Elevator cooperative
371 FT WASHINGTON AVENUE
MANHATTAN · BIN 1063449
💬 Discuss this project
1923Year Built
6Stories
D4Building Class
R8Zoning
81,804 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized44 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 371 FORT WASHINGTON OWNERS COR · 15,334 sf lot · 5.33 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 10 docs
Floor 23p · 1 filing · 7 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOLSTICE RESIDENTIAL GROUP707/08/2026
AEGON ASSET MANAGEMENT1607/08/2026
371 FTW OWNER'S CORP2107/08/2026
371 FORT WASHINGTON OWNERS COR103/22/2026
371 FT WASHINGTON OWNERS CORP2803/22/2026
TUDOR REALTY SERVICES703/22/2026
371 FORT WASHINGTON O103/22/2026
371 FT. WASHINGTON OWN203/22/2026
C/O TUDOR REALTY SERVICES CORP203/21/2026
371 FT WASHINGTON OWNERS C O TUD203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1403/21/2026
ANGEL A GARABITO EXPEDITING603/21/2026
EAST COAST EXPEDITING603/21/2026
ARISTAR GROUP403/21/2026
JENNY FLORES EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TREDENT CONTRACTING SERVIGeneral Contractor1107/08/2026
PAINT MASTERS NY INCGeneral Contractor603/21/2026
SPARACO'S P&H CORPPlumbing507/08/2026
HFM BUILDERS, INCGeneral Contractor507/08/2026
WILLIAM SHARINNElectrical203/21/2026
GABBIDON, CECILElectrical103/21/2026
GUSTAVE DILEO, JR.Electrical103/21/2026
DNA PLUMBING CONTR. INCPlumbing107/08/2026
WIRE WORKS ELECTL CONTRACElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BESPOKE ARCHITECTURE, PLL6403208/10/2023
CROSSCHECK INSPECTION SER544208/24/2022
FSI ARCHITECTURE, PC354308/02/2022
Building Lifecycle
All (175)Filed (22)Permit Issued (18)Signed Off (8)Facade (FISP) (23)Violation (60)Inspection (8)Objection (26)Special Inspection (10)
06/04/2026
Objection raised — Accessibility
06/04/2026
Objection raised — Scope
05/29/2026
Filed — Alteration
RECONFIGURATION OF EXISTING 3-PC BATHROOM WITHIN UNIT 1A
M01402830-I1
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/22/2025
Violation issued (HPD, open)
B
09/22/2025
Violation issued (HPD, open)
C
09/22/2025
Violation issued (HPD, open)
B
09/22/2025
Violation issued (HPD, closed)
A
09/22/2025
Violation issued (HPD, closed)
C
09/22/2025
Violation issued (HPD, open)
C
09/22/2025
Violation issued (HPD, open)
C
09/22/2025
Violation issued (HPD, open)
C
09/22/2025
Violation issued (HPD, open)
B
08/23/2025
Violation issued (HPD, closed)
C
08/23/2025
Violation issued (HPD, open)
B
08/23/2025
Violation issued (HPD, open)
A
08/23/2025
Violation issued (HPD, open)
A
08/23/2025
Violation issued (HPD, closed)
C
02/21/2025
Signed off — Alteration
INSTALLATION OF APPROXIMATELY +/- 400 LF OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00681980-I1
02/21/2025
Signed off — Alteration
INSTALLATION OF +/- 376 FEET WIDE X +/- 54 FEET HIGH TEMPORARY SUPPORTED SCAFFOLDING AND STAIR TOWER ON TOP OF EXISTING SIDEWALK SHED, AS PER PLANS, FOR FACADE RESTORATION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00903326-I1
01/30/2025
Signed off — Alteration
HEREBY FILING FOR RENOVATION OF APT #6E. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01039020-I1
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/2024
Cycle 9 facade report signed — SAFE
09/06/2024
Cycle 9 facade report submitted
08/29/2024
Permit issued — General Construction
M01039020-I1-GC
08/26/2024
Signed off — Alteration
General construction associated with facade restoration as per plans filed. No change in occupancy, use or egress.
