The Blackstone
3725 HENRY HUDSON PARKWAY · BIN 2085778
💬 Discuss this project
1952Year Built
12Stories
D4Building Class
R7AZoning
116,424 sfGross Floor Area
86Units
LL97 CoveredRent Stabilized1 Active Violation 0 unresolved · 1 paperwork only 2 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: The Blackstone Owners · 37,275 sf lot · 3.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBlackstoneUnder Construction1p · 1 filing · 5 docs
Floor 10Unit 10E, Unit 10F1p · 1 filing · 10 docs
Floor 9
Floor 8
Floor 7
Floor 6Unit 6B, Unit 6C, Unit 6BC11p · 1 filing · 20 docs
Floor 5
Floor 4Unit 4E, Unit 4F, Unit 4F116p · 2 filings · 20 docs
Floor 3
Floor 2
Floor 1Heavy duty sidewalk shed installation9p · 1 filing · 7 docs
CellarBlackstoneUnder Construction11p · 2 filings · 9 docs
Site & exteriorHeavy duty sidewalk shed3p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Blackstone Owners4203/22/2026
Garthchester Realty1203/21/2026
Inspeco103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arquitectura Varela510/27/2026
Stone105/28/2026
Roman S. Mardarewich Architect101/16/2024
Building Studio Architects407/25/2022
Hal Dorfman Architect207/20/2022
A.P. Associates111/09/2020
Haider Engineering, P.E208/14/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting803/21/2026
L & J Design Group803/21/2026
American Gotham Consultants403/21/2026
Sandeep Kaur103/21/2026
SNR Expediting Design403/21/2026
SKY Management Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold903/21/2026
Romo ConstructionScaffold603/21/2026
High End ConstructionGeneral Contractor407/08/2026
Hudson Plumbing and Heating CoPlumbing407/08/2026
Aleks & FGeneral Contractor403/21/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection206/27/2026
S. Tieger Plumbing CoPlumbing107/08/2026
Amsterdam ElectricElectrical103/21/2026
TCR Restoration & Construction*General Contractor107/23/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
Singer Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sanark Consulting Engineering6824210/27/2026
Metric Consulting and Ins1803105/28/2026
A&B World Consulting5704101/16/2024
Building Studio Architect592407/25/2022
Hal Dorfman Architect474107/08/2022
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
10/27/2026
Filed — Alteration
IN APT 6BC REPLACE SINK, REMOVE STOVE AND INSTALL NEW GAS DRYER IN EXISTING KITCHEN BEING CONVERTED TO A LAUNDRY ROOM. REPLACE STOVE, SINK AND INSTALL NEW DISH WASHERS IN EX. KITCHEN.
X01153720-P4
10/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
10/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
REJEP KOLAR
10/20/2026
Special inspection requirement — Lighting in dwelling units
Vicente Varela
281 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedTCR Restoration & Construction*07/22/2026
DOB NOWStandpipePermit IssuedAdvanced Plumbing, Mechanical & Sprinkler06/09/2026
DOB NOWSprinklersPermit IssuedAdvanced Plumbing, Mechanical & Sprinkler06/09/2026
DOB NOWPlumbingPermit IssuedAdvanced Plumbing Mechanical05/05/2026
DOB NOWPlumbingSigned-offHudson Plumbing and Heating Co02/18/2026
DOB NOWGeneral ConstructionPermit IssuedRandy Rose11/05/2025
DOB NOWPlumbingSigned-offHudson Plumbing and Heating Co02/04/2025
DOB NOWGeneral ConstructionPermit IssuedRandy Rose01/21/2025
DOB NOWPlumbingSigned-offHudson Plumbing and Heating Co08/16/2022
DOB NOWMechanical SystemsSigned-offRandy Rose07/15/2022
DOB NOWPlumbingSigned-offS. Tieger Plumbing Co03/24/2022
DOB NOWGeneral ConstructionSigned-offAleks & F01/28/2022
DOB NOWMechanical SystemsSigned-offAleks & F01/28/2022
DOB NOWSidewalk ShedSigned-offRomo Construction03/26/2021
DOB NOWSidewalk ShedSigned-offRomo Construction11/09/2020
DOB NOWSidewalk ShedSigned-offKings Group NY09/23/2020
