Two family frame
373 EAST 157 STREET
BRONX · BIN 2001749
💬 Discuss this project
1899Year Built
3Stories
B2Building Class
R7-2Zoning
4,640 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸
Two family frame · Owner of record: 373 CROSS PARK LLC · 2,493 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof29p · 1 filing · 20 docs
Floor 325p · 1 filing · 20 docs
Floor 227p · 1 filing · 20 docs
Floor 127p · 1 filing · 20 docs
Cellar26p · 1 filing · 20 docs
4 jobs · most recent 11/25/2025
General Wiring
FiledStatusContractorScope
11/25/2025CompleteAG POWER ELECTRIC CORPGeneral Wiring
06/25/2025CompleteFIRST QUALITY ELECL LLC—
02/07/2025CompleteRICHARD NEU—
01/12/2025CompleteFIRST QUALITY ELECL LLCGeneral Wiring
1 job · most recent 09/26/2025
FiledStatusContractorScope
09/26/2025Signed-offREVAMP NYC CORP1 scope_items
Building Lifecycle
All (127)Filed (14)Permit Issued (11)Signed Off (10)Violation (20)Inspection (8)Objection (34)Special Inspection (30)
06/17/2026
Violation issued (HPD, open)
A
01/27/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT CO X01068372-I1.
X01068372-I1
11/19/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT CO X01068372-I1.
X01068372-S8
10/06/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
10/06/2025
Special inspection requirement — Permanent certificate
Shahrish Shuvo
10/06/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Shahrish Shuvo
10/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
10/06/2025
Special inspection requirement — Air barrier — testing
Shahrish Shuvo
10/06/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
10/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
10/06/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
10/06/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
09/26/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT CO X01068372-I1.
X01068372-P5
09/26/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Shahrish Shuvo
09/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
09/26/2025
Special inspection requirement — Air barrier — testing
Shahrish Shuvo
09/26/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
09/26/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
09/26/2025
Special inspection requirement — Permanent certificate
Shahrish Shuvo
09/26/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
09/26/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
09/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
08/21/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT CO X01068372-I1.
X01068372-S5
08/19/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT CO X01068372-I1.
X01068372-S2
07/28/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
07/28/2025
Special inspection requirement — Sprayed fire-resistant materials
FAHAD FATEH
07/28/2025
Special inspection requirement — Air barrier — testing
FAHAD FATEH
07/28/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
07/28/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
07/28/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
07/28/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
07/28/2025
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
07/28/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
07/28/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/28/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
07/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
07/07/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT CO X01068372-I1.
X01068372-P4
06/23/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT CO X01068372-I1.
X01068372-S6
06/18/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT CO X01068372-I1.
X01068372-S3
06/17/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT CO X01068372-I1.
X01068372-S1
06/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/29/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/27/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/22/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT CO X01068372-I1.
X01068372-S7
05/22/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT CO X01068372-I1.
X01068372-S4
05/22/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCC
X01176139-I1
05/14/2025
Permit issued — Mechanical Systems
X01068372-S1-MS
05/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/08/2025
Objection resolved — Addressed
04/25/2025
Permit issued — General Construction
X01068372-I1-GC
04/21/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT CO X01068372-I1.
X01068372-P2
04/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/12/2025
Violation issued (ECB, closed)
Unknown
02/12/2025
Violation issued (ECB, closed)
Construction
02/12/2025
Violation issued (ECB, closed)
Construction
02/12/2025
Violation issued (ECB, closed)
Construction
02/10/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 127 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAPPHIRE INVESTORS4307/08/2026
J G CONSTRUCTION SRVCS503/22/2026
REVAMP NYC503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2024$730K—— → —$157/sf building
05/29/2018$183K—REAL ESTATES ARE US LLC → 357 E 157 LLC$39/sf building
07/28/2017$549K—Private party → REAL ESTATES ARE US LLC$118/sf building
02/27/2015$420K—Private party → Private party$91/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAOBAB ARCHITECTS P.C.1009/26/2025
ASHRAF CORP102/06/2025
VASILIOS ARTEMIOU PE308/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG GROUP USA1203/21/2026
BAC Developers Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REVAMP NYC CORPGeneral Contractor1407/08/2026
U-HAUL METRO OF N.Y.Electrical403/21/2026
ADVANTAGE PLUMBINGElectrical403/21/2026
EMPIRE USED BOILER SUP COElectrical403/21/2026
J & G CONSTRUCTION SVCSGeneral Contractor303/21/2026