M00540321-I1
08/08/2024
Filed — Alteration
HEREBY FILING FOR RENOVATION OF APT #6E. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01039020-I1
07/25/2024
Cycle 9 facade inspection completed
07/18/2024
Permit issued — Supported Scaffold
M00903326-I1-SF
05/21/2024
Special inspection requirement — Interior lighting power
Dionisio Cortes Ortega
04/19/2024
Special inspection requirement — Final
Dionisio Cortes Ortega
04/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Dionisio Cortes Ortega
01/26/2024
Permit issued — Sidewalk Shed
M00681980-I1-SH
01/02/2024
Signed off — Alteration
INTERIOR RENOVATION TO THE SUPER'S APARTMENT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION
M00671077-I1
11/03/2023
Permit issued — General Construction
M00540321-I1-GC
08/10/2023
Filed — Alteration
ALTERATION TO LAYOUT OF AN EXISTING APARTMENT #4D. RENOVATION OF ONE KITCHEN, AND ONE BATHROOM. RELOCATION OF INTERIOR NON-BEARING PARTITIONS.
M00908327-S1
08/10/2023
Filed — Alteration
ALTERATION TO LAYOUT OF AN EXISTING APARTMENT #4D. RENOVATION OF ONE KITCHEN, AND ONE BATHROOM. RELOCATION OF INTERIOR NON-BEARING PARTITIONS.
M00908327-I1
07/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter Holtzman
07/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Peter Holtzman
07/17/2023
Permit issued — Supported Scaffold
M00903326-I1-SF
07/12/2023
Filed — Alteration
INSTALLATION OF +/- 376 FEET WIDE X +/- 54 FEET HIGH TEMPORARY SUPPORTED SCAFFOLDING AND STAIR TOWER ON TOP OF EXISTING SIDEWALK SHED, AS PER PLANS, FOR FACADE RESTORATION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00903326-I1
03/15/2023
Violation issued (HPD, closed)
A
02/16/2023
Cycle 9 facade report submitted
02/16/2023
Cycle 9 facade report signed — UNSAFE
02/15/2023
Permit issued — Sidewalk Shed
M00681980-I1-SH
02/14/2023
Cycle 9 facade inspection completed
01/18/2023
Signed off — Alteration
plumbing work during apartment renovation for apartment 2E on 2nd floor
M00505134-I1
01/17/2023
Signed off — Alteration
apartment renovation
M00505112-I1
01/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/10/2023
Filed — Alteration
plumbing work during apartment renovation for apartment 2E on 2nd floor
M00505134-P2
12/29/2022
Objection resolved — Addressed
12/29/2022
Objection resolved — Addressed
12/29/2022
Objection resolved — Addressed
12/29/2022
Objection resolved — Addressed
12/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/12/2022
Filed — Alteration
M00671107-P1
12/08/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/02/2022
Permit issued — Plumbing
M00505134-I1-PL
11/30/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/09/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 175 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPAINT MASTERS NY INC08/29/2024
DOB NOWSupported ScaffoldSigned-offTREDENT CONTRACTING SERVI07/18/2024
DOB NOWSidewalk ShedSigned-offTREDENT CONTRACTING SERVI01/26/2024
DOB NOWGeneral ConstructionSigned-offTREDENT CONTRACTING SERVI11/03/2023
DOB NOWSupported ScaffoldSigned-offTREDENT CONTRACTING SERVI07/17/2023
DOB NOWSidewalk ShedSigned-offTREDENT CONTRACTING SERVI02/15/2023
DOB NOWPlumbingSigned-offSPARACO'S P&H CORP12/02/2022
DOB NOWGeneral ConstructionSigned-offTREDENT CONTRACTING SERVI09/15/2022
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC05/12/2022
DOB NOWGeneral ConstructionSigned-offPAINT MASTERS NY INC04/05/2022
DOB NOWSidewalk ShedSigned-offTREDENT CONTRACTING SERVI02/17/2022
DOB NOWGeneral ConstructionSigned-offHFM BUILDERS09/27/2021
DOB NOWGeneral ConstructionSigned-offHFM BUILDERS08/10/2021
DOB NOWPlumbingSigned-offSPARACO'S P&H CORP07/12/2021
DOB NOWGeneral ConstructionSigned-offHFM BUILDERS07/09/2021
DOB NOWPlumbingSigned-offSPARACO'S P&H CORP04/27/2021
DOB NOWPlumbingSigned-offSPARACO'S P&H CORP10/21/2020
DOB NOWPlumbingSigned-offSPARACO'S P&H CORP03/18/2020
BISOTISSUEDHFM BUILDERS, INC10/19/2020
BISPLISSUEDSPARACO'S P&H CORP03/07/2019
BISOTISSUEDHFM BUILDERS, INC03/05/2019
BISPLISSUEDORBIT PLBG & HTG INC06/19/2017
BISOTISSUEDPOLMAR CONSTRUCTION CORP04/07/2017
