← Back
BuildNYC
Two family frame
3721 RICHMOND AVENUE
STATEN ISLAND · BIN 5073300
💬 Discuss this project
1915Year Built
1.75Stories
B2Building Class
R3AZoning
1,556 sfGross Floor Area
2Units
Two family frame · 6,800 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 2Under Construction14p · 1 filing · 20 docs
Floor 1Under Construction12p · 1 filing · 20 docs
CellarUnder Construction2p · 1 filing · 20 docs
BasementUnder Construction9p · 1 filing · 20 docs
Site & exteriorUnder Construction17p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Avid Designs411/25/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Karapanjo's ConstructionGeneral Contractor104/09/2026
Karapanjo's ConstructionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Avid Designs453211/25/2025
Building Lifecycle
02/26/2026
Permit issued — General Construction
S01221325-I1-GC-CX
02/13/2026
Permit issued — Construction Fence
S01221325-S3-FN
11/25/2025
Filed — Alteration CO
HEREWITH FILING THE ESTABLISHMENT AND REDUCTION OF AN EXISTING CURB CUT NOT PROVIDED ON EXISTING CERTIFICATE OF OCCUPANCY. NO OTHER WORK PROPOSED UNDER THIS APPLICATION.
S01221325-S4
11/25/2025
Filed — Alteration CO
HEREWITH FILING THE ESTABLISHMENT AND REDUCTION OF AN EXISTING CURB CUT NOT PROVIDED ON EXISTING CERTIFICATE OF OCCUPANCY. NO OTHER WORK PROPOSED UNDER THIS APPLICATION.
S01221325-S1
11/25/2025
Filed — Alteration CO
HEREWITH FILING THE ESTABLISHMENT AND REDUCTION OF AN EXISTING CURB CUT NOT PROVIDED ON EXISTING CERTIFICATE OF OCCUPANCY. NO OTHER WORK PROPOSED UNDER THIS APPLICATION.
S01221325-S3
42 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKarapanjos Construction02/26/2026
DOB NOWConstruction FencePermit IssuedKarapanjos Construction02/13/2026
1 project · most recent 11/25/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
11/25/2025Permit IssuedKarapanjo's ConstructionHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 11/25/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/25/2025——Gas, Water/Sanitary
2 projects · most recent 11/09/2026
General Wiring
FiledStatusContractorScope
11/09/2026Permit IssuedCunningham ElectricGeneral Wiring
04/08/2026Permit IssuedDidonato & Sons Elcl—
1 project · most recent 11/25/2025
Wood
FiledStatusContractorScope
11/25/2025Permit IssuedKarapanjo's ConstructionWood
1 project · most recent 11/25/2025
Fence
FiledStatusContractorScope
11/25/2025Permit IssuedKarapanjo's ConstructionFence
1 project · most recent 11/25/2025
Earthwork
FiledStatusContractorScope
11/25/2025Permit IssuedKarapanjo's ConstructionEarthwork
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
09/05/2025Electric vehicle service equipment requirementsJeffrey Gearyenergy_progress
08/26/2025Air barrier — testing Jeffrey Gearyenergy_progress
07/02/2025Fire-Resistant Penetrations and JointsJeffrey Gearyspecial
07/01/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJeffrey Gearyspecial
06/06/2025Maintenance informationJeffrey Gearyenergy_progress
05/06/2025Raising and Moving of a BuildingJeffrey Gearyspecial
05/06/2025FinalJeffrey Gearyprogress
05/06/2025Footing and FoundationJeffrey Gearyprogress
05/06/2025Energy Code Compliance InspectionsJeffrey Gearyprogress
05/06/2025Fire-Resistance Rated ConstructionJeffrey Gearyprogress
05/06/2025Structural Wood FrameJeffrey Gearyprogress
05/06/2025Fenestration areasJeffrey Gearyenergy_progress
05/06/2025Duct leakage testing, insulation and designJeffrey Gearyenergy_progress
05/06/2025Subgrade InspectionsJeffrey Gearyspecial
05/06/2025HVAC-R and service water heating equipmentJeffrey Gearyenergy_progress
05/06/2025HVAC-R and service water heating system controlsJeffrey Gearyenergy_progress
05/06/2025Fenestration air leakageJeffrey Gearyenergy_progress
05/06/2025Insulation placement and R valuesJeffrey Gearyenergy_progress
05/06/2025HVAC-R and service water piping design and insulationJeffrey Gearyenergy_progress
05/06/2025Fenestration and door U-factor and product ratingsJeffrey Gearyenergy_progress
05/06/2025Interior lighting powerJeffrey Gearyenergy_progress
05/06/2025Fire-Resistant Penetrations and JointsJeffrey Gearyspecial
05/06/2025MeteringJeffrey Gearyenergy_progress
05/06/2025Permanent certificateJeffrey Gearyenergy_progress
05/06/2025Ventilation and air distribution systemJeffrey Gearyenergy_progress
Latest 25 of 28.
35 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account