← Back
Over six families without stores
374 8 STREET
BROOKLYN · BIN 3022154
💬 Discuss this project
1905Year Built
4Stories
C1Building Class
R6BZoning
10,580 sfGross Floor Area
16Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: LIVROS LLC · 3,000 sf lot · 3.53 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Cellar1p · 1 filing · 20 docs
1 job · most recent 07/24/2024
FiledStatusContractorScope
07/24/2024——1 heads
1 job · most recent 07/24/2024
Gas Plumbing-Sprinkler
FiledStatusContractorScope
07/24/2024Signed-offAURORA P & H CONT INCGas, Plumbing-Sprinkler
Building Lifecycle
All (73)Filed (10)Permit Issued (3)Signed Off (2)Violation (10)Inspection (4)Objection (14)Special Inspection (30)
03/13/2025
Signed off — Alteration
PAA being filed to correct Max. Allowable Pressure to 80 psi. There is no change to the last Approved Drawing
B00841660-S1
02/18/2025
Signed off — Alteration
PAA being filed to correct Max. Allowable Pressure to 80 psi. There is no change to the last Approved Drawing
B00841660-I1
01/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/06/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
CONNIE PISANI
07/29/2024
Special inspection requirement — Maintenance information
CONNIE PISANI
07/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
CONNIE PISANI
07/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CONNIE PISANI
07/29/2024
Special inspection requirement — Permanent certificate
CONNIE PISANI
07/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
CONNIE PISANI
07/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Takos
07/29/2024
Special inspection requirement — Heating Systems
Anthony Takos
07/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/29/2024
Special inspection requirement — Permanent certificate
Anthony Takos
07/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Takos
07/29/2024
Special inspection requirement — Maintenance information
Anthony Takos
07/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Takos
07/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Takos
07/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
07/29/2024
Special inspection requirement — Heating Systems
CONNIE PISANI
07/24/2024
Filed — Alteration
PAA being filed to correct Max. Allowable Pressure to 80 psi. There is no change to the last Approved Drawing
B00841660-P7
07/24/2024
Filed — Alteration
PAA being filed to correct Max. Allowable Pressure to 80 psi. There is no change to the last Approved Drawing
B00841660-P6
07/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Takos
07/24/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/24/2024
Special inspection requirement — Heating Systems
Anthony Takos
07/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
07/24/2024
Special inspection requirement — Maintenance information
07/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
07/24/2024
Special inspection requirement — Permanent certificate
07/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
07/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Takos
07/24/2024
Special inspection requirement — Heating Systems
Anthony Takos
07/24/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/24/2024
Special inspection requirement — Permanent certificate
Anthony Takos
07/24/2024
Special inspection requirement — Maintenance information
Anthony Takos
07/08/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
06/21/2024
Objection raised — Scope
06/18/2024
Objection raised — Scope
06/14/2024
Filed — Alteration
PAA being filed to correct Max. Allowable Pressure to 80 psi. There is no change to the last Approved Drawing
B00841660-P5
06/14/2024
Filed — Alteration
PAA being filed to correct Max. Allowable Pressure to 80 psi. There is no change to the last Approved Drawing
B00841660-P4
05/16/2024
Permit issued — Boiler Equipment
B00841660-S3-BE
05/02/2024
Objection resolved — Addressed
04/26/2024
Objection resolved — Addressed
04/26/2024
Objection resolved — Addressed
04/20/2024
Objection resolved — Addressed
04/18/2024
Objection raised — Mechanical
04/18/2024
Objection raised — Structural
04/18/2024
Objection raised — Scope
04/18/2024
Objection raised — Scope
04/17/2024
Filed — Alteration
PAA being filed to correct Max. Allowable Pressure to 80 psi. There is no change to the last Approved Drawing
B00841660-S3
04/17/2024
Filed — Alteration
PAA being filed to correct Max. Allowable Pressure to 80 psi. There is no change to the last Approved Drawing
B00841660-P3
02/02/2024
Permit issued — Boiler Equipment
B00841660-S1-BE
01/02/2024
Filed — Alteration
PAA being filed to correct Max. Allowable Pressure to 80 psi. There is no change to the last Approved Drawing
B00841660-S1
11/10/2023
Filed — Alteration
PAA being filed to correct Max. Allowable Pressure to 80 psi. There is no change to the last Approved Drawing
B00841660-P2
10/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/09/2023
Filed — Alteration
PAA being filed to correct Max. Allowable Pressure to 80 psi. There is no change to the last Approved Drawing
