Adult care facility
3726 HENRY HUDSON PKWY E
BRONX · BIN 2084199
💬 Discuss this project
1999Year Built
14Stories
I7Building Class
R7AZoning
120,000 sfGross Floor Area
205Units
LL97 CoveredRent Stabilized13 Open Violations ▸FISP: SAFE
Adult care facility · Owner of record: RIVERDALE DEVELOPMENT, · 14,250 sf lot · 8.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 3 filings · 16 docs
Floor 14Under Construction3p · 1 filing · 3 docs
Floor 13Under Construction3p · 1 filing · 3 docs
Floor 12Under Construction3p · 1 filing · 3 docs
Floor 11Under Construction3p · 1 filing · 3 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar3p · 2 filings · 9 docs
Sub-Cellar3p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY109/13/2026
ROCK GROUP NY607/08/2026
RIVERDALE DEVELOPMENT5603/22/2026
BRENMAC CONSTRUCTION303/22/2026
HENRY HUDSON PKWY BUILDER603/22/2026
VERIZON WIRELESS203/21/2026
ATRIA503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EAST COAST ENGINEERING P C403/21/2026
AE DESIGN SOLUTION203/21/2026
FUTURE TECH CONSULANTS203/21/2026
GREEN STUDIO203/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
WILLIAM DAILEY BUILDING ZONING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VALMATO CONSTRUCTION INCGeneral Contractor603/21/2026
ROCK GROUP NY CORPGeneral Contractor407/08/2026
ALTAIR PLUMBING AND HEATPlumbing207/08/2026
FIREQUEST CORPFire Protection207/08/2026
IRONBO, INCGeneral Contractor203/21/2026
ESSAM HANNAElectrical103/21/2026
KINGS GROUP NY CORPGeneral Contractor109/13/2026
RX ELECTRIC INCElectrical103/22/2026
MELVYN ZWEBNERElectrical103/21/2026
CITILINE RESTORATION LLCGeneral Contractor108/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRAMEWORK ENGINEERING PC8217111/04/2025
URBAN INTEGRATIONS LLC7993111/04/2025
SONI ENGINEERING CONSULTI9819110/28/2025
STRUCTURAL CONSULTING SER1919108/07/2023
JMV CONSULTING ENGINEERIN804105/05/2022
WB ENGINEERING533202/26/2020
FUTURE TECH CONSULTANTS O589210/02/2019
Building Lifecycle
All (120)Filed (10)Permit Issued (12)Signed Off (2)Facade (FISP) (15)Violation (60)Objection (8)Special Inspection (13)
09/11/2026
Permit issued — Sidewalk Shed
X01299153-S1-SH
07/31/2026
Permit issued — General Construction
X01299153-I1-GC
05/08/2026
Violation issued (HPD, open)
A
01/15/2026
Objection resolved — Addressed
01/15/2026
Objection resolved — Addressed
01/15/2026
Objection resolved — Addressed
01/05/2026
Objection raised — Scope
01/05/2026
Objection raised — Cost
01/05/2026
Objection raised — Admin
12/12/2025
Filed — Alteration
X01331036-I1
11/18/2025
Violation issued (HPD, open)
I
11/06/2025
Permit issued — Suspended Scaffold
X01301956-I1-SC
11/04/2025
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
X01299153-I1
10/30/2025
Objection raised — Structural
10/30/2025
Objection resolved — Addressed
10/28/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
X01301956-I1
06/13/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, open)
I
04/17/2024
Violation issued (HPD, open)
A
03/07/2024
Signed off — Alteration
X00913206-I1
11/16/2023
Violation issued (HPD, open)
I
09/18/2023
Permit issued — Antenna
X00913206-I1-AN
08/07/2023
Filed — Alteration
X00913206-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2023
Violation issued (HPD, closed)
A
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2022
Cycle 9 facade report signed — SAFE
05/05/2022
Filed — Alteration
X00571344-I1
03/09/2022
Violation issued (HPD, closed)
I
03/09/2022
Violation issued (HPD, closed)
A
02/18/2022
Cycle 9 facade report submitted
02/15/2022
Cycle 9 facade inspection completed
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2021
Signed off — Alteration
X00271295-I1
08/06/2021
Special inspection requirement — Shutoff dampers
Joseph Vuto
08/06/2021
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Vuto
08/06/2021
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Vuto
08/06/2021
Special inspection requirement — Maintenance information
Joseph Vuto
08/06/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Vuto
08/05/2021
Special inspection requirement — Mechanical Systems
Joseph Vuto
08/05/2021
Special inspection requirement — Final
Joseph Vuto
05/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/20/2021
Violation issued (HPD, closed)
I
04/20/2021
Violation issued (HPD, closed)
A
03/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2020
Violation issued (ECB, closed)
Construction
10/01/2020
Permit issued — Sidewalk Shed
X00271295-I1-SH
07/28/2020
Permit issued — Sprinklers
X00195718-I1-EW-SP
07/28/2020
Permit issued — Plumbing
X00195718-I1-PL
02/26/2020
Filed — Alteration
Sprinkler and plumbing work on the twelve floor.No change to use egress occupancy. Remove 87 sprinkler heads and replace with 105 new sprinkler heads on the 12th floor. There will be 12 temporary sprinkler heads installed.
