7 Open Violations 5 unresolved · 2 paperwork only▸
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
ECB02/22/2024FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED BARBED/RAZOR WIRE INSTALLED ON TOP OFF THE PERIMETER 8' HIGH CHAIN LINK FENCE AND THE CHAIN LINK FENCE ON THE FRONT GRASS. INSTALLATIONS DESIGNED TO$3K due
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
ECB09/13/1988EXIT LIGHTING INOPERATIVE AT BOTH EXITS. REMEDY: REPAIR OR REPLACE EXIT LIGHTS.Nothing owed — awaiting certificate of correction
ECB09/13/1988EXIT LIGHTING INOPERATIVE AT 2 OF 3 EXITS FROM ROOM. REMEDY: REPAIR OR REPLACE EXIT LIGHTS. EMERGENCY LIGHTING IS INOPERATIVE AT 2 LOCATIONS IN ROOM REMEDY: REPAIR EMERGENCY LIGHTING.Nothing owed — awaiting certificate of correction
Church, synagogue, chapel · 0.99 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.