← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Fieldston Lofts Condominium
3751 RIVERDALE AVENUE · Riverdale-Spuyten Duyvil · BIN 2084180
💬 Discuss this project
2006Year Built
7Stories
RMBuilding Class
R6Zoning
22,166 sfGross Floor Area
11Units
Rent Stabilized1 Open Violation ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 7,933 sf lot · 2.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Roof7p · 3 filings · 20 docs
Floor 63p · 1 filing · 4 docs
Floor 53p · 1 filing · 4 docs
Floor 43p · 1 filing · 4 docs
Floor 33p · 1 filing · 4 docs
Floor 23p · 1 filing · 4 docs
Floor 110p · 2 filings · 10 docs
Site & exterior7p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3751 RIVERDALE AVE. ASSOC. LLC2203/21/2026
IMPACT REAL ESTATE MANAGEMENT1007/08/2026
BUILDERS NEW YORK HOLDING IV603/21/2026
BUILDERS NY HOLDINGS IV403/21/2026
FIELDSTON LOFTS CONDOMINIUM ASSO203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENVIROSPACE ARCHITECTURE303/21/2024
ASHRAF CORP311/02/2022
LAUFS ENGINEERING DESIGN110/27/2022
JOSEPH BOTTA, PE, PC201/28/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICHAEL ZENREICH ARCHITECT603/21/2026
EUROCELT EXPEDITING, INC603/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
STACIE SCORCIA COMPANY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSOLIDATED SCAFFOLDINGGeneral Contractor707/08/2026
HENRY C BLUMGeneral Contractor303/21/2026
ACTIVE AIR COOLING & HTGGeneral Contractor203/21/2026
ALEX CARRIONElectrical103/21/2026
DOWNEY, CONORElectrical103/21/2026
DIVERSIFIED GLASS & STOREGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAND ENGINEERING & ARCHIT266303/21/2024
LAUFSED2618110/27/2022
JOSEPH BOTTA, PE, PC1139201/28/2020
Building Lifecycle
All (118)Filed (10)Permit Issued (9)Signed Off (5)Facade (FISP) (9)Violation (47)Objection (20)Special Inspection (18)
07/24/2026
Cycle 10 facade report submitted
07/23/2026
Cycle 10 facade inspection completed
06/26/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
X01241803-I1
05/14/2026
Cycle 10 facade report signed — SWARMP
07/22/2025
Permit issued — Suspended Scaffold
X01241803-I1-SC
07/16/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
X01241803-I1
06/14/2024
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
X00740729-I1
04/18/2024
Signed off — Alteration
Removal and repairing of roof membrane along the main and bulkhead roof. Parapets to be raised to 8" minimal height. Metal coping and flashing to be replaced. Concrete crack/spall repair at exterior balconies No change in use, egress, or occupancy.
X00613116-I1
03/28/2024
Special inspection requirement — Final
GREGG DEANGELIS
03/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Yevgeniy Gurevich
03/21/2024
Filed — Alteration
Removal and repairing of roof membrane along the main and bulkhead roof. Parapets to be raised to 8" minimal height. Metal coping and flashing to be replaced. Concrete crack/spall repair at exterior balconies No change in use, egress, or occupancy.
X00613116-P2
12/19/2023
Cycle 9 facade report signed — SAFE
12/19/2023
Special inspection requirement — Final
GREGG DEANGELIS
12/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Yevgeniy Gurevich
11/30/2023
Cycle 9 facade report submitted
10/18/2023
Cycle 9 facade inspection completed
07/12/2023
Permit issued — Sidewalk Shed
X00740729-I1-SH
07/11/2023
Permit issued — Supported Scaffold
X00740729-S1-SF
06/06/2023
Permit issued — Sidewalk Shed
X00740729-I1-SH
04/18/2023
Signed off — Alteration
X08026393-I1
12/22/2022
Permit issued — General Construction
X00613116-I1-GC
11/10/2022
Permit issued — Structural
X08026393-I1-ST
11/03/2022
Permit issued — Supported Scaffold
X00740729-S1-SF
11/03/2022
Violation issued (HPD, closed)
I
11/02/2022
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
X00740729-S1
11/02/2022
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
X00740729-P1
10/27/2022
Filed — Alteration
X08026393-I1
10/24/2022
Special inspection requirement — Final
Wilfried Laufs
10/24/2022
Special inspection requirement — Post-installed Anchors
Wilfried Laufs
06/20/2022
Objection resolved — Addressed
05/31/2022
Objection raised — Other
05/20/2022
Permit issued — Sidewalk Shed
X00740729-I1-SH
05/19/2022
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
X00740729-I1
05/18/2022
Filed — Alteration
Removal and repairing of roof membrane along the main and bulkhead roof. Parapets to be raised to 8" minimal height. Metal coping and flashing to be replaced. Concrete crack/spall repair at exterior balconies No change in use, egress, or occupancy.
