlumbing207/08/2026
Selpan Electric CoElectrical103/21/2026
Bancker ConstructionGeneral Contractor104/09/2026
Par Plumbing CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ola Consulting Engineers1955411/06/2025
Crosscheck Inspection Services544203/26/2024
Obaid Mian849110/11/2019
Building Lifecycle
All (75)Filed (12)Permit Issued (8)Signed Off (6)Violation (16)Inspection (4)Objection (11)Special Inspection (18)
06/03/2026
Objection raised — Cost
04/28/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Open
03/06/2026
Signed off — Alteration
Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.
B01107225-I1
03/05/2026
Signed off — Alteration
Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.
B01107225-S1
12/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Patrick Lynch
11/06/2025
Filed — Alteration
Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.
B01107225-P3
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Patrick Lynch
10/31/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/06/2025
Permit issued — General Construction
B00833407-I1-GC
09/23/2025
Permit issued — Plumbing
B01107225-I1-PL
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
08/14/2025
Objection raised — Admin
08/14/2025
Objection raised — Scope
08/14/2025
Objection raised — Structural
08/14/2025
Objection raised — Structural
08/14/2025
Objection raised — Structural
08/06/2025
Filed — Alteration CO
B01217787-I1
07/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Patrick Lynch
07/09/2025
Special inspection requirement — Mechanical Systems
Patrick Lynch
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Patrick Lynch
07/09/2025
Special inspection requirement — Final
Patrick Lynch
07/09/2025
Special inspection requirement — Shutoff dampers
Patrick Lynch
07/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Patrick Lynch
07/08/2025
Filed — Alteration
Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.
B01107225-P2
06/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Patrick Lynch
06/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Patrick Lynch
06/09/2025
Special inspection requirement — Mechanical Systems
Patrick Lynch
06/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Patrick Lynch
06/09/2025
Special inspection requirement — Final
Patrick Lynch
06/09/2025
Special inspection requirement — Shutoff dampers
Patrick Lynch
03/07/2025
Permit issued — Plumbing
B01107225-I1-PL
02/19/2025
Permit issued — Mechanical Systems
B01107225-S1-MS
12/20/2024
Signed off — Alteration
B00704610-I1
12/11/2024
Filed — Alteration
Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.
B01107225-I1
12/11/2024
Filed — Alteration
Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.
B01107225-S1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/07/2024
Signed off — Alteration
B00704690-I1
05/17/2024
Filed — Alteration
New Emergency Generator for the Meter OPS Building
B00834735-I1
05/17/2024
Filed — Alteration
B00834743-I1
03/26/2024
Filed — Alteration
Concrete pad for M&R and new emergency generator
B00833407-I1
03/22/2024
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
09/11/2023
Signed off — Alteration
INTERIOR BATHROOM RENOVATION METER OPERATIONS BLDG
B00704740-I1
09/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBancker Construction10/06/2025
DOB NOWPlumbingSigned-offCross Check Mechanical09/23/2025
DOB NOWPlumbingSigned-offCross Check Mechanical03/07/2025
DOB NOWMechanical SystemsSigned-offMatco Service02/19/2025
DOB NOWPlumbingSigned-offPar Plumbing Co06/10/2022
DOB NOWGeneral ConstructionSigned-offClune Construction Co04/22/2022
DOB NOWMechanical SystemsSigned-offClune Construction Co04/21/2022
DOB NOWMechanical SystemsSigned-offMatco Service10/16/2019
BISMHISSUEDEmcor Services NY/NJ08/20/2018
BISBLISSUEDCross Check Mechanical05/15/2017
BISPLISSUEDCross Check Mechanical05/15/2017
BISPLISSUEDWexler Plumbing04/05/2016
BISBLISSUEDWexler Plumbing04/05/2016
BISSPISSUEDA & E Mechanical11/28/2008
BISMHISSUEDGodsil Construction11/12/2008
1 project · most recent 05/17/2024
Generators
FiledStatusContractorScope
05/17/2024——Generators
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
11/12/2025Fire-Resistant Penetrations and JointsPatrick Lynchspecial
11/03/2025Fire-Resistant Penetrations and JointsPatrick Lynchspecial
07/09/2025HVAC-R and service water heating system controlsPatrick Lynchenergy_progress
07/09/2025Mechanical SystemsPatrick Lynchspecial
