← Back
Public elementary, junior or senior high
P.S. 5 Ellen Lurie
3703 HARLEM RIVER DRVWY · BIN 1084201
💬 Discuss this project
1992Year Built
4Stories
W1Building Class
C3Zoning
93,233 sfGross Floor Area
1Units
LL97 Covered5 Open Violations 1 unresolved · 4 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 131,750 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 12p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPARTMENT OF EDUCATION903/22/2026
DEPT. OF EDUCATION/PS 05103/22/2026
DOE P.S. 5703/22/2026
DOE P.S. 5 TRANSPORTABLE303/22/2026
DEPT OF EDUCATION PS5 EUE103/22/2026
D.O.E. PS5 ELLEN LURIE 0203/22/2026
D.O.E. PS5 TRANSPORTABLE0203/22/2026
DOE PS05103/22/2026
DEPT OF EDUCATION PS 5 TR203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EME CONSULTING ENGINEERING GROUP301/21/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHRISTOPHER SCHAEFERElectrical203/21/2026
BRAUNSTEIN, HOWARDElectrical103/21/2026
CHAYUT, ALLENElectrical103/21/2026
ELVIN RODRIGUEZElectrical103/21/2026
FLORENTINE ARTISTIC IRONElectrical103/21/2026
GEMINI ELECTRIC CO., INC.Electrical103/22/2026
GUSTILO, AUGUSTOElectrical103/21/2026
HAL OZKURTElectrical103/21/2026
JUAN ASCUASIATIElectrical103/21/2026
LUPINSKI, MAREKElectrical103/21/2026
MAC FHIONNGHAILE & SONSElectrical103/22/2026
M & C IMPACT IRON WORKElectrical103/21/2026
ROETHER, DOUGLASElectrical103/21/2026
ROOPCHAND SINGHElectrical103/21/2026
SCHWERDTFEGER, MARCUSElectrical103/21/2026
ANDRA VOICUElectrical103/21/2026
EVS ELECTRIC CORP 004927General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351301/21/2025
Building Lifecycle
All (90)Filed (3)Violation (60)Special Inspection (27)
03/10/2026
Violation issued (ECB, open)
Construction
03/10/2026
Violation issued (ECB, open)
Construction
03/10/2026
Violation issued (ECB, open)
Construction
03/10/2026
Violation issued (ECB, open)
Construction
01/23/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
01/23/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
01/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
01/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
01/23/2025
Special inspection requirement — Final
Asma Hashmi
01/23/2025
Special inspection requirement — Maintenance information
Asma Hashmi
01/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
01/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
01/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
01/21/2025
Filed — Alteration
UPGRADE ELEVATOR MACHINE ROOM - PROVIDING HEAT PUMP SYSTEMS FOR ELEVATOR MACHINE ROOM # 1 (1P37029)
M00869288-P1
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
01/21/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
01/21/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
01/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
01/21/2025
Special inspection requirement — Final
Asma Hashmi
01/21/2025
Special inspection requirement — Maintenance information
Asma Hashmi
01/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
01/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
01/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
02/09/2024
Violation issued (ECB, closed)
Construction
05/31/2023
Filed — Alteration
UPGRADE ELEVATOR MACHINE ROOM - PROVIDING HEAT PUMP SYSTEMS FOR ELEVATOR MACHINE ROOM # 1 (1P37029)
M00869288-I1
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/2022
Filed — Alteration
M00764305-I1
06/24/2022
Special inspection requirement — Mechanical Systems
Asma Hashmi
06/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
06/24/2022
Special inspection requirement — Post-installed Anchors
Asma Hashmi
06/24/2022
Special inspection requirement — Final
