← Back
Elevator cooperative
3755 HENRY HUDSON PKWY W
BRONX · Riverdale-Spuyten Duyvil · BIN 2085777
💬 Discuss this project
1961Year Built
12Stories
D4Building Class
R7AZoning
151,800 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 3755 OWNERS LTD · 21,800 sf lot · 6.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 5 docs
Floor 122p · 1 filing · 9 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 71p · 1 filing · 19 docs
Floor 62 filings · 20 docs
Floor 52p · 1 filing · 10 docs
Floor 4Under Construction1 filing · 9 docs
Floor 3
Floor 2
Floor 1
Site & exterior4 filings · 17 docs
Filed — no permit issued3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3755 OWNERS2203/22/2026
GMNV907/08/2026
KINGS GROUP NY CORP903/22/2026
PLATINUM SERVICES NY504/09/2026
GARTHCHESTER REALTY203/21/2026
3755 OWNERS LTD C O GOODMAN203/21/2026
3755 OWNER203/21/2026
NYRS103/22/2026
ADRS INC.103/22/2026
SPRING SCAFFOLDING INC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAL DORFMAN ARCHITECT704/25/2026
JOSE A. SANTOS P.E.P.C208/13/2024
ASHRAF CORP112/28/2023
LEDER-LUIS ARCHITECTURAL DESIGN, PL312/30/2022
ENTHINK ENGINEERS LLC306/03/2022
REVANS DESIGN PE PC204/07/2022
DESMAN INC.112/23/2021
SZEKELY ENGINEERING107/16/2021
ROYAL ENGINEERING, P.C207/27/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERICAN GOTHAM CONSULTANTS1203/21/2026
XPDITE GROUP LLC (104)303/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
JM ZONING, LLC.403/21/2026
FAA EXPEDITING SERVICES403/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A D RENOVATION SOLUTIONGeneral Contractor903/21/2026
CANIDO BASONAS CONST SVCGeneral Contractor707/08/2026
HIGH END CONSTRUCTION LLCGeneral Contractor607/08/2026
KINGS GROUP NY CORPGeneral Contractor603/21/2026
VELUX CONSTRUCTION MANAGEMENTGeneral Contractor507/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor204/09/2026
FLUID MECHANICS CORPPlumbing203/22/2026
HUDSON PLBG AND HTG CO INPlumbing207/08/2026
GEMINI ELECTRIC CO., INC.Electrical203/22/2026
CHETRAM, RISHIRAMElectrical103/21/2026
N.Y. EMS MECHANICAL CORPPlumbing107/08/2026
KARAGIANNIS, DIMITRIOSElectrical103/21/2026
MACK ALUNS JRElectrical103/21/2026
MARIO CASTROElectrical103/21/2026
MASE ELECTRIC INCElectrical103/22/2026
QUINTANA, DAVIDElectrical103/21/2026
UPDATE SYSTEMS ELECTRICALElectrical103/22/2026
PHOENIX SUTTON STR INCGeneral Contractor107/08/2026
DUAL FUEL PLUBING & HTINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HAL DORFMAN ARCHITECT474304/25/2026
JOSE A SANTOS PE, PC3292208/13/2024
GEORGE J. XERAKIAS, PE1658111/28/2023
LEDER-LUIS ARCHITECTURAL1553212/30/2022
REVANS DESIGN PE PC4617204/07/2022
SZEKELY ENGINEERING299107/16/2021
ANS CONSULTANTS, INC.1768107/15/2021
Building Lifecycle
All (190)Filed (24)Permit Issued (22)Signed Off (12)Facade (FISP) (15)Violation (60)Inspection (19)Objection (8)Special Inspection (30)
08/30/2026
Filed — Alteration
IRA to assist with Condition Assessment
X01453217-I1
08/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/16/2026
Permit issued — Plumbing
X01321725-S1-PL
06/03/2026
Permit issued — General Construction
X01321725-I1-GC
04/25/2026
Filed — Alteration
Replace, relocate, and new plumbing fixtures as per plans.
