371A GREENE AVENUE
BROOKLYN · BIN 3055833
💬 Discuss this project
1905Year Built
3Stories
C3Building Class
R6BZoning
2,700 sfGross Floor Area
4Units
Rent Stabilized25 Open Violations ▸FDNY Report ↗
Four families · 2,142 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Floor 13p · 1 filing · 8 docs
Cellar1p · 1 filing · 20 docs
Sub-Basement3p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/07/2022$3.1M—Private party → Private party$1,157/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENGINEERING PROFESSIONAL SERVICE P.504/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARINNITY NYC503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STAR RENOVATIONS NY LTDGeneral Contractor303/21/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369404/25/2025
ENTHINK ENGINEERS LLC6247203/27/2025
Building Lifecycle
All (118)Filed (5)Permit Issued (2)Signed Off (1)Violation (32)Inspection (6)Objection (42)Special Inspection (30)
05/04/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/09/2025
Violation issued (HPD, open)
A
05/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
04/25/2025
Filed — Alteration
NEW PLUMBING WORK APT #1. IN CONJUNCTION WITH # B01019183
B01014676-P1
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
04/18/2025
Signed off — Alteration
NEW DECK ON THE 1-ST FLOOR, FIRE ESCAPE MODIFICATION. DECK STRUCTURAL WORK. COMBINATION OF APTS ON 1-ST FLOOR AND BASEMENT, STAIR BLOCKING ON THE 1-ST FLOOR. IN ACCORDANCE WITH TPPN 03/97. NEW AC UNIT. PDA # 00002418. NO CHANGE OF USE OR OCCUPANCY
B01019183-I1
04/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/04/2025
Special inspection requirement — Structural Steel - Welding
Sunil Saigal
04/04/2025
Special inspection requirement — Mechanical Systems
Luis Pichardo
04/04/2025
Special inspection requirement — Concrete - Cast-In-Place
Luis Pichardo
04/04/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Sunil Saigal
04/04/2025
Special inspection requirement — Final
RONALD VILLANO
04/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Luis Pichardo
04/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Luis Pichardo
04/04/2025
Special inspection requirement — Interior lighting power
Luis Pichardo
04/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Luis Pichardo
04/04/2025
Special inspection requirement — Structural Steel - Details
Luis Pichardo
04/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
03/27/2025
Filed — Alteration
NEW DECK ON THE 1-ST FLOOR, FIRE ESCAPE MODIFICATION. DECK STRUCTURAL WORK. COMBINATION OF APTS ON 1-ST FLOOR AND BASEMENT, STAIR BLOCKING ON THE 1-ST FLOOR. IN ACCORDANCE WITH TPPN 03/97. NEW AC UNIT. PDA # 00002418. NO CHANGE OF USE OR OCCUPANCY
B01019183-P2
03/26/2025
Special inspection requirement — Mechanical Systems
Luis Pichardo
03/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
03/26/2025
Special inspection requirement — Structural Steel - Details
Luis Pichardo
03/26/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Sunil Saigal
03/26/2025
Special inspection requirement — Structural Steel - Welding
Sunil Saigal
03/26/2025
Special inspection requirement — Final
RONALD VILLANO
03/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
Luis Pichardo
03/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
Luis Pichardo
03/26/2025
Special inspection requirement — Interior lighting power
Luis Pichardo
03/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Luis Pichardo
03/26/2025
Special inspection requirement — Concrete - Cast-In-Place
Luis Pichardo
02/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/27/2024
Permit issued — Mechanical Systems
B01019183-I1-GC-CX
12/16/2024
Filed — Alteration
NEW DECK ON THE 1-ST FLOOR, FIRE ESCAPE MODIFICATION. DECK STRUCTURAL WORK. COMBINATION OF APTS ON 1-ST FLOOR AND BASEMENT, STAIR BLOCKING ON THE 1-ST FLOOR. IN ACCORDANCE WITH TPPN 03/97. NEW AC UNIT. PDA # 00002418. NO CHANGE OF USE OR OCCUPANCY
