← Back
BuildNYC
Elevator apt, miscellaneous
Grower-Green
373 SOUTH 2ND STREET · BIN 3063046
💬 Discuss this project
1920Year Built
6Stories
D9Building Class
R6Zoning
19,900 sfGross Floor Area
22Units
Rent Stabilized0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Elevator apt, miscellaneous · Owner of record: Grower-Green Housing Development Fund Co Rporation · 4,800 sf lot · 4.15 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 6Facade repair, pointing, stucco and stone3p · 1 filing · 3 docs
Floor 5Facade repair, pointing, stucco and stone3p · 1 filing · 3 docs
Floor 4Facade repair, pointing, stucco and stone3p · 1 filing · 3 docs
Floor 3Facade repair, pointing, stucco and stone3p · 1 filing · 3 docs
Floor 2Facade repair, pointing, stucco and stone3p · 1 filing · 3 docs
Floor 1Facade repair, pointing, stucco and stone3p · 1 filing · 3 docs
Site & exteriorRepair closet walls under front stoop5p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Grower-Green Housing Development Fund Co Rporation203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bangash Associates111/07/2024
Arquitectura Varela203/30/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New City BridgingScaffold303/21/2026
Kraus Restorationspecialty_contractor107/08/2026
R & S ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bangash Associates8488111/07/2024
Butterfield & O'Connor4189103/30/2022
Building Lifecycle
All (71)Filed (3)Permit Issued (3)Signed Off (1)Violation (60)Special Inspection (4)
04/30/2025
Violation issued (HPD, closed)
C
04/30/2025
Violation issued (HPD, closed)
B
04/30/2025
Violation issued (HPD, closed)
B
04/30/2025
Violation issued (HPD, closed)
B
04/30/2025
Violation issued (HPD, closed)
B
04/30/2025
Violation issued (HPD, closed)
B
04/30/2025
Violation issued (HPD, closed)
A
04/30/2025
Violation issued (HPD, closed)
B
04/30/2025
Violation issued (HPD, closed)
A
04/30/2025
Violation issued (HPD, closed)
A
04/30/2025
Violation issued (HPD, closed)
C
04/30/2025
Violation issued (HPD, closed)
B
04/30/2025
Violation issued (HPD, closed)
C
12/11/2024
Signed off — Alteration
REPAIR UTILITY CLOSET WALLS UNDER FRONT STOOP INCLUDING BEAM AND BRICKS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01138807-I1
11/13/2024
Permit issued — General Construction
B01138807-I1-GC
11/07/2024
Filed — Alteration
REPAIR UTILITY CLOSET WALLS UNDER FRONT STOOP INCLUDING BEAM AND BRICKS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01138807-I1
11/07/2024
Special inspection requirement — Masonry
FAZAL BANGASH
11/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAZAL BANGASH
11/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
11/07/2024
Special inspection requirement — Final
FAZAL BANGASH
08/29/2024
Violation issued (HPD, closed)
C
11/17/2023
Violation issued (HPD, closed)
I
07/18/2023
Violation issued (HPD, closed)
C
07/18/2023
Violation issued (HPD, closed)
C
07/18/2023
Violation issued (HPD, closed)
B
07/18/2023
Violation issued (HPD, closed)
A
07/18/2023
Violation issued (HPD, closed)
C
07/18/2023
Violation issued (HPD, closed)
B
07/18/2023
Violation issued (HPD, closed)
C
07/18/2023
Violation issued (HPD, closed)
C
07/18/2023
Violation issued (HPD, closed)
B
07/18/2023
Violation issued (HPD, closed)
A
07/18/2023
Violation issued (HPD, closed)
C
07/18/2023
Violation issued (HPD, closed)
A
07/18/2023
Violation issued (HPD, closed)
C
07/18/2023
Violation issued (HPD, closed)
C
07/18/2023
Violation issued (HPD, closed)
A
07/18/2023
Violation issued (HPD, closed)
A
07/18/2023
Violation issued (HPD, closed)
A
07/18/2023
Violation issued (HPD, closed)
A
07/18/2023
Violation issued (HPD, closed)
A
07/18/2023
Violation issued (HPD, closed)
A
07/18/2023
Violation issued (HPD, closed)
B
03/20/2023
Violation issued (HPD, closed)
A
03/20/2023
Violation issued (HPD, closed)
B
02/17/2023
Violation issued (HPD, closed)
B
02/17/2023
Violation issued (HPD, closed)
B
02/17/2023
Violation issued (HPD, closed)
B
02/17/2023
Violation issued (HPD, closed)
B
02/17/2023
Violation issued (HPD, closed)
C
05/20/2022
Violation issued (HPD, closed)
C
04/06/2022
Permit issued — General Construction
B00708842-I1-GC
03/30/2022
Filed — Alteration
POINTING, INSTALLATION OF STUCCO & STONE REPAIR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION.
B00708842-I1
03/28/2022
Violation issued (ECB, closed)
Elevators
03/24/2022
Permit issued — Sidewalk Shed
B00705172-I1-SH
03/23/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
B00705172-I1
06/17/2021
Violation issued (HPD, closed)
A
06/17/2021
Violation issued (HPD, closed)
B
06/17/2021
Violation issued (HPD, closed)
B
06/17/2021
Violation issued (HPD, closed)
A
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKraus Restoration11/13/2024
DOB NOWGeneral ConstructionPermit IssuedR & S Construction04/06/2022
DOB NOWSidewalk ShedPermit IssuedNew City Bridging03/24/2022
1 project · most recent 04/21/2022
FiledStatusContractorScope
04/21/2022CompleteCaputek Electrical Services—
1 project · most recent 03/23/2022
Sidewalk Shed
FiledStatusContractorScope
03/23/2022Permit IssuedNew City BridgingSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/07/2024MasonryFAZAL BANGASHspecial
11/07/2024Structural Stability – Alterations of existing buildingsFAZAL BANGASHspecial
11/07/2024Tenant Protection Plan ComplianceFAZAL BANGASHspecial
11/07/2024FinalFAZAL BANGASHprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/30/2026B00705172-I1Request digital key ↗
08/30/2026B00708842-I1Request digital key ↗
08/23/2026B01138807-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/30/2026B00705172-I1Open ↗
08/13/2026B00708842-I1Open ↗
08/13/2026B01138807-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B01138807-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B01138807-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026B00705172-I1Open ↗
08/13/2026B00708842-I1Open ↗