07/09/2025Energy Code Compliance InspectionsPatrick Lynchprogress
07/09/2025FinalPatrick Lynchprogress
07/09/2025Shutoff dampersPatrick Lynchenergy_progress
07/09/2025HVAC-R and service water heating equipmentPatrick Lynchenergy_progress
06/09/2025HVAC-R and service water heating equipmentPatrick Lynchenergy_progress
06/09/2025HVAC-R and service water heating system controlsPatrick Lynchenergy_progress
06/09/2025Mechanical SystemsPatrick Lynchspecial
06/09/2025Energy Code Compliance InspectionsPatrick Lynchprogress
06/09/2025FinalPatrick Lynchprogress
06/09/2025Shutoff dampersPatrick Lynchenergy_progress
03/22/2024Concrete - Cast-In-PlaceEUGENE BIFULCOspecial
02/24/2023Mechanical Systems—special
02/24/2023Final—progress
02/22/2023FinalEUGENE BIFULCOprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
National GridOfficeFloor 1, Roof
Project B01217787 Alteration CO · Plan Examiner Review · 08/06/2025
Project B01107225 Alteration · LOC Issued · 12/11/2024
Project B00834735 Alteration · Approved · 05/17/2024
Project B00834743 Alteration · Approved · 05/17/2024
Project B00833407 Alteration · Permit Entire · 03/26/2024
Project B00704610 Alteration · LOC Issued · 04/21/2022
Project B00704690 Alteration · LOC Issued · 04/20/2022
Project B00704740 Alteration · LOC Issued · 04/20/2022
Project B00209401 Alteration · LOC Issued · 10/11/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
08/29/2026B00704690-I1Request digital key ↗
08/29/2026B00704740-I1Request digital key ↗
08/29/2026B00704610-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00209401-I1Request digital key ↗
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
08/21/2018321760439Open ↗
06/16/2017321160505Open ↗
06/16/2017321160505Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
08/21/2018321760439Open ↗
11/12/2014321160505Open ↗
03/24/2009310212828Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/18/2016321160505Open ↗
▸BISPLAN / WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/28/2008310212828Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/29/2026B00704690-I1Open ↗
08/29/2026B00704740-I1Open ↗
08/29/2026B00704610-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026B01107225-S1Open ↗
09/02/2026B01107225-S1Open ↗
09/02/2026B01107225-S1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
11/16/2018321760439Open ↗
11/08/2018321760439Open ↗
08/21/2018321760439Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01107225-S1Open ↗
09/02/2026B01107225-P2Open ↗
08/27/2026B01107225-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/21/2018321760439Open ↗
11/12/2014321160505Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/21/2018321760439Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/12/2014321160505Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING2
03/24/2009310212828Open ↗
11/05/2008310212828Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/12/2014321160505Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/27/2018321760439Open ↗
▸BISEQUIPMENT USE PERMITS1
11/27/2018321760439Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/12/2014321160505Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/29/2026B00704690-I1Open ↗
08/29/2026B00704740-I1Open ↗
08/29/2026B00704610-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/21/2008310212828Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/12/2014321160505Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
11/16/2018321760439Open ↗
11/08/2018321760439Open ↗
08/21/2018321760439Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
11/16/2018321760439Open ↗
04/04/2018321160505Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00209401-I1Open ↗
08/23/2026B01107225-S1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/16/2018321760439Open ↗
11/08/2018321760439Open ↗
04/04/2018321160505Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/08/2018321760439Open ↗
06/16/2017321160505Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/12/2014321160505Open ↗
10/21/2008310212828Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
11/08/2018321760439Open ↗
08/21/2018321760439Open ↗
04/04/2018321160505Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM3
11/16/2018321760439Open ↗
11/08/2018321760439Open ↗
04/04/2018321160505Open ↗
▸BISEFILING COVER SHEET2
08/21/2018321760439Open ↗
11/12/2014321160505Open ↗
▸BISADDITIONAL INFORMATION1
07/22/2016321160505Open ↗