← Back
Two family brick
3712 AVENUE H
BROOKLYN · Flatlands · BIN 3206612
💬 Discuss this project
1935Year Built
1.75Stories
B1Building Class
R4Zoning
1,828 sfGross Floor Area
2Units
Two family brick · 3,400 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR106/20/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281106/20/2024
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Inspection (2)Special Inspection (5)
09/10/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/27/2024
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 22 Panels, 9.02 kW
B01060739-I1
07/02/2024
Permit issued — Solar
B01060739-I1-SL
06/20/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 22 Panels, 9.02 kW
B01060739-I1
06/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
06/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
06/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
06/03/2024
Special inspection requirement — Final
Mina Makar
06/03/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR07/02/2024
2 projects · most recent 06/07/2024
General Wiring
FiledStatusContractorScope
06/07/2024CompleteISLAND ELECTRIC CORP—
09/11/2018CompleteTRINCITY ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/10/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/03/2024Fire-Resistant Penetrations and JointsMina Makarspecial
06/03/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
06/03/2024Energy Code Compliance InspectionsMina Makarprogress
06/03/2024FinalMina Makarprogress
06/03/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026B01060739-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B01060739-I1Open ↗
08/24/2026B01060739-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01060739-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B01060739-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01060739-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01060739-I1Open ↗