Two stories - detached, small or mid-size
3728 BRONX BOULEVARD
BRONX · BIN 2057433
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R6AZoning
1,925 sfGross Floor Area
1Units
5 Open Violations 4 unresolved · 1 paperwork only ▸
Two stories - detached, small or mid-size · Owner of record: 3728 BRONX BLVD LLC · 5,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction68p · 1 filing · 20 docs
Floor 6Under Construction68p · 1 filing · 20 docs
Floor 5Under Construction67p · 1 filing · 20 docs
Floor 4Under Construction67p · 1 filing · 20 docs
Floor 3Under Construction67p · 1 filing · 20 docs
Floor 2Under Construction35p · 1 filing · 20 docs
Floor 1Under Construction34p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HENNAN GROUP303/22/2026
3728 BRONX BLVD LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/08/2025$1.2M—Private party → 3728 BRONX BLVD LLC$623/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING,CON803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HENNAN GROUP INCGeneral Contractor808/26/2026
N.B.A CONSTRUCTION INCGeneral Contractor208/07/2026
INFINITI ESC PLUMBING CORPlumbing108/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795709/04/2026
NODE ARCHITECTURE,ENGINEE67991109/04/2026
Building Lifecycle
All (114)Filed (14)Permit Issued (11)Signed Off (1)Violation (12)Inspection (6)Objection (40)Special Inspection (30)
09/04/2026
Filed — New Building
MECHANICAL APPLICATION BEING FILED FOR NEW BUILDING.
X01272686-P2
08/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/14/2026
Permit issued — Structural
X01272686-S9-ST
08/13/2026
Special inspection requirement — Structural Cold-Formed Steel
Radomir Delic
08/13/2026
Special inspection requirement — Concrete - Cast-In-Place
Radomir Delic
08/13/2026
Special inspection requirement — Final
Radomir Delic
08/13/2026
Special inspection requirement — Preliminary
Radomir Delic
08/07/2026
Permit issued — Plumbing
X01272686-Z3-PL
08/06/2026
Permit issued — Sidewalk Shed
X01391402-I1-SH
08/04/2026
Permit issued — Construction Fence
X01265903-I1-FN
07/28/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SAMER ABOU-GHAIDA
07/28/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Radomir Delic
07/28/2026
Special inspection requirement — Footing and Foundation
Radomir Delic
07/28/2026
Special inspection requirement — Final
Radomir Delic
07/28/2026
Special inspection requirement — Preliminary
Radomir Delic
07/28/2026
Special inspection requirement — Concrete - Cast-In-Place
Radomir Delic
07/28/2026
Special inspection requirement — Subgrade Inspections
Radomir Delic
07/28/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MICHAEL KARANTINIDIS, P.E.
07/27/2026
Objection resolved — Resolved
07/26/2026
Violation issued (ECB, closed)
Construction
07/16/2026
Objection raised — Scope
07/15/2026
Permit issued — General Construction
X01272686-I1-GC
07/08/2026
Filed — New Building
MECHANICAL APPLICATION BEING FILED FOR NEW BUILDING.
X01272686-P4
07/08/2026
Violation issued (ECB, open)
Construction
07/08/2026
Violation issued (ECB, open)
Unknown
07/08/2026
Violation issued (ECB, open)
Unknown
07/08/2026
Violation issued (ECB, closed)
Unknown
07/08/2026
Objection resolved — Addressed
07/07/2026
Permit issued — General Construction
X01272686-I1-GC
06/30/2026
Objection raised — Other
06/24/2026
Violation issued (ECB, open)
Construction
06/09/2026
Filed — New Building
MECHANICAL APPLICATION BEING FILED FOR NEW BUILDING.
X01272686-P3
04/29/2026
Violation issued (ECB, open)
Site Safety
04/27/2026
Filed — Alteration
X01391402-I1
04/27/2026
Permit issued — Sidewalk Shed
X01391402-I1-SH
04/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/16/2026
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
04/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
04/16/2026
Special inspection requirement — Shutoff dampers
MICHAEL KARANTINIDIS, P.E.
04/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL KARANTINIDIS, P.E.
04/16/2026
Special inspection requirement — Final
MICHAEL KARANTINIDIS, P.E.