X01321725-I1
04/25/2026
Filed — Alteration
Replace, relocate, and new plumbing fixtures as per plans.
X01321725-S1
11/26/2025
Signed off — Alteration
X00982181-I1
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hal Dorfman
11/19/2025
Special inspection requirement — Lighting controls
Hal Dorfman
11/19/2025
Special inspection requirement — Lighting in dwelling units
Hal Dorfman
11/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Hal Dorfman
11/19/2025
Special inspection requirement — Final
Hal Dorfman
12/23/2024
Permit issued — Sidewalk Shed
X00982181-I1-SH
12/02/2024
Signed off — Alteration
Installation of outriggers for facade repair and inspection
X00968158-I1
11/26/2024
Cycle 9 facade report submitted
11/26/2024
Cycle 9 facade report signed — SAFE
11/25/2024
Signed off — Alteration
X00645953-I1
10/18/2024
Cycle 9 facade inspection completed
08/26/2024
Signed off — Alteration
X08040261-I1
08/22/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/13/2024
Filed — Alteration
X08040261-P1
08/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
08/05/2024
Special inspection requirement — Lighting in dwelling units
Jose Santos
08/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
03/15/2024
Permit issued — General Construction
X08040261-I1-GC
12/29/2023
Permit issued — Sidewalk Shed
X00982181-I1-SH
12/28/2023
Filed — Alteration
X00982181-I1
12/12/2023
Permit issued — Suspended Scaffold
X00968158-I1-SC
12/01/2023
Permit issued — General Construction
X00645953-I1-GC
11/28/2023
Filed — Alteration
Installation of outriggers for facade repair and inspection
X00968158-I1
11/28/2023
Special inspection requirement — Post-installed Anchors
George Xerakias
11/28/2023
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
09/18/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
X00051100-I1
08/18/2023
Permit issued — General Construction
X00645953-I1-GC
03/23/2023
Permit issued — General Construction
X08040261-I1-GC
03/06/2023
Permit issued — General Construction
X08040261-I1-GC
03/02/2023
Signed off — Alteration
Construction work to renovate apartment 6G in conjunction with aplication # X00620896
X00620862-I1
03/01/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/13/2023
Signed off — Alteration
Alteration & combination apts 6A 7A, new interior staircase. Remove range KIT6A, convert to laundry. Alter KIT 7A, changes to non bearing partitions, new GB ceiling / lighting as per plan. No change to egress, use, occupancy,zoning or rm count.
X00502289-S1
02/13/2023
Signed off — Alteration
Alteration & combination apts 6A 7A, new interior staircase. Remove range KIT6A, convert to laundry. Alter KIT 7A, changes to non bearing partitions, new GB ceiling / lighting as per plan. No change to egress, use, occupancy,zoning or rm count.
X00502289-I1
02/01/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/27/2023
Filed — Alteration
Alteration & combination apts 6A 7A, new interior staircase. Remove range KIT6A, convert to laundry. Alter KIT 7A, changes to non bearing partitions, new GB ceiling / lighting as per plan. No change to egress, use, occupancy,zoning or rm count.
X00502289-P1
01/13/2023
Filed — Alteration
X08040261-I1
01/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Julio Leder-Luis
01/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julio Leder-Luis
01/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
Julio Leder-Luis
12/30/2022
Filed — Alteration
Construction work to renovate apartment 6G in conjunction with aplication # X00620896
X00620862-P1
12/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/09/2022
Cycle 9 facade report signed — SWARMP
12/01/2022
Cycle 9 facade inspection completed
11/17/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/10/2022
Cycle 9 facade report submitted
09/16/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00627531-I1
08/12/2022
Signed off — Alteration
Addition, relocation & replacement of 4 plumbing and 1 gas fixture in Apt 5E. Removal of 1 plumbing and 1 gas fixtures in Apt 5F. Removal of 1 gas fixture in Apt 5E.