BISOTISSUEDACCURA REST.& WATERPROOF06/17/2015
BISPLISSUEDCC CONTROLLED PLBG CO INC02/13/2015
BISOTISSUEDACME AWNING CO. INC09/23/2014
BISPLISSUEDEXPRESS PLBG HTG&GAS LEAK02/26/2014
BISOTISSUEDROMEL CONSTRUCTION CORP02/24/2014
BISPLISSUEDCC CONTROLLED PLBG CO INC08/21/2012
BISFBISSUEDC C CONTROLLED COMBUSTION08/21/2012
BISOTISSUEDUPGRADE CONTR. CO. INC02/21/2012
BISOTISSUEDUPGRADE CONTR. CO. INC08/15/2011
BISEQISSUEDEVEREST SCAFFOLDING INC03/24/2011
BISOTISSUEDAIRITAN CONSTR CORP03/16/2011
BISOTISSUEDUPGRADE CONTR. CO. INC09/16/2010
BISOTISSUEDUPGRADE CONTR. CO. INC07/15/2010
BISEQISSUEDEVEREST SCAFFOLDING INC06/24/2010
BISPLISSUEDWILLIAM C. GERAKARIS P&H10/28/2009
BISOTISSUEDNY DELTA CONSTR INC10/02/2009
BISFSISSUEDNAT'L GRID ENERGY MGMT LL11/06/2008
+ 12 more permits on file
4 projects · most recent 05/29/2026
Water/Sanitary Gas Plumbing-Sprinkler
FiledStatusContractorScope
05/29/2026——Water/Sanitary
08/10/2023——Gas, Water/Sanitary
03/01/2022——Plumbing-Sprinkler
09/16/2020Signed-offSPARACO'S P&H CORPGas, Water/Sanitary
12 projects · most recent 01/23/2026
General Wiring
FiledStatusContractorScope
01/23/2026CompletePRIME LIGHT ELEC'L CONSTRGeneral Wiring
12/09/2025CompletePRIME LIGHT ELEC'L CONSTRGeneral Wiring
10/31/2024Permit IssuedHYLAN DATACOM & ELECL LLC1 meters, 1 new_meters
08/01/2023CompleteWIRE WORKS ELECTL CONTRACGeneral Wiring
06/10/2022CompleteMLS ELECTRIC LLCGeneral Wiring
03/15/2022Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
08/23/2021Permit IssuedV. VASS ELECTRIC CORPGeneral Wiring
11/20/2020CompleteV. VASS ELECTRIC CORPGeneral Wiring
11/19/2019CompleteV. VASS ELECTRIC CORPGeneral Wiring
09/16/2019CompleteSTAR ELEC'L CONTRACTORS C—
03/15/2019CompleteV. VASS ELECTRIC CORPGeneral Wiring
12/13/2018CompleteBERGER QUALITY ELEC'L CONGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/09/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/15/2026Fire-Resistant Penetrations and Joints—special
05/21/2024Interior lighting powerDionisio Cortes Ortegaenergy_progress
04/19/2024FinalDionisio Cortes Ortegaprogress
04/19/2024Energy Code Compliance InspectionsDionisio Cortes Ortegaprogress
07/31/2023Fire-Resistant Penetrations and JointsPeter Holtzmanspecial
07/31/2023HVAC-R and service water piping design and insulationPeter Holtzmanenergy_progress
07/15/2022FinalJames Cicaloprogress
07/15/2022Energy Code Compliance InspectionsJames Cicaloprogress
07/15/2022Structural Stability – Alterations of existing buildingsJames Cicalospecial
07/15/2022MasonryJames Cicalospecial
▾Documents — 311 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch17
09/03/2026M00505112-I1Request digital key ↗
09/02/2026M00681980-I1Request digital key ↗
09/02/2026M00671077-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/04/2026M00293425-P1Request digital key ↗
09/04/2026M00293425-I1Request digital key ↗
09/04/2026M00293425-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits54
▸BISPLAN / WORK APPROVAL APPLICATION31
03/14/2024123509989Open ↗
09/01/2020140946840Open ↗
08/19/2020140936771Open ↗
Showing 3 of 31 on file for this type
▸BISWORK PERMIT APPLICATION21
10/19/2020140946840Open ↗
11/07/2019123194550Open ↗
03/08/2019123426649Open ↗
Showing 3 of 21 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
05/24/2017122115399Open ↗
01/17/2013120633911Open ↗
▸Seals & Professional Certifications72
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/04/2026M00293425-P1Open ↗
09/04/2026M00293425-I1Open ↗
09/04/2026M00293425-P2Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
12/02/2019123509989Open ↗
11/07/2019123194550Open ↗
09/19/2019123426649Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
11/07/2019123194550Open ↗
02/14/2019123426649Open ↗
06/07/2016122738216Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
09/01/2020140946840Open ↗
08/19/2020140936771Open ↗
11/07/2019123194550Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M01039020-I1Open ↗
09/01/2026M01039020-I1Open ↗
09/01/2026M01039020-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
08/23/2012121140425Open ↗
