← Back
BuildNYC
Elevator apt, semi-fireproof without stores
The Riverdale Tower
3745 RIVERDALE AVENUE · BIN 2127885
💬 Discuss this project
2022Year Built
18Stories
D1Building Class
R6Zoning
79,474 sfGross Floor Area
89Units
LL97 CoveredRent Stabilized2 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 3745 Riverdale Avenue · 20,383 sf lot · 3.9 FAR built · Flood zone X
Locations of Work
StructuralMechanicalFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsTemporary standpipe for new building3 filings
RoofHeavy duty sidewalk shed installation1 filing · 9 docs
Site & exteriorSTAGG GROUP temporary fence installation2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RYTY Home Builders4907/08/2026
3745 Riverdale Avenue2203/22/2026
Riverdale Realty Development903/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/25/2022$6.0M—RIVERDALE REALTY DEVELOPMENT LLC → 3745 RIVERDALE AVENUE LLC$76/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joselow & Associates505/03/2024
Paul G. Jones, P.E.209/25/2023
Patuxent Engineering508/03/2023
Newman Design Architects212/15/2022
Syed Engineering310/14/2022
Marin Architects206/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Canas Solutions203/21/2026
Miele Solutions603/21/2026
Patuxent Engineering1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consolidated ScaffoldingScaffold807/08/2026
Apex Fire ProtectionFire Protection607/08/2026
Be Bronx BuildersScaffold507/08/2026
Ariana ContractingFire Protection407/08/2026
Advanced Scaffold ServicesScaffold407/08/2026
Miller Plumbing & HeatingPlumbing207/08/2026
The Right Connection P&HFire Protection107/08/2026
V. Vass ElectricElectrical103/22/2026
Solas ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Dominick R. Pilla1300405/03/2024
Building Lifecycle
03/19/2026
Elevator Category 1 inspection report filed
02/24/2025
Signed off — Alteration
Installation of a 8'high construction fence in conjunction with new building job #220514799.
X00746417-I1
12/10/2024
Closed: Add'l info,job#220514799=proposed 18 stry,residential concrete cast-in -place.struct.chaptr 17-bldg code req conc specimens to be collected & lab…
DOB violation · closed on the city's record
12/09/2024
Signed off — Alteration
Temporary standpipe filing in conjunction with construction of New Building Job #220514799.
X00658320-I1
12/09/2024
Signed off — Alteration
Sprinkler/Standpipe work in conjunction with New Building Job #220514799.
X00794359-I1
113 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offAriana Contracting11/07/2024
DOB NOWStandpipeSigned-offAriana Contracting11/07/2024
DOB NOWSprinklersSigned-offAriana Contracting11/06/2024
DOB NOWConstruction FenceSigned-offBe Bronx Builders05/22/2024
DOB NOWStandpipeSigned-offApex Fire Protection09/21/2023
DOB NOWStandpipeSigned-offApex Fire Protection09/21/2023
DOB NOWSprinklersSigned-offApex Fire Protection09/21/2023
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding09/20/2023
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding07/21/2023
DOB NOWConstruction FenceSigned-offBe Bronx Builders05/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offAdvanced Scaffold Services03/31/2023
DOB NOWProtection and Mechanical MethodsSigned-offAdvanced Scaffold Services03/07/2023
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding02/01/2023
DOB NOWStandpipeSigned-offApex Fire Protection11/07/2022
DOB NOWStandpipeSigned-offApex Fire Protection11/07/2022
DOB NOWSprinklersSigned-offApex Fire Protection11/07/2022
DOB NOWStandpipeSigned-offMiller Plumbing & Heating10/05/2022
DOB NOWStandpipeSigned-offMiller Plumbing & Heating07/30/2022
DOB NOWConstruction FenceSigned-offBe Bronx Builders05/28/2022
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding02/22/2022
DOB NOWStandpipeSigned-offAriana Contracting02/02/2022
DOB NOWStandpipeSigned-offMax P & H01/28/2022
BISEQISSUEDBe Bronx Builders05/22/2024
BIS—ISSUEDBe Bronx Builders05/22/2024
BISEQISSUEDBe Bronx Builders03/11/2024
BISPLISSUEDJunior Carter Mechanical02/07/2024
BIS—ISSUEDBe Bronx Builders02/02/2024
BISEQISSUEDBe Bronx Builders02/01/2024
BISEQISSUEDConsolidated Scaffolding07/20/2023
BIS—ISSUEDBe Bronx Builders05/15/2023
BISEQISSUEDBe Bronx Builders03/31/2023
BISEQISSUEDBe Bronx Builders02/07/2023
BIS—ISSUEDBe Bronx Builders12/29/2022
BISPLISSUEDJunior Carter Mechanical12/09/2022
BISPLISSUEDMiller Plumbing & Heating09/02/2022
BISEQISSUEDConsolidated Scaffolding07/25/2022
BIS—ISSUEDBe Bronx Builders06/02/2022
BIS—ISSUEDBe Bronx Builders06/02/2022
BIS—ISSUEDBe Bronx Builders06/02/2022
BISPLISSUEDJunior Carter Mechanical05/31/2022
+ 32 more permits on file
1 project
Generators
FiledStatusContractorScope
———Generators
8 projects · most recent 10/19/2026
General Wiring
FiledStatusContractorScope
10/19/2026Permit IssuedJay Spark ElectricalGeneral Wiring
10/22/2024CompleteAL Electrical Group—
07/30/2024CompleteEmpire State Electric MaintenanceGeneral Wiring
11/06/2023CompleteAL Electrical GroupGeneral Wiring
12/27/2022CompleteAL Electrical Group—
08/26/2022CompleteJam Electrical—
07/23/2022CompleteSolas Electrical—
02/19/2022CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/31/2024Pass-Final SP - More than 10 Requested FloorsPassView ↗
05/29/2024Pass-Final SP - More than 10 Requested FloorsPassView ↗
05/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/15/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
02/15/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
02/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/12/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/08/2024Fail-Final SD - Fire PumpFailView ↗
07/19/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
01/02/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/13/2024Emergency and Standby Power Systems (Generator)—special
06/13/2024Mechanical Systems—special
06/13/2024Final—progress
05/20/2024Standpipe SystemsDominick Pillaspecial
05/20/2024Fire-Resistant Penetrations and JointsDominick Pillaspecial
05/20/2024Sprinkler SystemsDominick Pillaspecial
05/03/2024Sprinkler SystemsDominick Pillaspecial
05/03/2024Fire-Resistant Penetrations and JointsDominick Pillaspecial
05/03/2024Standpipe SystemsDominick Pillaspecial
07/26/2022Standpipe SystemsDominick Pillaspecial
194 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account