Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
HEREWITH FILING PAA TO SUBMIT REVISED MONORAIL SYSTEM WITH SUSP. SCAFFOLD SYSTEM DRAWINGS. PLEASE DO THE FOLLOWING ACTION: PREVIOUSLY ISSUED DRAWING SHEET No.: EQ-002.00 IS HEREBY REPLACED (SUPERSEDED) WITH SHEET No. EQ-002.01.
On file for this project
4 documents
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents · 3 drawing sheets
Removal and installation of partitions, doors, and finishes for MER relocation. No change to use, egress, or occupancy.
On file for this project
11 documents
Latest 3 of 6 filings on this floor.
PenthouseUnder Construction56p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents
Removal and installation of partitions, doors, and finishes for MER relocation. No change to use, egress, or occupancy.
On file for this project
11 documents
THE PLUMBING SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OF EXISTING MEP SERVICES. THE SERVICES INCLUDE SANITARY, VENT, HW, CW DISTRIUBUTION ALONG WITH PLUMBING EQUIPMENT.
On file for this project
24 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 45Under Construction4p · 3 filings · 20 docs
ArchitectureEquipment
Issued Permit Scope
Protection and Mechanical Methods
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
39 documents · 4 drawing sheets
Use of temporary mini crane constructions equipment as per plans filed herewith.
On file for this project
4 documents
Floor 44Under Construction81p · 9 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
39 documents · 1 drawing sheet
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents
Latest 3 of 8 filings on this floor.
Floor 43Under Construction83p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Mechanical work Floors 42-43.
On file for this project
15 documents · 1 drawing sheet
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents
Latest 3 of 8 filings on this floor.
Floor 42Under Construction81p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Mechanical work Floors 42-43.
On file for this project
15 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 41Under Construction88p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 39-41.
On file for this project
11 documents
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 40Under Construction87p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 39-41.
On file for this project
11 documents
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 39Under Construction89p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 39-41.
On file for this project
11 documents
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 38Under Construction102p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Plumbing work Floors 34-38.
On file for this project
15 documents · 5 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 37Under Construction106p · 11 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Plumbing work Floors 34-38.
On file for this project
15 documents · 6 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents
Latest 3 of 8 filings on this floor.
Floor 36Under Construction102p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Plumbing work Floors 34-38.
On file for this project
15 documents · 6 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 35Under Construction102p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Plumbing work Floors 34-38.
On file for this project
15 documents · 6 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 34Under Construction101p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Plumbing work Floors 34-38.
On file for this project
15 documents · 5 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 33Under Construction128p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 30-33.
On file for this project
13 documents · 8 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 32Under Construction127p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 30-33.
On file for this project
13 documents · 7 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 31Under Construction128p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 30-33.
On file for this project
13 documents · 8 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 30Under Construction129p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 30-33.
On file for this project
13 documents · 9 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 29Under Construction123p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 27-29.
On file for this project
15 documents · 4 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 28Under Construction121p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 27-29.
On file for this project
15 documents · 4 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 27Under Construction121p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 27-29.
On file for this project
15 documents · 4 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 26Under Construction92p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 24-26.
On file for this project
16 documents · 2 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 25Under Construction92p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 24-26.
On file for this project
16 documents · 2 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 24Under Construction92p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 24-26.
On file for this project
16 documents · 2 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 23Under Construction96p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 20-23
On file for this project
13 documents · 2 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 22Under Construction108p · 13 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents
Filing herewith sprinkler and standpipe installations, additions, and modifications to existing system at core restrooms of office floors as per plans. No change in use, egress, or occupancy in this application.
On file for this project
15 documents
Filing for installation of new facade curtain wall and Energy compliance review of building Envelope Energy Model as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
6 documents
Latest 3 of 8 filings on this floor.
Floor 21Under Construction96p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 20-23
On file for this project
13 documents · 2 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 20Under Construction96p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Sprinkler/Standpipe work Floors 20-23
On file for this project
13 documents · 2 drawing sheets
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Latest 3 of 8 filings on this floor.