X00613116-P1
02/22/2022
Cycle 9 facade report submitted
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2022
Cycle 9 facade report signed — UNSAFE
01/24/2022
Objection raised — Inspections
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Structural
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Inspections
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Other
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Inspections
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Scope
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Scope
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Scope
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Energy
01/24/2022
Objection resolved — Addressed
01/21/2022
Cycle 9 facade inspection completed
12/08/2021
Filed — Alteration
Removal and repairing of roof membrane along the main and bulkhead roof. Parapets to be raised to 8" minimal height. Metal coping and flashing to be replaced. Concrete crack/spall repair at exterior balconies No change in use, egress, or occupancy.
X00613116-I1
12/07/2021
Violation issued (ECB, closed)
Construction
04/19/2021
Violation issued (HPD, closed)
A
02/06/2020
Signed off — Alteration
Replacement of exisitng roof top unit with new roof top unit connected to existing ductwork on existing dunnage. No change in use, occupany or egress.
X00212020-I1
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM07/22/2025
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/12/2023
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING07/11/2023
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING06/06/2023
DOB NOWGeneral ConstructionSigned-offHENRY C BLUM12/22/2022
DOB NOWStructuralSigned-offDIVERSIFIED GLASS & STORE11/10/2022
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING11/03/2022
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING05/20/2022
DOB NOWMechanical SystemsSigned-offACTIVE AIR COOLING & HTG10/09/2019
BISPLISSUEDTMS PLMBG & HTG CORP11/24/2015
BISPLISSUEDVSP MECHANICAL INC01/15/2015
BISPLISSUEDTOP DOG PLBG & HTG CORP08/05/2014
BISOTISSUEDNIR LINDERNBERG LLC07/21/2014
BISOTISSUEDALBAN CONSTRUCTION LLC06/09/2014
BIS—ISSUEDFOREMOST CONTRACTING LLC03/22/2011
BISEQISSUEDROCKLEDGE SCAFFOLD CORP08/10/2010
BISEQISSUEDROCKLEDGE SCAFFOLD CORP08/09/2010
BISSDISSUEDFIVE BOROUGH NYC LLC05/14/2010
BIS—ISSUEDFOREMOST CONTRACTING LLC03/31/2010
BISPLISSUEDRELIABLE PLBG & HTG CORP01/27/2010
BISEQISSUEDFOREMOST CONTRACTING LLC10/07/2009
BISPLISSUEDPREMIER PLBG. & HTG SPECI09/29/2009
BISEQISSUEDBINDELA CORP06/11/2009
BISCCISSUEDBINDELA CORP05/07/2009
BIS—ISSUEDBINDELA CORP04/29/2009
BISEQISSUEDP.J.B. CONTRACTING CORP03/27/2009
BISEQISSUEDBINDELA CORP03/23/2009
BISEQISSUEDP.J.B. CONTRACTING CORP03/20/2009
BISEQISSUEDP.J.B. CONTRACTING CORP03/13/2009
BISEQISSUEDDAUITO CONSTRUCTION INC01/21/2009
BIS—ISSUEDDAUITO CONSTRUCTION INC01/21/2009
BISPLISSUEDPREMIER PLBG & HTG SPEC09/05/2008
BISEQISSUEDD'AUITO CONSTRUCTION03/24/2008
BISEQISSUEDCSC OF NEW YORK INC.01/07/2008
BISEQISSUEDD'AUITO CONSTRUCTION10/31/2007
BIS—ISSUEDD'AUITO CONSTRUCTION10/15/2007
BISPLISSUEDPREMIER PLBG & HTG SPEC05/21/2007
BIS—ISSUEDHUDSON VIEW CONSTRUCTION, INC05/10/2007
BISEQISSUEDHUDSON VIEW CONSTRUCTION INC05/07/2007
BISEQISSUEDHUDSON VIEW CONST.05/03/2007
+ 10 more permits on file
2 projects · most recent 04/28/2025
General Wiring
FiledStatusContractorScope
04/28/2025Permit IssuedAXCEL ELECTRIC CO., INC.General Wiring
05/25/2022Permit IssuedSOLAS ELECTRICAL CORP—
1 project · most recent 11/02/2022
Scaffold Sidewalk Shed
FiledStatusContractorScope
11/02/2022Signed-offCONSOLIDATED SCAFFOLDINGScaffold, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
03/28/2024FinalGREGG DEANGELISprogress
03/28/2024Structural Stability – Alterations of existing buildingsYevgeniy Gurevichspecial
12/19/2023FinalGREGG DEANGELISprogress
12/19/2023Structural Stability – Alterations of existing buildingsYevgeniy Gurevichspecial
10/24/2022FinalWilfried Laufsprogress
10/24/2022Post-installed AnchorsWilfried Laufsspecial
01/29/2020Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
01/29/2020Mechanical SystemsJOSEPH BOTTAspecial
01/29/2020FinalJOSEPH BOTTAprogress
01/29/2020HVAC and service water heating system controls JOSEPH BOTTAenergy_progress
