← Back
Condo, cultural / medical / educational
University Plaza Condominium
371 FLATBUSH AVENUE EXT · BIN 3338887
💬 Discuss this project
1929Year Built
11Stories
RABuilding Class
C6-4Zoning
228,507 sfGross Floor Area
2Units
LL97 Covered16 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, cultural / medical / educational · Owner of record: UNAVAILABLE OWNER · 43,080 sf lot · 5.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionGeneral
Roof2p · 2 filings · 20 docs
Floor 72p · 1 filing · 12 docs
Floor 64p · 2 filings · 15 docs
Floor 53p · 1 filing · 12 docs
Floor 44p · 2 filings · 18 docs
Floor 33p · 2 filings · 15 docs
Floor 24p · 2 filings · 20 docs
Floor 13p · 3 filings · 20 docs
Cellar7p · 5 filings · 20 docs
1 job · most recent 07/28/2025
Sprinkler System
FiledStatusContractorScope
07/28/2025Signed-offMEJ PLUMBING LLCSprinkler System
1 job · most recent 07/28/2025
Water/Sanitary
FiledStatusContractorScope
07/28/2025Signed-offMEJ PLUMBING LLCWater/Sanitary
6 jobs · most recent 02/28/2024
General Wiring
FiledStatusContractorScope
02/28/2024CompleteSTAR ELEC'L CONTRACTORS C—
03/22/2023CompleteELPO ELECTRICAL CONTG INC—
01/19/2023Permit IssuedNOVA ELECTRIC LLC—
10/04/2022CompleteNOVA ELECTRIC LLCGeneral Wiring
07/28/2022Permit IssuedHIG ELECTRIC ASSC NYC INC—
07/22/2019CompleteILLUMINOUS ELECTRIC CORP.—
4 jobs · most recent 06/29/2023
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
06/29/2023Permit IssuedAP. TEK RESTORATION INCScaffold
09/08/2022——Fence
12/20/2021Permit IssuedZ AND R CONTRACTING INCFence
06/03/2021Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
Building Lifecycle
All (287)Filed (54)Permit Issued (42)Signed Off (21)Facade (FISP) (15)Violation (60)Inspection (14)Objection (51)Special Inspection (30)
03/26/2026
Signed off — Alteration
PLUMBING AND SPRINKLER SCOPE FILED IN ASSOCIATION WITH INTERIOR RENOVATION.
B01250523-I1
03/04/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/15/2026
Signed off — Alteration
B01139630-I1
01/08/2026
Filed — Alteration
REPLACE EXISTING 10 TON SCAV UNIT CONNECTIONG TO EXISTING DUCT WORK, CONDENSATE PIPING, POWER AND CONTROLS
B01339516-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/29/2025
Permit issued — Sprinklers
B01250523-S1-EW-SP
10/29/2025
Permit issued — Plumbing
B01250523-S1-PL
10/23/2025
Permit issued — General Construction
B01250523-I1-GC
10/06/2025
Signed off — Alteration
B01119432-I1
10/06/2025
Permit issued — Suspended Scaffold
B01119432-I1-SC
07/28/2025
Filed — Alteration
PLUMBING AND SPRINKLER SCOPE FILED IN ASSOCIATION WITH INTERIOR RENOVATION.
B01250523-I1
07/28/2025
Filed — Alteration
PLUMBING AND SPRINKLER SCOPE FILED IN ASSOCIATION WITH INTERIOR RENOVATION.
B01250523-S1
07/02/2025
Special inspection requirement — Sprinkler Systems
RONALD GRAPIN
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
04/16/2025
Violation issued (FDNY_ORDER, closed)
04/16/2025
Violation issued (FDNY_ORDER, closed)
01/07/2025
Permit issued — General Construction
B01139630-I1-GC
11/19/2024
Permit issued — General Construction
B01139630-I1-GC
11/12/2024
Filed — Alteration
B01139630-I1
10/09/2024
Permit issued — Suspended Scaffold
B01119432-I1-SC
09/30/2024
Filed — Alteration
B01119432-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/26/2024
Signed off — Alteration
removal of abandoned boiler. no change in use or egress. Existing Oil Tank will be abandoned, The Abandoned process will be filed under different application by Plumber.
B08044860-I1
06/25/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/11/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY AUDITORIUM SCAFFOLD PLATFORM SYSTEM AS PER PLANS IN CONJUNCTION WITH STRUCTURAL WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
B08020813-I1
06/11/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
B00961964-I1
05/30/2024
Signed off — Alteration
Provide gas to new boiler. NO change in use or egrees.