X00664984-I1
08/12/2022
Signed off — Alteration
Addition, relocation & replacement of 4 plumbing and 1 gas fixture in Apt 5E. Removal of 1 plumbing and 1 gas fixtures in Apt 5F. Removal of 1 gas fixture in Apt 5E.
X00664984-S1
08/12/2022
Permit issued — General Construction
X00664984-I1-GC
08/05/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/05/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 190 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHUDSON PLBG AND HTG CO IN06/16/2026
DOB NOWGeneral ConstructionPermit IssuedHIGH END CONSTRUCTION LLC06/03/2026
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/23/2024
DOB NOWGeneral ConstructionSigned-offVELUX CONSTRUCTION MANAGE03/15/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/29/2023
DOB NOWSuspended ScaffoldSigned-offCANIDO BASONAS CONST. COR12/12/2023
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC12/01/2023
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC08/18/2023
DOB NOWGeneral ConstructionSigned-offVELUX CONSTRUCTION MANAGE03/23/2023
DOB NOWGeneral ConstructionSigned-offVELUX CONSTRUCTION MANAGE03/06/2023
DOB NOWGeneral ConstructionSigned-offA D RENOVATION SOLUTION08/12/2022
DOB NOWStructuralSigned-offRANDY ROSE CORP06/06/2022
DOB NOWGeneral ConstructionSigned-offA D RENOVATION SOLUTION05/13/2022
DOB NOWPlumbingSigned-offHUDSON PLBG AND HTG CO IN04/27/2022
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING03/15/2022
DOB NOWGeneral ConstructionSigned-offA D RENOVATION SOLUTION03/07/2022
DOB NOWGeneral ConstructionSigned-offRANDY ROSE CORP02/22/2022
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC01/07/2022
DOB NOWGeneral ConstructionSigned-offRANDY ROSE CORP12/22/2021
DOB NOWPlumbingSigned-offN.Y. EMS MECHANICAL CORP05/06/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP10/02/2018
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/07/2018
BISOTISSUEDA W R GROUP INC03/30/2020
BISOTISSUEDA W R GROUP INC09/20/2019
BISOTISSUEDESPAILLATA SOLUTIONS LLC03/25/2019
BISOTISSUEDA W R GROUP INC09/21/2018
BISPLISSUEDDEMAR PLUMBING CORP11/29/2017
BISOTISSUEDA W R GROUP INC09/15/2017
BISOTISSUEDA W R GROUP INC09/05/2017
BISPLISSUEDCLOVERDALE MASTER P&H INC06/26/2017
BISOTISSUEDA D RENOVATION SOLUTION10/28/2016
BISOTISSUEDA W R GROUP INC09/29/2015
BISOTISSUEDA W R GROUP INC06/30/2015
BISPLISSUEDG & J PLMBNG AND HTG INC02/18/2015
BISOTISSUEDG&A RESTORATION SERVICES02/03/2015
BISEQISSUEDCEPRINE CONSTRUCTION INC11/05/2014
BISOTISSUEDAVI'S HOME IMPROVEMENT &09/12/2014
BISPLISSUEDL.L.G. PLBG & HTG INC09/04/2014
BISOTISSUEDA W R GROUP INC06/27/2014
BISEQISSUEDEVEREST SCAFFOLDING INC10/03/2013
+ 22 more permits on file
1 project · most recent 07/16/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2021——Air Conditioning Systems
Cooling
Mitsubishi Electric MXZ-4C36NAHZ 36,000 BTU · Condensing Unit ×2
2 projects · most recent 04/25/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/25/2026Permit IssuedHUDSON PLBG AND HTG CO INGas, Water/Sanitary
02/24/2022——Water/Sanitary
25 projects · most recent 07/15/2026
General Wiring
FiledStatusContractorScope
07/15/2026Permit IssuedROBIN ELECTRICAL CO., INCGeneral Wiring
07/13/2026Permit IssuedROBIN ELECTRICAL CO., INCGeneral Wiring
