Roof1p · 2 filings · 9 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
FILING HEREWITH DRAWINGS TO REMOVE AND REPLACE ONE (1) NEW WOOD WATER TANK AND ASSOCIATED PIPING TO EXISTING SYSTEM. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EXISTS OR OCCUPANCY.
On file for this project
3 documents
INSTALL TWO (2) REPLACEMENT SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Floor 72 filings · 20 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Structural · Supported Scaffold
Filing to reflect the removal of the 7th floor scope.
On file for this project
26 documents
INSTALLATION OF A TEMPORARY MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. MATERIAL HOIST TO COMPLY WITH NYC BUILDING CODE, CHAPTER 33.
On file for this project
3 documents
Floor 61p · 4 filings · 20 docs
ArchitectureDMEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Structural · Supported Scaffold
Filing to reflect the removal of the 7th floor scope.
On file for this project
26 documents
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
On file for this project
6 documents
Interior Selected demolition of Floors Cellar - through 6th Floor of paramount theater located at 385 flatbush avenue extension. No change in egress use or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 54 filings · 20 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Structural · Supported Scaffold
Filing to reflect the removal of the 7th floor scope.
On file for this project
26 documents
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
On file for this project
6 documents
Interior Selected demolition of Floors Cellar - through 6th Floor of paramount theater located at 385 flatbush avenue extension. No change in egress use or occupancy.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 41p · 5 filings · 20 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Structural · Supported Scaffold
INSTALL TWO (2) REPLACEMENT SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Filing to reflect the removal of the 7th floor scope.
On file for this project
26 documents
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
On file for this project
6 documents
Latest 3 of 5 filings on this floor.
Floor 33p · 6 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionLandscapeMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
SPRINKLER/ STANDPIPE WORK AS PER PLANS FILED HEREWITH.
On file for this project
12 documents · 2 drawing sheets
Filing to reflect the removal of the 7th floor scope.
On file for this project
26 documents
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
On file for this project
6 documents
Latest 3 of 6 filings on this floor.
Floor 25p · 10 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
SPRINKLER/ STANDPIPE WORK AS PER PLANS FILED HEREWITH.
On file for this project
12 documents · 2 drawing sheets
Filing to reflect the removal of the 7th floor scope.
On file for this project
26 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
On file for this project
6 documents
Latest 3 of 10 filings on this floor.
Floor 14p · 11 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
PLUMBING AND SPRINKLER SCOPE FILED IN ASSOCIATION WITH INTERIOR RENOVATION.
On file for this project
9 documents
SPRINKLER/ STANDPIPE WORK AS PER PLANS FILED HEREWITH.
On file for this project
12 documents · 1 drawing sheet
Filing to reflect the removal of the 7th floor scope.
On file for this project
26 documents · 1 drawing sheet
Latest 3 of 11 filings on this floor.
Cellar9p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Plumbing · Sprinklers · Standpipe · Structural
PLUMBING AND SPRINKLER SCOPE FILED IN ASSOCIATION WITH INTERIOR RENOVATION.
On file for this project
9 documents
SPRINKLER/ STANDPIPE WORK AS PER PLANS FILED HEREWITH.
On file for this project
12 documents · 3 drawing sheets
Filing to reflect the removal of the 7th floor scope.
On file for this project
26 documents · 3 drawing sheets
Latest 3 of 9 filings on this floor.
Basement2p · 1 filing · 20 docs
Plumbing
Provide new 2 hot water boilers and associated pumps for future new tenant. No change in use and egress.
On file for this project
29 documents · 2 drawing sheets
Sub-Basement2 filings · 20 docs
Mechanical
Issued Permit Scope
Boiler Equipment · Mechanical Systems
removal of abandoned boiler. no change in use or egress. Existing Oil Tank will be abandoned, The Abandoned process will be filed under different application by Plumber.
On file for this project
6 documents
Provide new 2 hot water boilers and associated pumps for future new tenant. No change in use and egress.
On file for this project
29 documents
Site & exterior8 filings · 20 docs
ArchitectureCivilEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 8 drawing sheets
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents · 6 drawing sheets
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Filed — no permit issued2 filings · 7 docs
GeneralMechanical
REPLACE EXISTING 10 TON SCAV UNIT CONNECTIONG TO EXISTING DUCT WORK, CONDENSATE PIPING, POWER AND CONTROLS
On file for this project
4 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 5 drawing sheets