Asma Hashmi
06/24/2022
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
06/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
06/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
06/24/2022
Special inspection requirement — Maintenance information
Asma Hashmi
06/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
07/01/2021
Violation issued (ECB, closed)
Construction
06/28/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/16/2021
Violation issued (ECB, closed)
Elevators
04/16/2021
Violation issued (ECB, closed)
Elevators
09/01/2020
Violation issued (ECB, closed)
Elevators
05/14/2020
Violation issued (ECB, closed)
Construction
05/14/2020
Violation issued (ECB, closed)
Construction
05/14/2020
Violation issued (ECB, closed)
Construction
05/14/2020
Violation issued (ECB, closed)
Construction
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/12/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/12/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/06/2018
Violation issued (ECB, closed)
Construction
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/21/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/21/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/24/2017
Violation issued (ECB, closed)
Construction
05/24/2017
Violation issued (ECB, closed)
Construction
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDINDEPENDENT TEMPERATURE02/13/2026
BISPLISSUEDVARSITY PLBG AND HTG INC01/07/2021
BISPLISSUEDVARSITY PLBG AND HTG INC02/05/2020
BISPLISSUEDVARSITY PLBG AND HTG INC01/16/2020
BISOTISSUEDKEL-TECH CONSTRUCTION INC04/01/2019
BISOTISSUEDKEL-TECH CONSTRUCTION INC04/01/2019
BISPLISSUEDVARSITY PLBG AND HTG INC03/01/2019
BISPLISSUEDVARSITY PLBG AND HTG INC01/11/2019
BISOTISSUEDKEL-TECH CONSTRUCTION INC04/06/2018
BISOTISSUEDKEL-TECH CONSTRUCTION INC04/06/2018
BISOTISSUEDKEL-TECH CONSTRUCTION INC04/06/2018
BISPLISSUEDVARSITY PLBG AND HTG INC03/29/2018
BISOTISSUEDKEL-TECH CONSTRUCTION INC03/28/2018
BISOTISSUEDKEL-TECH CONSTRUCTION INC03/28/2018
BISOTISSUEDKEL-TECH CONSTRUCTION INC03/28/2018
BISEQISSUEDKEL-TECH CONSTRUCTION INC03/26/2018
BISEQISSUEDKEL-TECH CONSTRUCTION INC03/26/2018
BISEQISSUEDKEL-TECH CONSTRUCTION INC03/26/2018
BISOTISSUEDKEL-TECH CONSTRUCTION INC01/30/2018
BISPLISSUEDVARSITY PLBG AND HTG INC01/29/2018
BISEQISSUEDKEL-TECH CONSTRUCTION INC11/13/2017
BISPLISSUEDVARSITY PLBG AND HTG INC04/04/2017
BISEQRE-ISSUEDKEL-TECH CONSTRUCTION INC03/29/2017
BISOTISSUEDKEL-TECH CONSTRUCTION INC03/29/2017
BISOTISSUEDKEL-TECH CONSTRUCTION INC03/29/2017
BISEQISSUEDKEL-TECH CONSTRUCTION INC03/29/2017
BISEQISSUEDKEL-TECH CONSTRUCTION INC03/29/2017
BISOTRE-ISSUEDKEL-TECH CONSTRUCTION INC04/22/2016
BISPLISSUEDVARSITY PLBG AND HTG INC04/22/2016
BISOTRE-ISSUEDKEL-TECH CONSTRUCTION INC04/22/2016
BISEQRE-ISSUEDKEL-TECH CONSTRUCTION INC04/22/2016
BISEQISSUEDKEL-TECH CONSTRUCTION INC03/25/2016
BISEQISSUEDKEL-TECH CONSTRUCTION INC03/25/2016
BISOTISSUEDA.S.C CONTRACTING CORP07/15/2015
BISPLISSUEDVARSITY PLBG AND HTG INC07/15/2015
BISEQISSUEDA.S.C CONTRACTING CORP07/06/2015
BISPLISSUEDVARSITY PLBG AND HTG INC08/06/2014
BISPLISSUEDVARSITY PLBG AND HTG INC08/06/2014
BISOTISSUEDINDEPENDENT TEMPERATURE04/03/2014
BISEQISSUEDIMPERIUM CONSTRUCTION INC.12/27/2013
+ 10 more permits on file
1 project · most recent 01/21/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/21/2025——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MITSUBISHI PKFY-P18NLMU-E 36,000 BTU · Vrf Indoor ×2
MITSUBISHI PUMY-HP36NKMU1 30,000 BTU · Vrf Outdoor ×1
17 projects · most recent 07/21/2026
General Wiring Lighting
FiledStatusContractorScope
07/21/2026CompleteGEMINI ELECTRIC CO., INC.—