B00841660-P1
06/30/2023
Permit issued — Plumbing
B00841660-I1-PL
Latest 60 of 73 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIDELITY CONSTRUCTION2507/08/2026
LIVROS LLC103/22/2026
LIBROS LLC303/22/2026
LIVBROS1103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANTHONY T. TAKOS, ARCHITECT807/24/2024
PRAINITO ARCHITECT P.C.201/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NH EXPEDITING AND CONSULTING LLC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AURORA P & H CONT INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANTHONY T. TAKOS, ARCHITE643607/24/2024
AMARACON TESTING & INSPEC5842101/02/2024
H2 CONSULTING PE PC835103/10/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAURORA P & H CONT INC05/16/2024
DOB NOWBoiler EquipmentSigned-offAURORA P & H CONT INC02/02/2024
DOB NOWPlumbingSigned-offAURORA P & H CONT INC06/30/2023
BISOTISSUEDFIDELITY CONSTRUCTION CORP05/04/2004
BISPLISSUEDCOLBREN PLBG & HTG INC07/25/2002
BISOTISSUEDFIDELITY CONSTRUCTION CORP05/30/2002
BIS—ISSUEDFIDELITY CONSTRUCTION CORP05/23/2002
BISFBISSUEDJACK PICCINI, INC06/22/2001
BISPLISSUEDCOLBREN PLBG & HTG INC06/20/2001
BISOTISSUEDFIDELITY CONSTRUCTION CORP06/08/2001
BISOTISSUEDFIDELITY CONSTRUCTION CORP.10/20/1995
BISPLISSUEDMACKLER PLUMBING & HEATING CO01/15/1993
BIS—ISSUEDN/A11/23/1992
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/06/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
07/29/2024Tenant Protection Plan ComplianceCONNIE PISANIspecial
07/29/2024Maintenance informationCONNIE PISANIenergy_progress
07/29/2024HVAC-R and service water heating system controlsCONNIE PISANIenergy_progress
07/29/2024HVAC-R and service water piping design and insulationCONNIE PISANIenergy_progress
07/29/2024Permanent certificateCONNIE PISANIenergy_progress
07/29/2024HVAC-R and service water heating equipmentCONNIE PISANIenergy_progress
07/29/2024Fire-Resistant Penetrations and JointsAnthony Takosspecial
07/29/2024Heating SystemsAnthony Takosspecial
07/29/2024Tenant Protection Plan Compliance—special
07/29/2024Permanent certificateAnthony Takosenergy_progress
07/29/2024HVAC-R and service water piping design and insulationAnthony Takosenergy_progress
07/29/2024Maintenance informationAnthony Takosenergy_progress
07/29/2024HVAC-R and service water heating equipmentAnthony Takosenergy_progress
07/29/2024HVAC-R and service water heating system controlsAnthony Takosenergy_progress
07/29/2024Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
07/29/2024Heating SystemsCONNIE PISANIspecial
07/24/2024HVAC-R and service water piping design and insulationAnthony Takosenergy_progress
07/24/2024Tenant Protection Plan Compliance—special
07/24/2024Fire-Resistant Penetrations and Joints—special
07/24/2024Heating SystemsAnthony Takosspecial
07/24/2024HVAC-R and service water piping design and insulation—energy_progress
07/24/2024Maintenance information—energy_progress
07/24/2024HVAC-R and service water heating equipment—energy_progress
07/24/2024Permanent certificate—energy_progress
07/24/2024HVAC-R and service water heating system controls—energy_progress
Latest 25 of 55.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026B00841660-P5Request digital key ↗
08/26/2026B00841660-P7Request digital key ↗
08/26/2026B00841660-P6Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
03/31/2015321096292Open ↗
06/22/2010320177009Open ↗
▸BISWORK PERMIT APPLICATION1
07/13/2010320177009Open ↗
▸Seals & Professional Certifications48
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026B00841660-S3Open ↗
09/23/2026B00841660-S3Open ↗
09/23/2026B00841660-S1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026B00841660-S3Open ↗
09/23/2026B00841660-S3Open ↗
09/23/2026B00841660-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00841660-P5Open ↗
08/26/2026B00841660-P4Open ↗
08/26/2026B00841660-S3Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/31/2015321096292Open ↗
05/23/2011320177009Open ↗
06/22/2010320177009Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/31/2015321096292Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/31/2015321096292Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/22/2010320177009Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026B00841660-P5Open ↗
08/26/2026B00841660-S3Open ↗
08/26/2026B00841660-P3Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/22/2010320177009Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/31/2015321096292Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/31/2015321096292Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
03/31/2015321096292Open ↗
06/22/2010320177009Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/23/2011320177009Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/31/2015321096292Open ↗
05/23/2011320177009Open ↗
06/22/2010320177009Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
03/31/2015321096292Open ↗
06/22/2010320177009Open ↗
▸DOB NOWAI1 Form1
08/13/2026B00841660-S1Open ↗
▸Other Documents1
▸DOB NOWWaiver Document1
08/13/2026B00841660-I1Open ↗