B01019183-P1
12/13/2024
Permit issued — Plumbing
B01014676-I1-PL
12/09/2024
Special inspection requirement — Concrete - Cast-In-Place
12/09/2024
Special inspection requirement — Structural Steel - Details
12/09/2024
Special inspection requirement — Structural Steel - High Strength Bolting
12/09/2024
Special inspection requirement — Structural Steel - Welding
12/09/2024
Special inspection requirement — Final
12/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
11/27/2024
Objection raised — Energy
11/27/2024
Objection resolved — Addressed
11/26/2024
Violation issued (HPD, open)
I
11/21/2024
Objection resolved — Addressed
11/15/2024
Objection resolved — Addressed
11/08/2024
Objection resolved — Addressed
11/08/2024
Objection resolved — Addressed
06/21/2024
Objection resolved — Addressed
06/14/2024
Objection resolved — Addressed
06/14/2024
Objection resolved — Addressed
06/14/2024
Objection resolved — Addressed
06/14/2024
Objection resolved — Addressed
06/14/2024
Objection resolved — Addressed
06/11/2024
Objection raised — Fire_Protection
06/10/2024
Objection raised — Scope
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSTAR RENOVATIONS NY LTD12/27/2024
DOB NOWPlumbingPermit IssuedHYDROKINETIC PLBG & HTG I12/13/2024
1 project · most recent 04/25/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/25/2025Permit IssuedHYDROKINETIC PLBG & HTG IGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
05/13/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
04/24/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
04/04/2025Structural Steel - WeldingSunil Saigalspecial
04/04/2025Mechanical SystemsLuis Pichardospecial
04/04/2025Concrete - Cast-In-PlaceLuis Pichardospecial
04/04/2025Structural Steel - High Strength BoltingSunil Saigalspecial
04/04/2025FinalRONALD VILLANOprogress
04/04/2025HVAC-R and service water heating system controlsLuis Pichardoenergy_progress
04/04/2025HVAC-R and service water heating equipmentLuis Pichardoenergy_progress
04/04/2025Interior lighting powerLuis Pichardoenergy_progress
04/04/2025HVAC-R and service water piping design and insulationLuis Pichardoenergy_progress
04/04/2025Structural Steel - DetailsLuis Pichardospecial
04/04/2025Structural Stability – Alterations of existing buildingsLuis Pichardospecial
03/26/2025Mechanical SystemsLuis Pichardospecial
03/26/2025Structural Stability – Alterations of existing buildingsLuis Pichardospecial
03/26/2025Structural Steel - DetailsLuis Pichardospecial
03/26/2025Structural Steel - High Strength BoltingSunil Saigalspecial
03/26/2025Structural Steel - WeldingSunil Saigalspecial
03/26/2025FinalRONALD VILLANOprogress
03/26/2025HVAC-R and service water heating equipmentLuis Pichardoenergy_progress
03/26/2025HVAC-R and service water heating system controlsLuis Pichardoenergy_progress
03/26/2025Interior lighting powerLuis Pichardoenergy_progress
03/26/2025HVAC-R and service water piping design and insulationLuis Pichardoenergy_progress
03/26/2025Concrete - Cast-In-PlaceLuis Pichardospecial
12/09/2024Concrete - Cast-In-Place—special
Latest 25 of 35.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/22/2026B01019183-I1Request digital key ↗
08/22/2026B01019183-P1Request digital key ↗
08/22/2026B01019183-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWSpecial Inspector Seal & Signature14
08/27/2026B01019183-P2Open ↗
08/27/2026B01019183-P2Open ↗
08/27/2026B01019183-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/27/2026B01019183-P2Open ↗
08/27/2026B01019183-P2Open ↗
08/27/2026B01019183-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/22/2026B01019183-P1Open ↗
08/22/2026B01019183-P2Open ↗
08/22/2026B01019183-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/22/2026B01019183-P2Open ↗
08/22/2026B01019183-P1Open ↗
08/22/2026B01019183-I1Open ↗
Showing 3 of 5 on file for this type