← Back
Factory, industrial, semi-fireproof
372 TEN EYCK STREET
BROOKLYN · East Williamsburg · BIN 3325762
💬 Discuss this project
1960Year Built
2Stories
F4Building Class
M1-2Zoning
33,445 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Factory, industrial, semi-fireproof · 35,850 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOUTHERN CONSULTING ENGINEERING PC207/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JARED ASSOCIATE CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HORBRIDGE PLUMBING HEATINGGeneral Contractor303/22/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI1008207/16/2020
Building Lifecycle
All (14)Filed (2)Permit Issued (1)Signed Off (1)Violation (6)Special Inspection (4)
07/31/2026
Signed off — Alteration
REPLACEMENT OF EXISTING GAS METER, PRESSURE TEST TO EXISTING GAS LINE DUE FIRE DAMAGE.
B00339475-I1
06/21/2023
Violation issued (FDNY_NOV, closed)
06/21/2023
Violation issued (FDNY_NOV, closed)
09/27/2022
Violation issued (FDNY_NOV, closed)
07/20/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
07/20/2020
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
07/16/2020
Filed — Alteration
REPLACEMENT OF EXISTING GAS METER, PRESSURE TEST TO EXISTING GAS LINE DUE FIRE DAMAGE.
B00339475-P1
07/14/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
07/14/2020
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
05/28/2020
Permit issued — Plumbing
B00339475-I1-PL
05/14/2020
Filed — Alteration
REPLACEMENT OF EXISTING GAS METER, PRESSURE TEST TO EXISTING GAS LINE DUE FIRE DAMAGE.
B00339475-I1
02/28/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2017
Violation issued (FDNY_NOV, closed)
08/18/2011
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT05/28/2020
1 project · most recent 07/16/2020
Gas
FiledStatusContractorScope
07/16/2020Signed-offHORBRIDGE PLUMBING & HEATGas
1 project · most recent 11/04/2018
General Wiring
FiledStatusContractorScope
11/04/2018Permit IssuedBLZ ELECTRIC INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/20/2020Fire-Resistant Penetrations and JointsGLEN LANGERspecial
07/20/2020Fire-Resistance Rated ConstructionGLEN LANGERprogress
07/14/2020Fire-Resistant Penetrations and JointsGLEN LANGERspecial
07/14/2020Fire-Resistance Rated ConstructionGLEN LANGERprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00339475-I1Request digital key ↗
08/15/2026B00339475-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00339475-P1Open ↗
08/13/2026B00339475-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026B00339475-I1Open ↗
08/24/2026B00339475-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026B00339475-I1Open ↗
08/24/2026B00339475-P1Open ↗