Floor 19Under Construction67p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Sprinkler/Standpipe work on Floors 18 and 19. No change in use, egress, or occupancy
On file for this project
13 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 18Under Construction68p · 13 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
EQUIPMENT USE CARS# 1&2: DUAL 7500# CAPACITY PERSONNEL HOISTS DURING BLDG ALT, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. ELEVATOR APPL. SUBMITTED SEPARATELY.
On file for this project
6 documents · 2 drawing sheets
EQUIPMENT USE CARS# 3&4: DUAL 7500# CAPACITY PERSONNEL HOISTS DURING BLDG ALT, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. ELEVATOR APPL. SUBMITTED SEPARATELY.
On file for this project
6 documents · 3 drawing sheets
EQUIPMENT USE CARS# 5&6: DUAL 10250# CAPACITY PERSONNEL HOISTS DURING BLDG ALT, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. ELEVATOR APPL. SUBMITTED SEPARATELY.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 17Under Construction84p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
EQUIPMENT USE CARS# 3&4: DUAL 7500# CAPACITY PERSONNEL HOISTS DURING BLDG ALT, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. ELEVATOR APPL. SUBMITTED SEPARATELY.
On file for this project
6 documents · 1 drawing sheet
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents
Latest 3 of 8 filings on this floor.
Floor 16Under Construction85p · 8 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
39 documents · 3 drawing sheets
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 15Under Construction82p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents
Removal and installation of partitions, doors, and finishes for MER relocation. No change to use, egress, or occupancy.
On file for this project
11 documents
Latest 3 of 7 filings on this floor.
Floor 14Under Construction84p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents · 1 drawing sheet
Removal and installation of partitions, doors, and finishes for MER relocation. No change to use, egress, or occupancy.
On file for this project
11 documents
Latest 3 of 7 filings on this floor.
Floor 13Under Construction114p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Mechanical work Floors 12-13.
On file for this project
15 documents · 9 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 12Under Construction117p · 10 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Filing herewith mechanical/hvac scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
9 documents
Mechanical work Floors 12-13.
On file for this project
15 documents · 11 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 11Under Construction148p · 12 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing herewith sprinkler scope for elevators lobbies at 7th thru 11th floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
11 documents · 2 drawing sheets
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings for pits, new steel beams, new bracing, infill, etc. as per plans.
On file for this project
32 documents · 6 drawing sheets
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents
Latest 3 of 8 filings on this floor.
Floor 10Under Construction224p · 13 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing herewith sprinkler scope for elevators lobbies at 7th thru 11th floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
11 documents · 3 drawing sheets
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings for pits, new steel beams, new bracing, infill, etc. as per plans.
On file for this project
32 documents · 6 drawing sheets
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 9Under Construction202p · 18 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
EQUIPMENT USE CARS# 1&2: DUAL 7500# CAPACITY PERSONNEL HOISTS DURING BLDG ALT, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. ELEVATOR APPL. SUBMITTED SEPARATELY.
On file for this project
6 documents · 1 drawing sheet
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents
THE PLUMBING SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OF EXISTING MEP SERVICES. THE SERVICES INCLUDE SANITARY, VENT, HW, CW DISTRIUBUTION ALONG WITH PLUMBING EQUIPMENT.
On file for this project
24 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 8Under Construction200p · 11 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
INTERIOR FIT-OUT. NEW INTERIOR PARTITIONS. NO DEMOLITION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY PROPOSED IN THIS APPLICATION.
On file for this project
6 documents · 4 drawing sheets
Filing herewith sprinkler scope for elevators lobbies at 7th thru 11th floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
11 documents · 2 drawing sheets
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings for pits, new steel beams, new bracing, infill, etc. as per plans.
On file for this project
32 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 7Under Construction162p · 11 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
INTERIOR FIT-OUT. NEW INTERIOR PARTITIONS. NO DEMOLITION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY PROPOSED IN THIS APPLICATION.
On file for this project
6 documents · 3 drawing sheets
Filing herewith sprinkler scope for elevators lobbies at 7th thru 11th floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
11 documents · 3 drawing sheets
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents
Latest 3 of 8 filings on this floor.
