374 SOUTH 2 STREET
BROOKLYN · Williamsburg · BIN 3063196
💬 Discuss this project
1924Year Built
6Stories
C6Building Class
R6Zoning
31,686 sfGross Floor Area
41Units
LL97 CoveredRent Stabilized45 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 374-76 SOUTH 2ND STREET HOUSING DEVELOPM ENT FUND · 7,500 sf lot · 4.22 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 6 docs
Floor 49p · 1 filing · 10 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FINGER MANAGEMENT1407/08/2026
ROCK GROUP NY CORP503/22/2026
TRIERA CONTRACTING INC503/22/2026
374-76 SOUTH 2ND STREET HOUSING DEVELOPM ENT FUND503/22/2026
374 S. 2 ST103/22/2026
INTERSYSTEM INSTALLATION CORP203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP311/03/2023
CREO DESIGN COLLECTIVE, INC.302/13/2023
EMPIRE DESIGN CORP111/02/2021
NEW YORK ENGINEERING ASSOC., P.C.306/18/2021
ASIF JAMIL, RA109/10/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC203/21/2026
NEW YORK ENGINEERING303/21/2026
GREEN STUDIO203/21/2026
NORTHEAST EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & J CONTRACTORS CO INCGeneral Contractor303/21/2026
ROCK GROUP NY CORPGeneral Contractor303/21/2026
TRIERA CONTRACTING INCGeneral Contractor303/21/2026
NEW WAVE DESIGN & CONTRACTINGGeneral Contractor207/08/2026
ARISTA PLBG & HTG CORPPlumbing207/08/2026
BELL FUEL OIL, LLCPlumbing107/08/2026
APPROVED OIL CO BROOKLYNGeneral Contractor107/08/2026
INTERSYSTEM INSTALLATIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC5842302/13/2023
EMPIRE DESIGN CORP5474111/02/2021
NEW YORK ENGINEERING ASSO851306/18/2021
Building Lifecycle
All (119)Filed (11)Permit Issued (11)Signed Off (6)Violation (60)Inspection (9)Objection (18)Special Inspection (4)
07/21/2025
Violation issued (HPD, open)
A
06/10/2025
Violation issued (HPD, closed)
A
11/26/2024
Violation issued (HPD, closed)
I
10/10/2024
Violation issued (HPD, open)
B
06/13/2024
Violation issued (HPD, closed)
C
03/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/08/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/20/2023
Permit issued — Supported Scaffold
B00956931-I1-SF
11/16/2023
Objection resolved — Addressed
11/16/2023
Objection resolved — Addressed
11/16/2023
Objection resolved — Addressed
11/16/2023
Objection resolved — Addressed
11/16/2023
Objection resolved — Addressed
11/16/2023
Objection resolved — Addressed
11/15/2023
Objection raised — Structural
11/08/2023
Objection raised — Fire_Protection
11/08/2023
Objection raised — Inspections
11/08/2023
Objection raised — Admin
11/08/2023
Objection raised — Other
11/08/2023
Objection raised — Fire_Protection
11/03/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00956931-I1
11/03/2023
Violation issued (HPD, closed)
C
09/19/2023
Violation issued (HPD, closed)
B
09/18/2023
Signed off — Alteration
B00760117-I1
09/16/2023
Violation issued (HPD, open)
C
09/16/2023
Violation issued (HPD, closed)
C
09/16/2023
Violation issued (HPD, open)
C
09/16/2023
Violation issued (HPD, open)
A
05/08/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2023
Objection resolved — Addressed
04/14/2023
Objection raised — Other
04/14/2023
Objection resolved — Addressed
04/07/2023
Permit issued — General Construction
B00760117-I1-GC
03/29/2023
Permit issued — Plumbing
B00764022-I1-PL
03/28/2023
Signed off — Alteration
B00511114-I1
03/28/2023
Signed off — Alteration
B00508102-I1
03/28/2023
Signed off — Alteration
B00508572-I1
02/23/2023
Objection resolved — Addressed
02/20/2023
Objection raised — Admin
02/20/2023
Objection raised — Scope
02/13/2023
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH RENOVATION IN EXISTING UNIT 21 ON THE FORTH FLOOR. RELOCATING PLUMBING FIXTURES, (1) TOILET, (2) SINKS, (1) DISHWASHER, (1) WASHER, AND CAP EXISTING GAS LINE. ADDITION OF (1) TOILET AND (1) SINK.