B08044382-S2
05/17/2024
Signed off — Alteration
INSTALL TWO (2) REPLACEMENT SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01036646-I1
05/07/2024
Permit issued — General Construction
B01036646-I1-GC
05/07/2024
Permit issued — Mechanical Systems
B01036646-I1-MS
05/06/2024
Filed — Alteration
INSTALL TWO (2) REPLACEMENT SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01036646-I1
05/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/29/2024
Signed off — Alteration
SPRINKLER/ STANDPIPE WORK AS PER PLANS FILED HEREWITH.
B00786666-I1
04/22/2024
Violation issued (FDNY_ORDER, closed)
04/22/2024
Violation issued (FDNY_ORDER, closed)
04/17/2024
Signed off — Alteration
Provide gas to new boiler. NO change in use or egrees.
B08044382-S1
04/16/2024
Special inspection requirement — Mechanical Systems
Joseph Bazini
04/16/2024
Special inspection requirement — Final
Joseph Bazini
04/04/2024
Signed off — Alteration
Provide gas to new boiler. NO change in use or egrees.
B08044382-I1
04/03/2024
Filed — No Work
B01029954-I1
04/02/2024
Objection resolved — Addressed
03/29/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08000130-I1
03/29/2024
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDIG AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00688778-I1
03/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY WORK PLATFORMS @ MULTIPLE LEVELS AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORMS TO COMPLY WITH CHAPTER 33 OF NYC BUIDLING CODE.
B00856332-I1
03/25/2024
Violation issued (FDNY_ORDER, closed)
03/21/2024
Signed off — Alteration
Filing to reflect the removal of the 7th floor scope.
B00776871-I1
03/21/2024
Objection resolved — Addressed
03/20/2024
Special inspection requirement — Standpipe Systems
Christopher O'Malley
03/20/2024
Special inspection requirement — Sprinkler Systems
Christopher O'Malley
03/18/2024
Filed — No Work
B01020358-I1
03/18/2024
Objection resolved — Addressed
03/18/2024
Objection resolved — Addressed
03/18/2024
Objection resolved — Addressed
Latest 60 of 287 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY2107/08/2026
ROCK GROUP NY1107/08/2026
AP. TEK RESTORATION INC503/22/2026
Z AND R CNTRACTING INC.503/22/2026
POFI CONSTRUCTION103/22/2026
SCHIMENTI CONSTRUCTION CO103/22/2026
WAYNE HAMILTON RM 101103/22/2026
METRO CONTRACTING NY303/21/2026
NANYANG REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PLATINUM SERVICES NY1403/21/2026
EUROCELT EXPEDITING, INC1603/21/2026
GREEN STUDIO403/21/2026
JAM CONSULTANTS, INC.2403/21/2026
AE DESIGN SOLUTION403/21/2026
A1 EXPEDITING SERVICE CORP.103/21/2026
SKY MANAGEMENT GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATFORM SOLUTIONS, INCGeneral Contractor1207/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor1007/08/2026
Z AND R CONTRACTING INCGeneral Contractor603/21/2026
BUILDING MAINTENANCE CORP.General Contractor507/08/2026
ROCK GROUP NY CORPGeneral Contractor507/08/2026
MEJ PLUMBING LLCPlumbing507/08/2026
NYC FIRE SPRINKLER CORPFire Protection407/08/2026
BASE CONCEPT HVAC & GENERALGeneral Contractor407/08/2026
PHOENIX SUTTON STR INCGeneral Contractor307/08/2026
EBRO DIQUE GROUP, LLCGeneral Contractor303/21/2026
JUST PLBG & HTG INCPlumbing307/08/2026
ROSENWACH TANK CO. LLCGeneral Contractor204/09/2026
AP. TEK RESTORATION INCGeneral Contractor203/21/2026
STATEWIDE DEMOLITION CORP.General Contractor203/21/2026
JOSEPH BRAMANElectrical203/21/2026
CANNIZZARO, ANTHONYFire Protection103/21/2026
MICHAEL OLIVOElectrical103/21/2026
ARTUR KALAJGeneral Contractor104/09/2026
MEJ PLUMBINGPlumbing103/22/2026
ARTUR KALAJGeneral Contractor103/21/2026
MEJ PLUMBING LLCFire Protection107/08/2026
SCHIMENTI CONSTRUCTION COGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STERLING ENGINEERING SERV1012101/08/2026
ATLAS ATC ENGINEERING INC8011607/28/2025
BAZINI ENGINEERING, P.C.1808105/06/2024
KCE CONSULTING ENGINEERIN3712303/06/2024
PL ENGINEERING PC2594410/12/2023
ATLANTIC ENGINEERINGLABOR1381110/31/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offMEJ PLUMBING LLC10/29/2025
DOB NOWPlumbingSigned-offKAY PLUMBING INC10/29/2025
DOB NOWGeneral ConstructionSigned-offARTUR KALAJ10/23/2025