01/29/2020HVAC and service water heating equipment JOSEPH BOTTAenergy_progress
01/29/2020Maintenance informationJOSEPH BOTTAenergy_progress
01/26/2020HVAC and service water heating system controls JOSEPH BOTTAenergy_progress
01/26/2020HVAC and service water heating equipment JOSEPH BOTTAenergy_progress
01/26/2020Maintenance informationJOSEPH BOTTAenergy_progress
01/26/2020FinalJOSEPH BOTTAprogress
01/26/2020Mechanical SystemsJOSEPH BOTTAspecial
01/26/2020Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
▾Documents — 169 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
08/24/2026X00613116-P2Request digital key ↗
08/23/2026X08026393-I1Request digital key ↗
08/23/2026X00740729-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026X00212020-I1Request digital key ↗
08/15/2026X00212020-P1Request digital key ↗
▸Applications & Permits20
▸BISWORK PERMIT APPLICATION10
12/09/2015220365922Open ↗
01/29/2015220380718Open ↗
08/07/2014220365922Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
06/10/2014220380718Open ↗
04/14/2014220365922Open ↗
12/10/2012220242663Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications62
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
06/22/2016220380718Open ↗
03/08/2016220365922Open ↗
07/21/2014220365922Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026X08026393-I1Open ↗
09/01/2026X00613116-P1Open ↗
08/27/2026X00613116-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026X00212020-P1Open ↗
08/26/2026X00212020-I1Open ↗
08/24/2026X00613116-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026X08026393-I1Open ↗
09/01/2026X00613116-P1Open ↗
08/27/2026X00613116-P2Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
06/14/2014220380718Open ↗
12/10/2012220242663Open ↗
08/19/2010220076245Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
12/10/2012220242663Open ↗
08/19/2010220076245Open ↗
08/10/2010220076398Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/14/2014220380718Open ↗
▸Trade Schedules & Equipment22
▸BISSELF-CERT PLUMBING NOTICE8
10/28/2015220380718Open ↗
02/25/2015220380718Open ↗
03/15/2012220055295Open ↗
Showing 3 of 8 on file for this type
▸BISWATER METER PERMIT : DEP-METER6
05/24/2011220055295Open ↗
05/24/2011220055295Open ↗
05/24/2011220055295Open ↗
Showing 3 of 6 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION4
05/08/2012220055295Open ↗
03/15/2012220055295Open ↗
03/15/2012220055295Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/10/2014220380718Open ↗
04/14/2014220365922Open ↗
▸BISSCHEDULE B - PLUMBING1
04/07/2010220055295Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
03/15/2012220055295Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026X00212020-I1Open ↗
08/13/2026X00212020-P1Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
08/19/2010220076245Open ↗
08/10/2010220076398Open ↗
04/07/2010220055295Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026X00212020-I1Open ↗
08/26/2026X00212020-P1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/22/2016220380718Open ↗
03/08/2016220365922Open ↗
06/10/2014220380718Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
06/22/2016220380718Open ↗
03/08/2016220365922Open ↗
▸Approvals, Objections & Sign-offs22
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
01/31/2017220380718Open ↗
07/12/2016220380718Open ↗
06/22/2016220380718Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
12/17/2010220097696Open ↗
08/19/2010220076245Open ↗
08/10/2010220076398Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
06/22/2016220380718Open ↗
08/25/2011220076245Open ↗
08/16/2011220076398Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM2
05/24/2011220055295Open ↗
05/24/2011220055295Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
05/18/2011220055295Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
06/22/2016220380718Open ↗
03/08/2016220365922Open ↗
06/10/2014220380718Open ↗
Showing 3 of 6 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
06/10/2014220380718Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET8
06/10/2014220380718Open ↗
04/14/2014220365922Open ↗
12/10/2012220242663Open ↗
Showing 3 of 8 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/09/2015220365922Open ↗
▸DOB NOWIRA Certification1
08/13/2026X01241803-I1Open ↗