X00293514-I1
02/26/2020
Filed — Alteration
Mechanical work on the twelve floor. No change to use egress occupancy.
X00293018-I1
01/09/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Bonifacic
01/09/2020
Special inspection requirement — Post-installed Anchors
David Bonifacic
01/08/2020
Special inspection requirement — Sprinkler Systems
David Bonifacic
12/13/2019
Permit issued — Sidewalk Shed
X00271295-I1-SH
12/10/2019
Filed — Alteration
X00271295-I1
12/03/2019
Permit issued — Structural
X00186962-I1-ST
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP09/11/2026
DOB NOWGeneral ConstructionPermit IssuedCITILINE RESTORATION LLC07/31/2026
DOB NOWSuspended ScaffoldPermit IssuedCITILINE RESTORATION LLC11/06/2025
DOB NOWAntennaSigned-offIRONBO09/18/2023
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP10/01/2020
DOB NOWSprinklersPermit IssuedFIREQUEST CORP07/28/2020
DOB NOWPlumbingPermit IssuedALTAIR PLUMBING AND HEAT07/28/2020
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP12/13/2019
DOB NOWStructuralPermit IssuedVALMATO CONSTRUCTION INC12/03/2019
DOB NOWSprinklersPermit IssuedALTAIR PLUMBING AND HEAT11/21/2019
DOB NOWSprinklersPermit IssuedFIREQUEST CORP11/21/2019
DOB NOWStructuralPermit IssuedVALMATO CONSTRUCTION INC11/15/2019
BISOTISSUEDKAY WATERPROOFING CORP09/22/2021
BISOTISSUEDKAY WATERPROOFING CORP01/15/2021
BISOTISSUEDKAY WATERPROOFING CORP02/04/2020
BIS—ISSUEDRENU CONTRACTING & RESTO02/08/2019
BISPLISSUEDAPOLLO PLBG & HTG INC09/19/2018
BISSPISSUEDSTAT FIRE SPRINKLER NYC C05/25/2017
BISSPISSUEDSTAT FIRE SPRINKLER NYC C05/25/2017
BISOTISSUEDRC3 ELECTRIC, LLC01/05/2017
BISOTISSUEDRC3 ELECTRIC, LLC09/29/2016
BISSPISSUEDSTAT FIRE SPRINKLER NYC C05/31/2016
BISSPISSUEDSTAT FIRE SPRINKLER NYC C05/31/2016
BISMHISSUEDRENU CONTRACTING & RESTO06/29/2015
BIS—ISSUEDRENU CONTRACTING & RESTO06/29/2015
BISOTISSUEDRENU CONTRACTING & RESTO06/29/2015
BISSPISSUEDSTAT FIRE SPRINKLER NYC C06/05/2015
BISSPISSUEDSTAT FIRE SPRINKLER NYC C06/05/2015
BISPLISSUEDAPOLLO PLBG & HTG INC08/08/2014
BISSPISSUEDSTAT FIRE SPRINKLER NYC C06/25/2014
BISSPISSUEDSTAT FIRE SPRINKLER NYC C06/25/2014
BISSPISSUEDSTAT FIRE SPRINKLER NYC C06/25/2014
BIS—ISSUEDRENU CONTRACTING & RESTO06/09/2014
BISMHISSUEDRENU CONTRACTING & RESTO05/29/2014
BISOTISSUEDRENU CONTRACTING & RESTO05/29/2014
BISOTISSUEDRC3 ELECTRIC, LLC11/04/2013
BISFPISSUEDRELIABLE FIRE PROT. INC09/09/2013
BISOTISSUEDRC3 ELECTRIC, LLC08/22/2013
BISEQISSUEDBRENMAC CONSTRUCTION INC07/08/2013
BISOTISSUEDKAY WATERPROOFING CORP07/03/2013
+ 22 more permits on file
1 project · most recent 02/26/2020
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/26/2020——Air Conditioning Systems
Cooling
Lg ARUN024GSS4 24,000 BTU · Vrf Outdoor ×2
ARNU-123BHA4 Vrf Indoor ×1
ARNU-243BHA4 Vrf Indoor ×1
1 project · most recent 02/26/2020
FiledStatusContractorScope
02/26/2020———
1 project · most recent 02/26/2020
Water/Sanitary
FiledStatusContractorScope
02/26/2020——Water/Sanitary
4 projects · most recent 08/05/2026
General Wiring
FiledStatusContractorScope
08/05/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
11/25/2019CompleteILLUMINOUS ELECTRIC CORP.—
11/20/2019Permit IssuedCOMMERCE ELECL CONTRG CORGeneral Wiring
03/05/2019CompleteRX ELECTRIC INCGeneral Wiring
1 project · most recent 10/02/2019
Concrete
FiledStatusContractorScope
10/02/2019Permit IssuedVALMATO CONSTRUCTION INCConcrete
