← Back
Walk-up cooperative
371 WEST STREET
MANHATTAN · West Village · BIN 1083167
💬 Discuss this project
1960Year Built
5Stories
C6Building Class
C1-6AZoning
215,890 sfGross Floor Area
184Units
LL97 CoveredRent Stabilized62 Open Violations 61 unresolved · 1 paperwork only ▸
Walk-up cooperative · Owner of record: WVH HOUSING CORPORATION · 66,825 sf lot · 3.23 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbingEquipmentLandscapeGeneral
Roof2p · 1 filing · 12 docs
Floor 15p · 2 filings · 14 docs
Site & exterior1p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES, INC.1607/08/2026
TOPLINE NYC INC.503/22/2026
WVH HOUSING CORPORATION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ORPHEUS ASSOCIATES210/17/2024
COWLEY ENGINEERING, PC202/23/2024
ASR ENGINEERING PC102/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACS ENVIRONMENTAL CONSTRUCTION403/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
THERESA VOLTAGGIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACS ENVIRONMENTAL & CONSTGeneral Contractor407/08/2026
MASON CONSTRUCTION SERVICGeneral Contractor303/21/2026
TOPLINE NYC INCGeneral Contractor303/21/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IRVING B. PRUS6993110/17/2024
COWLEY ENGINEERING186202/23/2024
Building Lifecycle
All (55)Filed (5)Permit Issued (5)Signed Off (1)Violation (25)Inspection (3)Special Inspection (16)
02/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/21/2024
Permit issued — Plumbing
M01128024-S1-PL
11/15/2024
Permit issued — General Construction
M01128024-I1-MS
11/15/2024
Permit issued — Mechanical Systems
M01128024-I1-GC
10/17/2024
Filed — Alteration
INTERIOR RENOVATION IN AN EXIST'G. APT 1A: KITCHEN AND BATHROOM RENOVATION, REPLACEMENT WINDOWS IN EXIST'G. OPENING, INSTALL (5) TONS SPLIT HEAT PUMP (3) ZONES HVAC UNIT, FLOOR REPAIR & PAINT THE ENTIRE APARTMEN AS PER PLAN. NO CHANGE IN USE, EGRESS OR OC
M01128024-I1
10/17/2024
Filed — Alteration
INTERIOR RENOVATION IN AN EXIST'G. APT 1A: KITCHEN AND BATHROOM RENOVATION, REPLACEMENT WINDOWS IN EXIST'G. OPENING, INSTALL (5) TONS SPLIT HEAT PUMP (3) ZONES HVAC UNIT, FLOOR REPAIR & PAINT THE ENTIRE APARTMEN AS PER PLAN. NO CHANGE IN USE, EGRESS OR OC
M01128024-S1
10/17/2024
Special inspection requirement — Fenestration areas
MICHAEL CALVI
10/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL CALVI
10/16/2024
Special inspection requirement — Final
MICHAEL CALVI
10/16/2024
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL CALVI
10/16/2024
Special inspection requirement — Mechanical Systems
IRVING PRUS
10/16/2024
Special inspection requirement — Lighting in dwelling units
MICHAEL CALVI
09/11/2024
Signed off — Alteration
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00886386-I1
02/27/2024
Special inspection requirement — Masonry
Eric Cowley
02/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Cowley
02/27/2024
Special inspection requirement — Post-installed Anchors
Eric Cowley
02/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Cowley
02/27/2024
Special inspection requirement — Final
Eric Cowley
02/23/2024
Filed — Alteration
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00886386-P1
02/23/2024
Special inspection requirement — Masonry
Eric Cowley
02/23/2024
Special inspection requirement — Final
Eric Cowley
02/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Cowley
02/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Cowley
02/23/2024
Special inspection requirement — Post-installed Anchors
Eric Cowley
02/22/2024
Permit issued — General Construction
M00886386-I1-GC