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
04/16/2026
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
04/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
04/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/13/2026
Permit issued — Support of Excavation
X01272686-S2-SE
04/13/2026
Permit issued — Foundation
X01272686-S8-FO
04/11/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/11/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
04/07/2026
Special inspection requirement — Interior lighting power
Radomir Delic
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
04/07/2026
Special inspection requirement — Combustible Exterior Wall Coverings
Radomir Delic
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
04/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
04/07/2026
Special inspection requirement — Metering
Radomir Delic
04/07/2026
Special inspection requirement — Fenestration air leakage
Radomir Delic
04/07/2026
Special inspection requirement — Air barrier - visual inspection
Radomir Delic
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedHENNAN GROUP INC08/14/2026
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR08/07/2026
DOB NOWSidewalk ShedPermit IssuedN.B.A CONSTRUCTION INC08/06/2026
DOB NOWConstruction FencePermit IssuedHENNAN GROUP INC08/04/2026
DOB NOWGeneral ConstructionPermit IssuedHENNAN GROUP INC07/15/2026
DOB NOWGeneral ConstructionPermit IssuedHENNAN GROUP INC07/07/2026
DOB NOWSidewalk ShedPermit IssuedN.B.A CONSTRUCTION INC04/27/2026
DOB NOWSupport of ExcavationPermit IssuedHENNAN GROUP INC04/13/2026
DOB NOWFoundationPermit IssuedHENNAN GROUP INC04/13/2026
DOB NOWFull DemolitionSigned-offHENNAN GROUP10/29/2025
DOB NOWConstruction FencePermit IssuedHENNAN GROUP08/12/2025
BIS—ISSUEDN/A05/10/2005
1 project · most recent 09/04/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
09/04/2026Permit IssuedHENNAN GROUP INCHeating and Air Conditioning Systems
1 project · most recent 09/04/2026
Sprinkler System
FiledStatusContractorScope
09/04/2026——Sprinkler System
1 project · most recent 09/04/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/04/2026Permit IssuedINFINITI ESC PLUMBING CORStorm, Water/Sanitary
2 projects · most recent 08/24/2026
General Wiring
FiledStatusContractorScope
08/24/2026Permit IssuedAUJLA ELECTRIC CORP—
02/02/2026Permit IssuedSOLID STATE ELECTRIC LLCGeneral Wiring
1 project · most recent 09/04/2026
Concrete
FiledStatusContractorScope
09/04/2026Permit IssuedHENNAN GROUP INCConcrete
1 project · most recent 08/06/2025
Fence
FiledStatusContractorScope
08/06/2025Permit IssuedHENNAN GROUP INCFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/20/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/20/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/11/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/11/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
08/13/2026Structural Cold-Formed SteelRadomir Delicspecial
08/13/2026Concrete - Cast-In-PlaceRadomir Delicspecial
08/13/2026FinalRadomir Delicprogress
08/13/2026PreliminaryRadomir Delicprogress
07/28/2026Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
07/28/2026Excavations - Sheeting, Shoring, and BracingRadomir Delicspecial
07/28/2026Footing and FoundationRadomir Delicprogress
07/28/2026FinalRadomir Delicprogress
07/28/2026PreliminaryRadomir Delicprogress
07/28/2026Concrete - Cast-In-PlaceRadomir Delicspecial
07/28/2026Subgrade InspectionsRadomir Delicspecial
07/28/2026Subsurface Conditions – Fill Placement & In-Place DensityMICHAEL KARANTINIDIS, P.E.special
04/16/2026Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
04/16/2026HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
04/16/2026HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
04/16/2026Shutoff dampersMICHAEL KARANTINIDIS, P.E.energy_progress
04/16/2026Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
04/16/2026FinalMICHAEL KARANTINIDIS, P.E.progress
04/16/2026Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
04/16/2026Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
04/16/2026Fire-Resistant Penetrations and JointsRadomir Delicspecial
04/16/2026HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
04/07/2026Interior lighting powerRadomir Delicenergy_progress
04/07/2026Fire-Resistant Penetrations and JointsRadomir Delicspecial
04/07/2026Combustible Exterior Wall CoveringsRadomir Delicspecial
Latest 25 of 59.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/18/2026X01247698-I1Request digital key ↗
08/18/2026X01265903-I1Request digital key ↗
08/16/2026X01391402-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits1
▸DOB NOWHPD - Permit Notice1
08/16/2026X01272686-I1Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWRestrictive Declaration/Easement 111
08/16/2026X01272686-S9Open ↗
08/16/2026X01272686-S8Open ↗
08/16/2026X01272686-S4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026X01272686-P1Open ↗
08/16/2026X01272686-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/16/2026X01272686-P1Open ↗
08/16/2026X01272686-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026X01272686-P1Open ↗
08/16/2026X01272686-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/18/2026X01265903-I1Open ↗
08/16/2026X01391402-I1Open ↗
08/16/2026X01272686-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026X01272686-S9Open ↗
08/26/2026X01272686-Z2Open ↗
08/26/2026X01272686-Z2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026X01272686-S9Open ↗
08/24/2026X01272686-Z3Open ↗
08/24/2026X01272686-Z3Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/25/2026240365207Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026X01247698-I1Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/16/2026X01272686-P1Open ↗
08/16/2026X01272686-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01247698-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01247698-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01247698-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01247698-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/16/2026X01272686-P1Open ↗
08/16/2026X01272686-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/25/2026240365207Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026X01272686-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWOER: Notice to Proceed5
08/16/2026X01272686-S8Open ↗
08/16/2026X01272686-S2Open ↗
08/16/2026X01272686-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWRodent Control1
08/13/2026X01247698-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01247698-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/16/2026X01272686-S8Open ↗
08/15/2026X01272686-P3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026X01272686-S8Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/23/2026240365207Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification3
08/16/2026X01272686-I1Open ↗
08/16/2026X01272686-P1Open ↗
08/13/2026X01247698-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/16/2026X01272686-I1Open ↗
08/16/2026X01272686-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026X01272686-I1Open ↗
08/16/2026X01272686-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/16/2026X01272686-S2Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01247698-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01247698-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01247698-I1Open ↗