1 project · most recent 11/04/2025
Sidewalk Shed
FiledStatusContractorScope
11/04/2025Permit IssuedKINGS GROUP NY CORPSidewalk Shed
1 project · most recent 10/28/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/28/2025Permit IssuedCITILINE RESTORATION LLCSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
08/06/2021Shutoff dampersJoseph Vutoenergy_progress
08/06/2021HVAC-R and service water heating equipmentJoseph Vutoenergy_progress
08/06/2021HVAC-R and service water heating system controlsJoseph Vutoenergy_progress
08/06/2021Maintenance informationJoseph Vutoenergy_progress
08/06/2021HVAC-R and service water piping design and insulationJoseph Vutoenergy_progress
08/05/2021Mechanical SystemsJoseph Vutospecial
08/05/2021FinalJoseph Vutoprogress
01/09/2020Fire-Resistant Penetrations and JointsDavid Bonifacicspecial
01/09/2020Post-installed AnchorsDavid Bonifacicspecial
01/08/2020Sprinkler SystemsDavid Bonifacicspecial
07/01/2019Concrete - Cast-In-PlaceStephen Marchesespecial
07/01/2019Structural Stability – Alterations of existing buildingsStephen Marchesespecial
07/01/2019FinalStephen Marcheseprogress
▾Documents — 494 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch4
08/24/2026X00571344-I1Request digital key ↗
08/22/2026X00913206-I1Request digital key ↗
08/18/2026X01299153-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026X00195718-I1Request digital key ↗
08/26/2026X00293514-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/26/2026X00195718-I1Request digital key ↗
08/26/2026X00293514-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/26/2026X00186962-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00271295-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026X00293018-I1Request digital key ↗
▸Applications & Permits90
▸BISPLAN / WORK APPROVAL APPLICATION49
01/07/2020220685916Open ↗
09/16/2019240262032Open ↗
05/17/2019220359779Open ↗
Showing 3 of 49 on file for this type
▸BISWORK PERMIT APPLICATION31
02/04/2020240262032Open ↗
02/08/2019220359779Open ↗
10/02/2018220355979Open ↗
Showing 3 of 31 on file for this type
▸BISPLACE OF ASSEMBLY3
11/18/2014220355657Open ↗
Showing 1 of 3 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/04/2020240262032Open ↗
01/29/2020240262032Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1132
05/18/2015220355666Open ↗
12/11/2014220289220Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
01/29/2020240262032Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/19/2016220359779Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/02/2019220359779Open ↗
▸BISZONING RESOLUTION DETERMINATION1
09/16/2019220359779Open ↗
▸Seals & Professional Certifications91
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION47
01/07/2020220685916Open ↗
01/07/2020220685916Open ↗
05/02/2019220359779Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/14/2026X01299153-S1Open ↗
08/26/2026X00195718-I1Open ↗
08/26/2026X00271295-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
01/07/2020220685916Open ↗
Showing 1 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
01/07/2020220685916Open ↗
05/20/2014220359779Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026X00186962-I1Open ↗
08/25/2026X00571344-I1Open ↗
08/25/2026X00571344-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026X00293514-I1Open ↗
08/29/2026X00293514-I1Open ↗
08/29/2026X00293514-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/16/2019240262032Open ↗