DOB NOWSuspended ScaffoldSigned-offROSENWACH TANK CO.,LLC10/06/2025
DOB NOWGeneral ConstructionSigned-offROSENWACH TANK CO. LLC01/07/2025
DOB NOWGeneral ConstructionSigned-offROSENWACH TANK CO. LLC11/19/2024
DOB NOWSuspended ScaffoldSigned-offROSENWACH TANK CO.,LLC10/09/2024
DOB NOWGeneral ConstructionSigned-offBUILDING MAINTENANCE CORP.05/07/2024
DOB NOWMechanical SystemsSigned-offBUILDING MAINTENANCE CORP.05/07/2024
DOB NOWBoiler EquipmentSigned-offMOHAMED ABDELRAZEK01/25/2024
DOB NOWSprinklersSigned-offNYC FIRE SPRINKLER CORP12/06/2023
DOB NOWStandpipeSigned-offNYC FIRE SPRINKLER CORP12/06/2023
DOB NOWStructuralSigned-offBASE CONCEPT HVAC & GENER11/27/2023
DOB NOWSupported ScaffoldSigned-offPLATFORM SOLUTIONS, INC11/14/2023
DOB NOWMechanical SystemsSigned-offBUILDING MAINTENANCE CORP.11/02/2023
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK11/02/2023
DOB NOWSupported ScaffoldSigned-offPLATFORM SOLUTIONS, INC10/12/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/07/2023
DOB NOWSupported ScaffoldPermit IssuedAP. TEK RESTORATION INC06/29/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedEBRO DIQUE GROUP, LLC04/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC04/06/2023
DOB NOWBoiler EquipmentSigned-offMOHAMED ABDELRAZEK03/28/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/22/2023
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC03/22/2023
DOB NOWGeneral ConstructionSigned-offSTATEWIDE DEMOLITION CORP.03/08/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC02/22/2023
DOB NOWGeneral ConstructionSigned-offBASE CONCEPT HVAC & GENER02/22/2023
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC02/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC01/13/2023
DOB NOWFoundationSigned-offSCHIMENTI CONSTRUCTION CO01/04/2023
DOB NOWSprinklersSigned-offNYC FIRE SPRINKLER CORP12/03/2022
DOB NOWStandpipeSigned-offNYC FIRE SPRINKLER CORP12/03/2022
DOB NOWSupported ScaffoldSigned-offPLATFORM SOLUTIONS, INC10/15/2022
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC09/22/2022
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/09/2022
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC03/03/2022
DOB NOWConstruction FencePermit IssuedZ AND R CONTRACTING INC12/21/2021
DOB NOWGeneral ConstructionSigned-offZ AND R CONTRACTING INC12/09/2021
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC09/29/2021
DOB NOWSidewalk ShedPermit IssuedROCK GROUP NY CORP09/30/2020
+ 47 more permits on file
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
03/04/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/25/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/15/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/06/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
07/02/2025Sprinkler SystemsRONALD GRAPINspecial
07/02/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
05/06/2024HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
04/16/2024Mechanical SystemsJoseph Bazinispecial
04/16/2024FinalJoseph Baziniprogress
03/20/2024Standpipe SystemsChristopher O'Malleyspecial
03/20/2024Sprinkler SystemsChristopher O'Malleyspecial
03/01/2024Sprinkler SystemsGIORGI KHARDZEISHVILIspecial
03/01/2024Standpipe SystemsGIORGI KHARDZEISHVILIspecial
02/27/2024Structural Steel - WeldingKemba Walcottspecial
02/27/2024Structural Steel - High Strength BoltingKemba Walcottspecial
02/27/2024Structural Steel - DetailsKemba Walcottspecial
02/27/2024FinalKemba Walcottprogress
02/27/2024Structural Stability – Alterations of existing buildingsKemba Walcottspecial
02/27/2024Structural Cold-Formed SteelKemba Walcottspecial
02/27/2024Post-installed AnchorsKemba Walcottspecial
02/27/2024Concrete - Cast-In-PlaceKemba Walcottspecial
08/18/2023Heating SystemsPABLO LEONspecial
08/03/2023Heating SystemsPABLO LEONspecial
07/18/2023Public Assembly Emergency LightingDavid Asfourprogress
07/18/2023Public Assembly Emergency LightingDavid Asfourprogress
07/18/2023Public Assembly Emergency LightingDavid Asfourprogress
02/27/2023FinalGIORGI KHARDZEISHVILIprogress
02/27/2023Excavations - Sheeting, Shoring, and BracingGIORGI KHARDZEISHVILIspecial
02/27/2023Subsurface Investigations (Borings/Test Pits)Jan Cermakspecial
Latest 25 of 48.