Floor 6Under Construction157p · 11 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Standpipe connections to existing risers and installation of (8) new FHCs per plans submitted herewith. New Sprinkler heads and piping installation per plans submitted herewith. No change in use, egress, or occupancy.
On file for this project
15 documents · 5 drawing sheets
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings for pits, new steel beams, new bracing, infill, etc. as per plans.
On file for this project
32 documents · 4 drawing sheets
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents
Latest 3 of 8 filings on this floor.
Floor 5Under Construction116p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Standpipe connections to existing risers and installation of (8) new FHCs per plans submitted herewith. New Sprinkler heads and piping installation per plans submitted herewith. No change in use, egress, or occupancy.
On file for this project
15 documents · 3 drawing sheets
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents
Latest 3 of 8 filings on this floor.
Floor 4Under Construction155p · 12 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings for pits, new steel beams, new bracing, infill, etc. as per plans.
On file for this project
32 documents · 4 drawing sheets
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents · 1 drawing sheet
Filing herewith sprinkler scope for elevators lobbies at 3rd thru 6th floor as per plans. No change in use, occupancy, or egress under this application.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3Under Construction116p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Standpipe connections to existing risers and installation of (8) new FHCs per plans submitted herewith. New Sprinkler heads and piping installation per plans submitted herewith. No change in use, egress, or occupancy.
On file for this project
15 documents · 3 drawing sheets
Filing herewith for the removal of the existing building's envelope curtainwall system.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2Under Construction244p · 9 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
20 documents
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO (M01296642-I1), CURTAINWALL REMOVAL (M01189557-I1), AND PARTIAL DEMO (M01277980-S6).
On file for this project
12 documents
Standpipe connections to existing risers and installation of (8) new FHCs per plans submitted herewith. New Sprinkler heads and piping installation per plans submitted herewith. No change in use, egress, or occupancy.
On file for this project
15 documents
Latest 3 of 8 filings on this floor.
Floor 1Under Construction192p · 9 filings · 20 docs
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
20 documents
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings for pits, new steel beams, new bracing, infill, etc. as per plans.
On file for this project
32 documents · 25 drawing sheets
Filing for installation of new facade curtain wall and Energy compliance review of building Envelope Energy Model as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
MezzanineUnder Construction206p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings for pits, new steel beams, new bracing, infill, etc. as per plans.
On file for this project
32 documents · 7 drawing sheets
Removal and installation of partitions, doors, and finishes for MER relocation. No change to use, egress, or occupancy.
On file for this project
11 documents
THE PLUMBING SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OF EXISTING MEP SERVICES. THE SERVICES INCLUDE SANITARY, VENT, HW, CW DISTRIUBUTION ALONG WITH PLUMBING EQUIPMENT.
On file for this project
24 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
CellarUnder Construction84p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings for pits, new steel beams, new bracing, infill, etc. as per plans.
On file for this project
32 documents · 6 drawing sheets
Use of Mini Excavator(s) filed in conjunction with job #s M01373547-S1-SE, M01277980-I1-GC, M01277980-S5-ST
On file for this project
6 documents · 1 drawing sheet
THE PLUMBING SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OF EXISTING MEP SERVICES. THE SERVICES INCLUDE SANITARY, VENT, HW, CW DISTRIUBUTION ALONG WITH PLUMBING EQUIPMENT.
On file for this project
24 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Sub-CellarUnder Construction78p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Support of Excavation
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings for pits, new steel beams, new bracing, infill, etc. as per plans.
On file for this project
32 documents · 4 drawing sheets
Use of Mini Excavator(s) filed in conjunction with job #s M01373547-S1-SE, M01277980-I1-GC, M01277980-S5-ST
On file for this project
6 documents
THE PLUMBING SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OF EXISTING MEP SERVICES. THE SERVICES INCLUDE SANITARY, VENT, HW, CW DISTRIUBUTION ALONG WITH PLUMBING EQUIPMENT.
On file for this project
24 documents · 3 drawing sheets