▸Trade Schedules & Equipment36
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
12/05/2018220355979Open ↗
11/16/2018220355979Open ↗
11/07/2018220355979Open ↗
Showing 3 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
11/24/2015220357904Open ↗
11/24/2015220355666Open ↗
05/27/2015220355979Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
02/22/2019220355979Open ↗
02/22/2019220355979Open ↗
02/22/2019220355979Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
01/10/2017220388159Open ↗
05/13/2016220289220Open ↗
▸BISEQUIPMENT USE PERMITS1
02/22/2019220355979Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes3
01/14/2020220685916Open ↗
08/23/2016220546835Open ↗
09/16/2019240262032Open ↗
▸DOB NOWTenant Protection Plan3
08/13/2026X00271295-I1Open ↗
08/13/2026X00293018-I1Open ↗
08/13/2026X00293514-I1Open ↗
▸BISST-1 Street Tree Checklist1
05/20/2014220359779Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
09/16/2019240262032Open ↗
08/23/2016220546835Open ↗
07/06/2015220466886Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026X00571344-I1Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
05/02/2019220359779Open ↗
08/06/2018220355979Open ↗
10/23/2017220355997Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
06/20/2022240262032Open ↗
05/02/2019220359779Open ↗
08/06/2018220355979Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/20/2022240262032Open ↗
09/16/2019240262032Open ↗
▸Inspections & Test Reports64
▸BISHYDRAULIC FLOW CALCULATIONS60
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 60 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/20/2022240262032Open ↗
09/16/2019240262032Open ↗
▸BISHYDRO FLOW TEST LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs61
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
06/22/2022240262032Open ↗
09/16/2019220359779Open ↗
05/24/2019220359779Open ↗
Showing 3 of 29 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION17
10/29/2019240262032Open ↗
09/16/2019220359779Open ↗
05/02/2019220359779Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
05/21/2019220359779Open ↗
05/17/2019220359779Open ↗
Showing 2 of 4 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMaster Plumber Seal Temporary Approval Letter1
06/28/2014220355666Open ↗
▸BISLETTERS - APPRVD FAB CERT-COMPLIANCE1
09/16/2019220359779Open ↗
▸Cost, Insurance & Ownership41
▸BISCOST AFFIDAVIT41
06/20/2022240262032Open ↗
01/07/2020220685916Open ↗
09/16/2019240262032Open ↗
Showing 3 of 41 on file for this type
▸Filing & Intake Forms45
▸BISEFILING COVER SHEET19
01/07/2020220685916Open ↗
08/23/2016220546835Open ↗
07/06/2015220466886Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM13
05/24/2019220359779Open ↗
05/02/2019220359779Open ↗
02/22/2019220355979Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION12
10/29/2019240262032Open ↗
10/01/2019240262032Open ↗
09/16/2019220359779Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/16/2019240262032Open ↗
▸Other Documents9
▸DOB NOWDHCR Document5
08/13/2026X00195718-I1Open ↗
08/13/2026X00293514-I1Open ↗
08/13/2026X00293018-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPlot Diagram1
06/25/2014220359779Open ↗
▸DOB NOWCalculations1
08/13/2026X01301956-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01301956-I1Open ↗
▸DOB NOWStructural Peer Review Report1
08/13/2026X00186962-I1Open ↗