DOB NOWSidewalk ShedSigned-offKings Group NY09/19/2019
DOB NOWSidewalk ShedSigned-offKings Group NY08/02/2019
BISOTISSUEDRomo Construction03/24/2021
BISOTISSUEDRomo Construction07/17/2020
BISOTISSUEDRomo Construction04/22/2020
BISOTISSUEDRomo Construction04/01/2020
BISOTISSUEDRomo Construction11/25/2019
BISFBISSUEDC C Controlled Combustion10/03/2019
BISOTISSUEDCompound Contracting06/13/2019
BISOTISSUEDVichihel Restoration09/08/2017
BISPLISSUEDWater Dynamic P & H03/31/2016
BISMHISSUEDSuperior Builders II03/25/2016
BISMHISSUEDSuperior Builders II03/03/2016
BISOTISSUEDQuality Building Constrution07/08/2015
BISPLISSUEDVoka Mechanical11/06/2014
BISOTISSUEDAleks & F10/06/2014
BISPLISSUEDJ.A. Mechanical Plumbing & Heating10/03/2014
BISOTISSUEDHigh End Construction03/10/2014
BISOTISSUEDDJM Restoration Onyc02/19/2014
BISEQISSUEDSpring Scaffolding01/02/2014
BISPLISSUEDAqua Blue Plumbing Svces12/17/2013
BISOTISSUEDHigh End Construction12/16/2013
BISOTISSUEDDJM Restoration10/11/2013
BISPLISSUEDJ.A. Mechanical Plumbing & Heating09/18/2013
+ 28 more permits on file
1 project · most recent 01/16/2024
FiledStatusContractorScope
01/16/2024Permit IssuedAdvanced Plumbing, Mechanical & Sprinkler—
2 projects · most recent 10/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/27/2026Signed-offHudson Plumbing and Heating CoGas, Water/Sanitary
01/16/2024Permit IssuedAdvanced Plumbing MechanicalGas
7 projects · most recent 09/18/2026
General Wiring
FiledStatusContractorScope
09/18/2026CompleteRobin Electrical CoGeneral Wiring
09/10/2025CompleteEureka Electric Contng CoGeneral Wiring
12/12/2022CompleteAmsterdam ElectricGeneral Wiring
01/25/2022CompleteLippolis ElectricGeneral Wiring
11/07/2020Permit IssuedRichard Neu—
08/01/2019CompleteRichard Neu—
06/26/2019CompleteFalcon ElectricGeneral Wiring
1 project · most recent 05/28/2026
Concrete
FiledStatusContractorScope
05/28/2026Permit IssuedTCR Restoration & Construction*Concrete
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
02/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/02/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/10/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
10/20/2026Energy Code Compliance InspectionsVicente Varelaprogress
10/20/2026Fire-Resistant Penetrations and JointsREJEP KOLARspecial
10/20/2026Lighting in dwelling unitsVicente Varelaenergy_progress
10/20/2026Interior lighting powerVicente Varelaenergy_progress
06/23/2025FinalEvan Petkanasprogress
06/23/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
06/23/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/13/2024Interior lighting powerVicente Varelaenergy_progress
12/13/2024Lighting in dwelling unitsVicente Varelaenergy_progress
12/13/2024Fire-Resistant Penetrations and JointsREJEP KOLARspecial
12/13/2024Energy Code Compliance InspectionsVicente Varelaprogress
12/10/2024FinalVicente Varelaprogress
01/15/2024Standpipe SystemsAlexander Bomsteinspecial
01/15/2024Tenant Protection Plan ComplianceAlexander Bomsteinspecial
01/15/2024Sprinkler SystemsAlexander Bomsteinspecial
08/02/2022Interior lighting powerMichael Goldblumenergy_progress
08/02/2022Lighting in dwelling unitsMichael Goldblumenergy_progress
08/02/2022Energy Code Compliance InspectionsMichael Goldblumprogress
08/02/2022FinalMichael Goldblumprogress
08/02/2022Mechanical SystemsMichael Goldblumspecial
08/02/2022MeteringMichael Goldblumenergy_progress
07/26/2022Energy Code Compliance InspectionsMichael Goldblumprogress
07/26/2022Fire-Resistant Penetrations and JointsMichael Goldblumspecial
07/06/2022FinalMichael Goldblumprogress
07/06/2022Interior lighting powerMichael Goldblumenergy_progress
Latest 25 of 40.
422 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account