06/19/2026CompleteEVS ELECTRIC CORPGeneral Wiring
04/17/2026Permit IssuedROBIN ELECTRICAL CO., INCGeneral Wiring
12/03/2024CompleteMASE ELECTRIC INCGeneral Wiring
04/13/2024Permit IssuedDVM ELECTRICAL SERVICES LGeneral Wiring
12/26/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
11/01/2023CompleteGEMINI ELECTRIC CO., INC.General Wiring
09/27/2023CompleteGEMINI ELECTRIC CO., INC.General Wiring
09/12/2023CompleteGEMINI ELECTRIC CO., INC.General Wiring
06/08/2023CompleteGEMINI ELECTRIC CO., INC.General Wiring
02/13/2023Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
12/20/2022CompleteASTRO ELECL CONTNG INC—
10/28/2022CompleteGEMINI ELECTRIC CO., INC.General Wiring
10/28/2022CompleteGEMINI ELECTRIC CO., INC.General Wiring
1 project · most recent 08/30/2026
FiledStatusContractorScope
08/30/2026———
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
08/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/22/2024Pass-Final General Construction Non-Directive 14PassView ↗
03/01/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/01/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2022Fail-Final General Construction Non-Directive 14FailView ↗
11/17/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/05/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/28/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/25/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/28/2021Pass-Final PL - More than 10 Requested FloorsPassView ↗
06/09/2021Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/28/2021Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/20/2021Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
11/19/2025Fire-Resistant Penetrations and JointsHal Dorfmanspecial
11/19/2025Lighting controlsHal Dorfmanenergy_progress
11/19/2025Lighting in dwelling unitsHal Dorfmanenergy_progress
11/19/2025Energy Code Compliance InspectionsHal Dorfmanprogress
11/19/2025FinalHal Dorfmanprogress
08/05/2024Energy Code Compliance InspectionsJose Santosprogress
08/05/2024Lighting in dwelling unitsJose Santosenergy_progress
08/05/2024Fire-Resistant Penetrations and JointsJose Santosspecial
11/28/2023Post-installed AnchorsGeorge Xerakiasspecial
11/28/2023Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
01/07/2023Energy Code Compliance InspectionsJulio Leder-Luisprogress
01/07/2023Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
01/07/2023Fire-Resistance Rated ConstructionJulio Leder-Luisprogress
04/11/2022Fire-Resistant Penetrations and JointsPAUL REVANSspecial
04/11/2022Maintenance informationPAUL REVANSenergy_progress
01/19/2022FinalHal Dorfmanprogress
01/19/2022Fire-Resistant Penetrations and JointsHal Dorfmanspecial
01/19/2022Energy Code Compliance InspectionsHal Dorfmanprogress
01/19/2022Lighting in dwelling unitsHal Dorfmanenergy_progress
01/19/2022Lighting controlsHal Dorfmanenergy_progress
12/10/2021FinalTHOMAS J. BASILEprogress
07/15/2021Structural Stability – Alterations of existing buildingsATULKUMAR SHAH, PEspecial
07/15/2021HVAC-R and service water piping design and insulationTom Szekelyenergy_progress
07/15/2021Energy Code Compliance InspectionsTom Szekelyprogress
07/15/2021HVAC-R and service water heating system controlsTom Szekelyenergy_progress
Latest 25 of 36.