B00764022-P1
02/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
02/07/2023
Violation issued (ECB, closed)
Construction
01/24/2023
Permit issued — Plumbing
B00764022-I1-PL
01/21/2023
Signed off — Alteration
B00072102-I1
12/13/2022
Permit issued — General Construction
B00760117-I1-GC
11/14/2022
Signed off — Alteration
Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00621456-I1
08/16/2022
Filed — Alteration
Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00621456-P1
08/04/2022
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH RENOVATION IN EXISTING UNIT 21 ON THE FORTH FLOOR. RELOCATING PLUMBING FIXTURES, (1) TOILET, (2) SINKS, (1) DISHWASHER, (1) WASHER, AND CAP EXISTING GAS LINE. ADDITION OF (1) TOILET AND (1) SINK.
B00764022-I1
06/30/2022
Filed — Alteration
B00760117-I1
02/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/04/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/17/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/16/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/09/2021
Permit issued — General Construction
B00623137-I1-GC
11/02/2021
Filed — Alteration
APPLICATION FILE TO REPAIR EXISTING BUILDING FACADE AS SHOWN ON THE DRAWINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00623137-I1
11/02/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Md Rashid
11/02/2021
Special inspection requirement — Final
Md Rashid
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedTRIERA CONTRACTING INC11/20/2023
DOB NOWGeneral ConstructionSigned-offNEW WAVE DESIGN & CONTRAC04/07/2023
DOB NOWPlumbingPermit IssuedARISTA PLBG & HTG CORP03/29/2023
DOB NOWPlumbingPermit IssuedARISTA PLBG & HTG CORP01/24/2023
DOB NOWGeneral ConstructionSigned-offNEW WAVE DESIGN & CONTRAC12/13/2022
DOB NOWGeneral ConstructionPermit IssuedA & J CONTRACTORS CO INC11/09/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION11/01/2021
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO OF BKLYN06/25/2021
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC06/25/2021
DOB NOWMechanical SystemsSigned-offAPPROVED OIL CO BROOKLYN06/25/2021
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP09/11/2018
1 project · most recent 02/13/2023
Gas Water/Sanitary
FiledStatusContractorScope
02/13/2023Permit IssuedARISTA PLBG & HTG CORPGas, Water/Sanitary
8 projects · most recent 02/10/2025
General Wiring Boiler Controls
FiledStatusContractorScope
02/10/2025CompleteNETWORK ONE ELECL CONTNGGeneral Wiring
02/09/2023CompletePK ELECTRIC INCGeneral Wiring
08/07/2022CompleteSTEVEN FARKAS—
10/31/2021CompleteSTEVEN FARKAS—
05/26/2021CompleteDEMAND ELECTRIC INC—
05/26/2021CompleteDEMAND ELECTRIC INCBoiler Controls
11/14/2020CompleteRM ELECTRIC CO., INC.General Wiring
08/17/2018CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 11/03/2023
Scaffold
FiledStatusContractorScope
11/03/2023Permit IssuedTRIERA CONTRACTING INCScaffold
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/04/2022Pass-Final Boiler Equipment InspectionPassView ↗
11/17/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/16/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
02/11/2023Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
11/02/2021Structural Stability – Alterations of existing buildingsMd Rashidspecial
11/02/2021FinalMd Rashidprogress
11/02/2021Air barrier - visual inspectionMd Rashidenergy_progress
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/02/2026B00072102-I1Request digital key ↗
09/01/2026B00508102-I1Request digital key ↗
09/01/2026B00508572-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/14/2008310185224Open ↗
▸BISWORK PERMIT APPLICATION1
08/14/2008310185224Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026B00072102-I1Open ↗
09/01/2026B00508102-I1Open ↗
09/01/2026B00508572-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B00764022-P1Open ↗
08/22/2026B00623137-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026B00623137-I1Open ↗
08/22/2026B00623137-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/14/2008310185224Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/14/2008310185224Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/14/2008310185224Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026B00508102-I1Open ↗
09/01/2026B00508572-I1Open ↗
09/01/2026B00511114-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/14/2008310185224Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00508572-I1Open ↗
08/13/2026B00760117-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00508572-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
08/14/2008310185224Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/14/2008310185224Open ↗