← Back
BuildNYC
Four families
373 3RD STREET
BROOKLYN · Park Slope · BIN 3020980
💬 Discuss this project
1920Year Built
3Stories
C3Building Class
R6AZoning
3,200 sfGross Floor Area
4Units
Rent Stabilized6 Active Violations ▸FDNY Report ↗
Four families · Owner of record: 373 PS · 1,800 sf lot · 1.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction29p · 1 filing · 20 docs
BulkheadUnder Construction1p · 1 filing · 20 docs
PenthouseUnder Construction23p · 1 filing · 20 docs
Floor 3Under Construction27p · 2 filings · 20 docs
Floor 2Under Construction26p · 2 filings · 20 docs
Floor 1Under Construction31p · 2 filings · 20 docs
CellarUnder Construction36p · 2 filings · 20 docs
BasementUnder Construction28p · 1 filing · 20 docs
Sub-Basement6p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Minerva1710/13/2026
373 PS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/28/2025$2.9M—Private party → 373 PS LLC$906/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Fabian Cruz PE210/09/2026
World Design Architecture512/31/2025
Ras PE Consulting Engineers311/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Javith Camino703/21/2026
Pine RE Consulting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC Building Solutions CoGeneral Contractor507/08/2026
RRP PlumbingPlumbing109/12/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616112/31/2025
World Design Architecture9323511/24/2025
Abdus Salam C. Engineers484111/21/2025
Building Lifecycle
All (119)Filed (9)Permit Issued (6)Signed Off (3)Violation (22)Inspection (1)Objection (48)Special Inspection (30)
10/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Structural Framing for proposed Vertical and Horizontal enlargement, as per plans.
B01262411-S6
10/08/2026
Violation issued (ECB, open)
Unknown
09/17/2026
Violation issued (ECB, open)
Site Safety
09/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/10/2026
Permit issued — Plumbing
B01262411-S1-PL
09/03/2026
Violation issued (ECB, open)
Construction
09/03/2026
Violation issued (ECB, open)
Construction
08/28/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Structural Framing for proposed Vertical and Horizontal enlargement, as per plans.
B01262411-S3
08/25/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Structural Framing for proposed Vertical and Horizontal enlargement, as per plans.
B01262411-S4
08/25/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Structural Framing for proposed Vertical and Horizontal enlargement, as per plans.
B01262411-S2
08/24/2026
Special inspection requirement — Sprinkler Systems
04/30/2026
Violation issued (HPD, closed)
A
02/09/2026
Violation issued (FDNY_NOV, closed)
02/05/2026
Objection resolved — Addressed
02/04/2026
Permit issued — Support of Excavation
B01262411-S2-SE
02/03/2026
Permit issued — Structural
B01262411-S4-ST
02/03/2026
Permit issued — Earth Work
B01262411-S3-FO-EA
01/24/2026
Permit issued — General Construction
B01262411-I1-GC
01/20/2026
Objection resolved — Addressed
01/12/2026
Objection raised — Energy
12/31/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Structural Framing for proposed Vertical and Horizontal enlargement, as per plans.
B01262411-S1
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/11/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/10/2025
Violation issued (ECB, closed)
Construction
12/10/2025
Violation issued (ECB, closed)
Unknown
12/10/2025
Violation issued (ECB, open)
Construction
12/05/2025
Violation issued (ECB, closed)
Construction
12/04/2025
Objection raised — Structural
12/04/2025
Objection raised — Structural
12/04/2025
Objection raised — Structural
12/04/2025
Objection raised — Structural
12/04/2025
Objection raised — Structural
12/04/2025
Objection raised — Other
12/04/2025
Objection raised — Structural
12/04/2025
Objection raised — Structural
12/04/2025
Objection raised — Structural
12/04/2025
Objection raised — Structural
12/04/2025
Objection raised — Structural
12/04/2025
Objection raised — Admin
12/04/2025
Objection raised — Structural
12/04/2025
Objection raised — Structural
11/24/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Structural Framing for proposed Vertical and Horizontal enlargement, as per plans.
B01262411-S4
11/21/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Structural Framing for proposed Vertical and Horizontal enlargement, as per plans.
B01262411-S3
11/19/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Structural Framing for proposed Vertical and Horizontal enlargement, as per plans.