03/17/2011120633911Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/01/2020140946840Open ↗
08/19/2020140936771Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/01/2020140946840Open ↗
08/19/2020140936771Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026M00540321-P1Open ↗
08/23/2026M00540321-P1Open ↗
▸Trade Schedules & Equipment27
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
07/26/2019123426649Open ↗
07/25/2019123426649Open ↗
07/18/2019123426649Open ↗
Showing 3 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
03/06/2015121140425Open ↗
07/17/2014121868167Open ↗
07/17/2014121868167Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING3
12/17/2013121868167Open ↗
08/23/2012121140425Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
10/07/2013121140425Open ↗
08/23/2012121140425Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION2
03/06/2015121140425Open ↗
07/23/2013121140425Open ↗
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes6
12/02/2019123509989Open ↗
11/07/2019123194550Open ↗
02/14/2019123426649Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan5
09/04/2026M00293425-P1Open ↗
09/04/2026M00293425-I1Open ↗
09/04/2026M00293425-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos31
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/04/2026M00293425-I1Open ↗
09/04/2026M00293425-P2Open ↗
09/04/2026M00293425-P1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
12/02/2019123509989Open ↗
11/07/2019123194550Open ↗
06/07/2016122738216Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/03/2026M00505112-I1Open ↗
08/29/2026M00908327-S1Open ↗
08/29/2026M00908327-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
03/17/2011120633911Open ↗
Showing 1 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/19/2020140946840Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/05/2019123426649Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
12/02/2019123509989Open ↗
11/07/2019123194550Open ↗
02/14/2019123426649Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/22/2020123194550Open ↗
10/19/2020140946840Open ↗
09/19/2019123426649Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/01/2020140946840Open ↗
08/19/2020140936771Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/19/2020140946840Open ↗
08/19/2020140936771Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/10/2021140946840Open ↗
12/22/2020123194550Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/10/2021140946840Open ↗
▸BISINTERIOR LIGHTING POWER1
05/10/2021140946840Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/10/2021140946840Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/19/2020140946840Open ↗
10/19/2020140946840Open ↗
10/19/2020140946840Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/10/2021140946840Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
05/10/2021140946840Open ↗
12/22/2020123194550Open ↗
09/19/2019123426649Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
08/23/2012121140425Open ↗
06/25/2010120393181Open ↗
Showing 2 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/17/2013120633911Open ↗
05/27/2011120393181Open ↗
▸BISFINAL1
05/10/2021140946840Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT21
09/01/2020140946840Open ↗
08/19/2020140936771Open ↗
12/02/2019123509989Open ↗
Showing 3 of 21 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/10/2021140946840Open ↗
▸Filing & Intake Forms28
▸BISEFILING COVER SHEET13
12/02/2019123509989Open ↗
11/07/2019123194550Open ↗
02/14/2019123426649Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION9
12/26/2019123509989Open ↗
12/17/2019123509989Open ↗
12/02/2019123509989Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM4
09/19/2019123426649Open ↗
07/25/2019123426649Open ↗
07/10/2019123426649Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/01/2020140946840Open ↗
08/19/2020140936771Open ↗
▸Other Documents3
▸BISDepartment of Consumer Affairs (DCA) Form1
02/26/2014121868167Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDHCR Document1
08/13/2026M00903326-I1Open ↗