▾Documents — 600 on file (BIS + DOB NOW)
▸Plans & Drawings54
▸DOB NOWPlans/Sketch47
09/01/2026B00575240-I1Request digital key ↗
08/31/2026B00651329-I1Request digital key ↗
08/31/2026B00688778-I1Request digital key ↗
Showing 3 of 47 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/27/2026B00905818-I1Request digital key ↗
08/15/2026B00905800-I1Request digital key ↗
08/15/2026B00905811-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
08/25/2026B01020358-I1Request digital key ↗
08/25/2026B01029954-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/01/2026B00196740-I1Request digital key ↗
08/15/2026B00196740-P1Request digital key ↗
▸Applications & Permits118
▸BISPLAN / WORK APPROVAL APPLICATION96
12/09/2024301623848Open ↗
12/06/2024301862465Open ↗
08/26/2024300132728Open ↗
Showing 3 of 96 on file for this type
▸BISWORK PERMIT APPLICATION20
12/06/2022320910010Open ↗
10/27/2022340869787Open ↗
07/19/2022320910010Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/08/2023320910010Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/27/2024320910010Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications124
▸DOB NOWDPL-1: Design Professional Seal & Signature53
09/01/2026B00575240-I1Open ↗
08/31/2026B00688778-P3Open ↗
08/31/2026B00688778-P2Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/23/2026B08044382-I1Open ↗
09/10/2026B00786666-I1Open ↗
09/04/2026B08044382-P1Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B00905800-I1Open ↗
09/01/2026B08023778-P1Open ↗
08/30/2026B08023778-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/20/2022340869787Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/20/2022340869787Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/20/2022340869787Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment33
▸BISEQUIPMENT USE PERMITS14
05/14/2024320910010Open ↗
05/14/2024320910010Open ↗
05/14/2024320910010Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING12
03/14/2024320910010Open ↗
03/08/2024320910010Open ↗
02/23/2024320910010Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
05/14/2024320910010Open ↗
05/14/2024320910010Open ↗
05/14/2024320910010Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHEATING SYSTEMS1
04/01/2024320910010Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
07/19/2022320910010Open ↗
07/13/2022320910010Open ↗
Showing 2 of 3 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos33
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/01/2026B00575240-I1Open ↗
08/28/2026B00776871-P1Open ↗
08/28/2026B08044382-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/28/2026B08003999-I1Open ↗
08/28/2026B00786666-I1Open ↗
08/27/2026B08023778-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
09/26/2025321994204Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
09/25/2025321994204Open ↗
03/29/2024320910010Open ↗
03/29/2024320910010Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
09/25/2025321994204Open ↗
03/29/2024320910010Open ↗
03/29/2024320910010Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLIGHTING CONTROLS1
04/01/2024320910010Open ↗
▸BIS* HVAC INSULATION AND SEALING1
04/01/2024320910010Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/01/2024320910010Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/09/2024320910010Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00575240-I1Open ↗
▸Inspections & Test Reports43
▸BISTECHNICAL REPORT: RESPONSIBILITY27
09/25/2025321994204Open ↗
04/22/2024320910010Open ↗
04/02/2024320910010Open ↗
Showing 3 of 27 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
09/10/2024320300367Open ↗
04/04/2024320910010Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
04/12/2024320910010Open ↗
12/05/2022320910010Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
04/01/2024320910010Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026B08023778-P1Open ↗
08/13/2026B08023778-I1Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
04/01/2024320910010Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
04/01/2024320910010Open ↗
▸BISMECHANICAL SYSTEMS1
03/29/2024320910010Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
03/29/2024320910010Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
04/12/2024320910010Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08023778-I1Open ↗
▸Approvals, Objections & Sign-offs54
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter24
08/28/2026B00786666-I1Open ↗
08/28/2026B00786666-P1Open ↗
08/15/2026B00786666-P2Open ↗
Showing 3 of 24 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
02/27/2024320910010Open ↗
02/23/2024320910010Open ↗
02/21/2024320910010Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
09/26/2025321994204Open ↗
10/28/2024320300367Open ↗
05/22/2024340869787Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
09/10/2024320300367Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT25
09/25/2025321994204Open ↗
03/29/2024320910010Open ↗
03/29/2024320910010Open ↗
Showing 3 of 25 on file for this type
▸Filing & Intake Forms48
▸BISADDITIONAL INFORMATION28
03/27/2024320910010Open ↗
03/20/2024320910010Open ↗
02/29/2024320910010Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING COVER SHEET12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
10/20/2022340869787Open ↗
Showing 1 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00776871-P2Open ↗
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
04/22/2024320910010Open ↗
04/22/2024320910010Open ↗
01/30/2024320277678Open ↗
Showing 3 of 7 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION1
10/20/2022340869787Open ↗
▸BISMAINTENANCE INFORMATION1
04/01/2024320910010Open ↗
▸BISPLOT DIAGRAM1
07/13/2022320910010Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00776871-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01119432-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01119432-I1Open ↗