B01262411-S2
11/13/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Bin Li
11/13/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
William Alicea
11/13/2025
Special inspection requirement — Concrete - Cast-In-Place
William Alicea
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRRP Plumbing09/10/2026
DOB NOWSupport of ExcavationSigned-offNYC Building Solutions Co02/04/2026
DOB NOWStructuralSigned-offNYC Building Solutions Co02/03/2026
DOB NOWEarth WorkSigned-offNYC Building Solutions Co02/03/2026
DOB NOWGeneral ConstructionPermit IssuedNYC Building Solutions Co01/24/2026
DOB NOWGeneral ConstructionPermit IssuedNYC Building Solutions Co07/28/2025
BISOTISSUEDCrown Construction Builders06/28/2000
1 project · most recent 10/09/2026
Sprinkler System
FiledStatusContractorScope
10/09/2026——Sprinkler System
1 project · most recent 10/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/09/2026Permit IssuedRRP PlumbingGas, Storm, Water/Sanitary
2 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedSafeway ConstructionGeneral Wiring
12/19/2025Permit IssuedSafeway Construction—
1 project · most recent 10/09/2026
Steel Wood
FiledStatusContractorScope
10/09/2026Permit IssuedRRP PlumbingSteel, Wood
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
08/24/2026Sprinkler Systems—special
11/13/2025Subsurface Investigations (Borings/Test Pits)Bin Lispecial
11/13/2025Subsurface Investigations (Borings/Test Pits)Bin Lispecial
11/13/2025UnderpinningIDRIS SALAMspecial
11/13/2025Concrete - Cast-In-PlaceWilliam Aliceaspecial
11/13/2025Excavations - Sheeting, Shoring, and BracingWilliam Aliceaspecial
11/05/2025Fire-Resistant Penetrations and Joints—special
11/05/2025HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
11/05/2025Energy Code Compliance Inspections—progress
11/05/2025HVAC-R and service water heating system controlsJEFFREY BELLenergy_progress
11/05/2025Maintenance informationJEFFREY BELLenergy_progress
11/05/2025HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
10/07/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
10/07/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
10/06/2025Footing and FoundationWilliam Aliceaprogress
10/06/2025Structural Steel - DetailsWilliam Aliceaspecial
10/06/2025Structural Cold-Formed SteelWilliam Aliceaspecial
10/06/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
10/06/2025FinalNAVEEN KUMARprogress
10/06/2025FinalNAVEEN KUMARprogress
09/30/2025Exterior lighting powerWilliam Aliceaenergy_progress
07/31/2025Lighting in dwelling unitsWilliam Aliceaenergy_progress
07/28/2025Insulation placement and R valuesWilliam Aliceaenergy_progress
07/28/2025Maintenance informationWilliam Aliceaenergy_progress
07/28/2025Fenestration and door U-factor and product ratingsWilliam Aliceaenergy_progress
Latest 25 of 62.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026B01205632-I1Request digital key ↗
08/21/2026B01250787-I1Request digital key ↗
08/19/2026B01262411-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026B01205632-I1Open ↗
08/13/2026B01262411-I1Open ↗
08/13/2026B01184300-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B01205632-I1Open ↗
08/13/2026B01262411-I1Open ↗
08/13/2026B01184300-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B01205632-I1Open ↗
08/13/2026B01262411-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWSpecial Inspector Seal & Signature10
08/26/2026B01262411-S3Open ↗
08/26/2026B01262411-S3Open ↗
08/26/2026B01262411-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
10/11/2026B01262411-S6Open ↗
08/21/2026B01205632-I1Open ↗
08/19/2026B01262411-S4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/26/2026B01262411-S3Open ↗
08/26/2026B01262411-S3Open ↗
08/26/2026B01262411-S4Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01262411-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01205632-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
10/11/2026B01262411-S6Open ↗
08/19/2026B01262411-S4Open ↗
08/19/2026B01262411-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B01250787-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026B01262411-S2Open ↗
08/13/2026B01262411-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B01262411-S2Open ↗
08/13/2026B01262411-S3Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026B01184300-I1Open ↗
08/13/2026B01262411-I1Open ↗
08/13/2026B01205632-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01262411-S2Open ↗
08/13/2026B01262411-S3Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026B01205632-I1Open ↗
08/19/2026B01262411-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01205632-I1Open ↗
08/13/2026B01262411-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01205632-I1Open ↗
▸DOB NOWWaiver Document1
08/19/2026B01262411-I1Open ↗