← Back
BuildNYC
Over six families without stores
371 ETNA STREET
BROOKLYN · Cypress Hills · BIN 3256588
💬 Discuss this project
1927Year Built
4Stories
C1Building Class
R5Zoning
42,400 sfGross Floor Area
56Units
LL97 CoveredRent Stabilized30 Active Violations 2 likely answered 1 old, status unconfirmed ▸FDNY Report ↗
Over six families without stores · Owner of record: Etna Realty Holdings 371-384 · 13,502 sf lot · 3.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoof top wall brace installation4p · 2 filings · 11 docs
CellarCellar framing and joist replacement1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
591 Montauk Highway703/21/2026
Etna Realty Holdings 371-384603/22/2026
Wellstone Group507/08/2026
Etna Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Alnour Consulting105/16/2025
The MTM Design Group208/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cel Tech Electricspecialty_contractor303/21/2026
Ronald Testa, JRElectrical103/21/2026
Cross State ConstructionGeneral Contractor103/21/2026
N & J Home ImprovemntGeneral Contractor107/08/2026
Cel Tech Electricspecialty_contractor107/08/2026
F & T MechanicalPlumbing110/02/2014
Kings Plaza P & HPlumbing208/20/2015
Quanta Wireless SolutionsGeneral Contractor111/02/2012
Squan Construction ServicesGeneral Contractor310/21/2015
Telcom Engineering GPGeneral Contractor109/27/2011
Telcom Engineering GPGeneral Contractor309/14/2015
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alnour Consulting Engineering607105/16/2025
The MTM Design Group1319208/18/2023
Building Lifecycle
07/18/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · closed
07/18/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT C5, 3rd STORY, 1st APARTMENT FROM NORTH…
HPD violation · open
07/18/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT C5, 3rd…
HPD violation · open
07/18/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT C5, 3rd STORY, 1st APARTMENT FROM…
HPD violation · open
07/18/2026
§ 27-2005, 27-2007, 27-2041.1 hmc, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or…
HPD violation · closed
228 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offN & J Home Improvemnt07/11/2025
DOB NOWGeneral ConstructionSigned-offCel Tech Electric09/27/2023
DOB NOWAntennaSigned-offCel Tech Electric09/27/2023
BISOTISSUEDSquan Construction Services10/21/2015
BISOTISSUEDTelcom Engineering GP09/14/2015
BISPLISSUEDKings Plaza P & H08/20/2015
BISOTISSUEDSquan Construction Services05/21/2015
BISPLISSUEDAura Plumbing10/02/2014
BISOTISSUEDTelcom Engineering GP08/26/2014
BISMHISSUEDTelcom Engineering GP08/26/2014
BISBLISSUEDS.J. Fuel09/26/2013
BISPLISSUEDKings Plaza P & H09/26/2013
BISOTRE-ISSUEDQuanta Wireless Solutions11/02/2012
BISOTISSUEDSquan Construction Services09/04/2012
BISOTISSUEDTelcom Engineering GP09/27/2011
BISFBISSUEDAtech Heating & Cooling04/16/2004
BISOTISSUEDCross State Construction03/02/2004
BISBLISSUEDGolden Touch Construction04/14/1994
2 projects · most recent 10/30/2025
General Wiring
FiledStatusContractorScope
10/30/2025Permit IssuedL J Electrical ServiceGeneral Wiring
10/28/2025Permit IssuedL J Electrical Service—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/09/2025Structural Stability – Alterations of existing buildingsNouredine Benabdelhakspecial
04/09/2025FinalNouredine Benabdelhakprogress
04/09/2025Tenant Protection Plan ComplianceNouredine Benabdelhakspecial
08/16/2023Air barrier - visual inspectionRobert Tomsenergy_progress
03/30/2023Fire-Resistant Penetrations and JointsRobert Tomsspecial
03/30/2023FinalRobert Tomsprogress
03/30/2023Tenant Protection Plan ComplianceRobert Tomsspecial
03/30/2023Post-installed AnchorsRobert Tomsspecial
143 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account