AMOK INCPlumbing107/08/2026
FIRST QUALITY ELECL LLCElectrical103/22/2026
MORDECHAI LESINElectrical103/21/2026
AMOK INCFire Protection107/08/2026
ABRAHAM FRIEDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524309/26/2025
HRF SERVICES CORP5616807/07/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offREVAMP NYC CORP05/14/2025
DOB NOWGeneral ConstructionPermit IssuedREVAMP NYC CORP04/25/2025
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS02/07/2025
DOB NOWPlumbingSigned-offAMOK INC01/10/2025
DOB NOWGeneral ConstructionPermit IssuedREVAMP NYC CORP01/09/2025
DOB NOWSprinklersSigned-offAMOK INC01/03/2025
DOB NOWGeneral ConstructionSigned-offREVAMP NYC CORP01/02/2025
DOB NOWSupport of ExcavationSigned-offREVAMP NYC CORP01/02/2025
DOB NOWStructuralPermit IssuedREVAMP NYC CORP01/02/2025
DOB NOWFoundationSigned-offREVAMP NYC CORP01/02/2025
DOB NOWConstruction FenceSigned-offREVAMP NYC CORP12/19/2024
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/09/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
10/06/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
10/06/2025Insulation placement and R valuesShahrish Shuvoenergy_progress
10/06/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
10/06/2025Air barrier - visual inspectionShahrish Shuvoenergy_progress
10/06/2025Fenestration air leakageShahrish Shuvoenergy_progress
10/06/2025Air barrier — testing Shahrish Shuvoenergy_progress
10/06/2025Permanent certificateShahrish Shuvoenergy_progress
10/06/2025Fenestration areasShahrish Shuvoenergy_progress
10/06/2025Excavations - Sheeting, Shoring, and BracingShahrish Shuvospecial
09/26/2025Permanent certificateShahrish Shuvoenergy_progress
09/26/2025Excavations - Sheeting, Shoring, and BracingShahrish Shuvospecial
09/26/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
09/26/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
09/26/2025Air barrier - visual inspectionShahrish Shuvoenergy_progress
09/26/2025Fenestration air leakageShahrish Shuvoenergy_progress
09/26/2025Air barrier — testing Shahrish Shuvoenergy_progress
09/26/2025Fenestration areasShahrish Shuvoenergy_progress
09/26/2025Insulation placement and R valuesShahrish Shuvoenergy_progress
07/28/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
07/28/2025Interior lighting powerFAHAD FATEHenergy_progress
07/28/2025Fenestration air leakageFAHAD FATEHenergy_progress
07/28/2025Lighting controlsFAHAD FATEHenergy_progress
07/28/2025Concrete - Cast-In-PlaceFAHAD FATEHspecial
07/28/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
07/28/2025Seismic Isolation SystemsFAHAD FATEHspecial
Latest 25 of 111.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/21/2026X01068372-S5Request digital key ↗
08/21/2026X01068372-S4Request digital key ↗
08/21/2026X01068372-S3Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/03/2016220553210Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/19/2024240360952Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X01068372-I1Open ↗
08/13/2026X01068372-P2Open ↗
08/13/2026X01068372-P4Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026X01068372-P4Open ↗
08/13/2026X01068372-P2Open ↗
08/13/2026X01068372-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X01068372-P4Open ↗
08/13/2026X01068372-P2Open ↗
08/13/2026X01068372-I1Open ↗
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/21/2026X01068372-S5Open ↗
08/21/2026X01068372-S4Open ↗
08/21/2026X01068372-S3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/29/2026X01068372-P2Open ↗
09/29/2026X01068372-P2Open ↗
09/29/2026X01068372-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/29/2026X01068372-P2Open ↗
09/25/2026X01068372-I1Open ↗
09/01/2026X01068372-S6Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/11/2024240360952Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/03/2016220553210Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X01068372-P4Open ↗
08/13/2026X01068372-P2Open ↗
08/13/2026X01068372-I1Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST3
12/17/2024240360952Open ↗
12/11/2024240360952Open ↗
10/03/2016220553210Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/17/2024240360952Open ↗
▸BISSTREET TREE SIGNOFF1
09/21/2025240360952Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X01068372-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X01068372-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01068372-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/21/2026X01068372-S5Open ↗
08/21/2026X01068372-S4Open ↗
08/21/2026X01068372-S3Open ↗
Showing 3 of 13 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/03/2016220553210Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
10/03/2016220553210Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
12/11/2024240360952Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/11/2024240360952Open ↗
▸BISEFILING COVER SHEET1
10/03/2016220553210Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial5
08/13/2026X01068372-P5Open ↗
08/13/2026X01068372-P2Open ↗
08/13/2026X01068372-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026X01068372-P4Open ↗
08/13/2026X01068372-P5Open ↗
08/13/2026X01068372-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification3
08/21/2026X01068372-P4Open ↗
08/21/2026X01068372-P2Open ↗
08/21/2026X01068372-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
07/10/2025240360952Open ↗
12/11/2024240360952Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X01068372-S5Open ↗
08/13/2026X01068372-S7Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
12/17/2024240360952Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/17/2024240360952Open ↗
▸BISPLOT DIAGRAM1
10/03/2016220553210Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01068372-I1Open ↗