05/11/2026CompleteGEMINI ELECTRIC CO., INC.—
09/14/2025Permit IssuedASCUATECH ELECTRICAL CORPLighting
07/24/2025CompleteSTEEL CITY ELECTRICAL CONGeneral Wiring
05/09/2025CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
03/10/2025CompleteANCO ELECTL CONTCTNG INC—
08/16/2023CompleteEVS ELECTRIC CORPGeneral Wiring
09/20/2022Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
08/03/2022Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
05/05/2022CompletePACIFIC ELEC'L CONTR'G IN—
01/25/2022Permit IssuedA & S ELECTRIC INC.General Wiring
10/12/2021Permit IssuedTITAN ELEC'L & ELEV CONTR—
10/01/2021CompleteABM ELECTRIC, INCGeneral Wiring
09/17/2020CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
02/05/2020Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
01/23/2025Mechanical SystemsAsma Hashmispecial
01/23/2025Post-installed AnchorsAsma Hashmispecial
01/23/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
01/23/2025Energy Code Compliance InspectionsAsma Hashmiprogress
01/23/2025FinalAsma Hashmiprogress
01/23/2025Maintenance informationAsma Hashmienergy_progress
01/23/2025HVAC-R and service water heating equipmentAsma Hashmienergy_progress
01/23/2025HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
01/23/2025HVAC-R and service water heating system controlsAsma Hashmienergy_progress
01/21/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
01/21/2025Mechanical SystemsAsma Hashmispecial
01/21/2025Post-installed AnchorsAsma Hashmispecial
01/21/2025Energy Code Compliance InspectionsAsma Hashmiprogress
01/21/2025FinalAsma Hashmiprogress
01/21/2025Maintenance informationAsma Hashmienergy_progress
01/21/2025HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
01/21/2025HVAC-R and service water heating system controlsAsma Hashmienergy_progress
01/21/2025HVAC-R and service water heating equipmentAsma Hashmienergy_progress
06/24/2022Mechanical SystemsAsma Hashmispecial
06/24/2022Fire-Resistant Penetrations and JointsAsma Hashmispecial
06/24/2022Post-installed AnchorsAsma Hashmispecial
06/24/2022FinalAsma Hashmiprogress
06/24/2022Energy Code Compliance InspectionsAsma Hashmiprogress
06/24/2022HVAC-R and service water heating equipmentAsma Hashmienergy_progress
06/24/2022HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
Latest 25 of 27.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/02/2026M00764305-I1Request digital key ↗
08/31/2026M00869288-P1Request digital key ↗
08/31/2026M00869288-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/08/2009120059239Open ↗
▸BISWORK PERMIT APPLICATION1
06/29/2009120059239Open ↗
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature18
08/25/2026M00764305-I1Open ↗
08/25/2026M00764305-I1Open ↗
08/25/2026M00764305-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/25/2026M00764305-I1Open ↗
08/25/2026M00764305-I1Open ↗
08/25/2026M00764305-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/02/2026M00764305-I1Open ↗
08/31/2026M00869288-I1Open ↗
08/13/2026M00869288-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/08/2009120059239Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/31/2026M00869288-I1Open ↗
08/13/2026M00869288-P1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/08/2009120059239Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
09/02/2026M00764305-I1Open ↗
08/31/2026M00869288-I1Open ↗
08/13/2026M00869288-P1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/31/2026M00869288-I1Open ↗
08/13/2026M00869288-P1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/08/2009120059239Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/08/2009120059239Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/08/2009120059239Open ↗