02/16/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01004678-I1
02/16/2024
Permit issued — Sidewalk Shed
M01004678-I1-SH
01/26/2024
Filed — Alteration
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00886386-I1
03/23/2021
Violation issued (HPD, open)
B
03/23/2021
Violation issued (HPD, open)
B
03/23/2021
Violation issued (HPD, open)
A
03/23/2021
Violation issued (HPD, open)
C
03/23/2021
Violation issued (HPD, open)
B
03/23/2021
Violation issued (HPD, open)
A
01/13/2021
Violation issued (HPD, open)
C
03/09/2017
Violation issued (HPD, open)
A
03/09/2017
Violation issued (HPD, open)
A
03/09/2017
Violation issued (HPD, open)
B
03/09/2017
Violation issued (HPD, open)
B
03/09/2017
Violation issued (HPD, open)
A
03/09/2017
Violation issued (HPD, open)
A
03/09/2017
Violation issued (HPD, open)
A
03/02/2017
Violation issued (HPD, open)
A
11/23/2016
Violation issued (HPD, closed)
I
03/02/2015
Violation issued (HPD, closed)
I
01/05/2007
Violation issued (HPD, open)
A
01/05/2007
Violation issued (HPD, open)
B
01/05/2007
Violation issued (HPD, closed)
A
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP11/21/2024
DOB NOWGeneral ConstructionPermit IssuedACS ENVIRONMENTAL & CONST11/15/2024
DOB NOWMechanical SystemsPermit IssuedACS ENVIRONMENTAL & CONST11/15/2024
DOB NOWGeneral ConstructionSigned-offMASON CONSTRUCTION SERVIC02/22/2024
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC02/16/2024
1 project · most recent 10/17/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/17/2024Permit IssuedACS ENVIRONMENTAL & CONSTHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MTSUBISHI MODEL MXZ-SM60NAM2- UL 1995 60,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 10/17/2024
Water/Sanitary
FiledStatusContractorScope
10/17/2024Signed-offDPH PLUMBING & HTG CORPWater/Sanitary
3 projects · most recent 01/05/2026
General Wiring
FiledStatusContractorScope
01/05/2026CompleteAE ELECTRIC INCGeneral Wiring
11/15/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
02/17/2024Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
10/17/2024Fenestration areasMICHAEL CALVIenergy_progress
10/16/2024Fire-Resistance Rated ConstructionMICHAEL CALVIprogress
10/16/2024FinalMICHAEL CALVIprogress
10/16/2024Energy Code Compliance InspectionsMICHAEL CALVIprogress
10/16/2024Mechanical SystemsIRVING PRUSspecial
10/16/2024Lighting in dwelling unitsMICHAEL CALVIenergy_progress
02/27/2024MasonryEric Cowleyspecial
02/27/2024Tenant Protection Plan ComplianceEric Cowleyspecial
02/27/2024Post-installed AnchorsEric Cowleyspecial
02/27/2024Structural Stability – Alterations of existing buildingsEric Cowleyspecial
02/27/2024FinalEric Cowleyprogress
02/23/2024MasonryEric Cowleyspecial
02/23/2024FinalEric Cowleyprogress
02/23/2024Tenant Protection Plan ComplianceEric Cowleyspecial
02/23/2024Structural Stability – Alterations of existing buildingsEric Cowleyspecial
02/23/2024Post-installed AnchorsEric Cowleyspecial
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026M00886386-P1Request digital key ↗
08/28/2026M00886386-I1Request digital key ↗
08/28/2026M01004678-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026M00886386-P1Open ↗
08/27/2026M00886386-I1Open ↗
08/24/2026M01128024-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026M00886386-P1Open ↗
08/28/2026M00886386-I1Open ↗
08/13/2026M01128024-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026M00886386-P1Open ↗
08/29/2026M00886386-P1Open ↗
08/27/2026M00886386-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026M00886386-I1Open ↗
08/28/2026M00886386-P1Open ↗
08/13/2026M01128024-I1Open ↗
Showing 3 of 4 on file for this type