▾Documents — 335 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
09/15/2026X01453217-I1Request digital key ↗
08/26/2026X01321725-S1Request digital key ↗
08/26/2026X01321725-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits51
▸BISWORK PERMIT APPLICATION30
03/30/2020220614226Open ↗
09/23/2019220614226Open ↗
03/26/2019220687709Open ↗
Showing 3 of 30 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION19
03/26/2019220687709Open ↗
09/05/2017220614226Open ↗
07/31/2017220577267Open ↗
Showing 3 of 19 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
05/14/2015220400563Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications101
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
01/06/2020220687709Open ↗
01/06/2020220687709Open ↗
03/26/2019220687709Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/26/2026X01321725-I1Open ↗
08/26/2026X01321725-S1Open ↗
08/26/2026X00051100-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/25/2026X00502557-I1Open ↗
09/01/2026X00664984-I1Open ↗
09/01/2026X00664984-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/25/2026X00502557-I1Open ↗
09/01/2026X00664984-I1Open ↗
09/01/2026X00620862-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
03/26/2019220687709Open ↗
09/05/2017220614226Open ↗
07/31/2017220577267Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
11/08/2012220240424Open ↗
10/09/2012220233432Open ↗
12/02/2011220158451Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
03/26/2019220687709Open ↗
09/05/2017220614226Open ↗
07/31/2017220577267Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/04/2014240079080Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/04/2014240079080Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/01/2016240151027Open ↗
▸Trade Schedules & Equipment23
▸BISSELF-CERT PLUMBING NOTICE6
12/08/2015220158451Open ↗
03/18/2015220400563Open ↗
03/02/2015220400563Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT5
07/20/2011220105990Open ↗
07/20/2011220105990Open ↗
07/20/2011220105990Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
09/01/2016240151027Open ↗
12/02/2011220158451Open ↗
03/29/2011220105990Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
08/24/2011220105990Open ↗
07/20/2011220105990Open ↗
07/20/2011220105990Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
08/02/2011210086912Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/31/2017220577267Open ↗
08/28/2014220400563Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
08/02/2011210086912Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
03/26/2019220687709Open ↗
09/15/2016240151027Open ↗
09/01/2016240151027Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/25/2026X00558317-I1Open ↗
08/24/2026X00620896-I1Open ↗
08/24/2026X00620862-P1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
03/26/2019220687709Open ↗
07/31/2017220577267Open ↗
09/01/2016240151027Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
12/02/2011220158451Open ↗
03/01/2011220105990Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026X01321725-S1Open ↗
08/26/2026X01321725-I1Open ↗
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
01/06/2020220687709Open ↗
03/26/2019220687709Open ↗
03/26/2019220687709Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
01/06/2020220687709Open ↗
04/03/2018220577267Open ↗
11/29/2017240151027Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
12/02/2011220158451Open ↗
12/02/2011220158451Open ↗
07/20/2011220105990Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026X00502289-I1Open ↗
08/13/2026X00502557-I1Open ↗
08/13/2026X00664984-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/15/2016240151027Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/01/2016240151027Open ↗
11/04/2014240079080Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/06/2020220687709Open ↗
▸Approvals, Objections & Sign-offs31
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
01/06/2020220687709Open ↗
04/09/2018220577267Open ↗
04/03/2018220577267Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
04/03/2018220577267Open ↗
09/15/2016240151027Open ↗
09/15/2016240151027Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
11/08/2012220240424Open ↗
10/09/2012220233432Open ↗
12/02/2011220158451Open ↗
Showing 3 of 8 on file for this type
▸BISBSA-CPC APPROVAL1
08/22/2012220038368Open ↗
▸BISSUPERSEDING LETTER1
02/18/2015220400563Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT14
01/06/2020220687709Open ↗
03/26/2019220687709Open ↗
04/03/2018220577267Open ↗
Showing 3 of 14 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
10/04/2016240151027Open ↗
03/01/2011220105990Open ↗
▸Filing & Intake Forms23
▸BISEFILING COVER SHEET9
03/26/2019220687709Open ↗
09/05/2017220614226Open ↗
07/31/2017220577267Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION8
12/12/2019220687709Open ↗
04/02/2018220577267Open ↗
09/15/2016240151027Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM3
03/30/2020220614226Open ↗
01/06/2020220687709Open ↗
04/03/2018220577267Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
09/01/2016240151027Open ↗
11/04/2014240079080Open ↗
11/13/2012220240424Open ↗
▸Other Documents7
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
08/13/2026X00051100-I1Open ↗
08/13/2026X00051100-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/14/2015220400563Open ↗
▸DOB NOWIRA Certification1
09/15/2026X01453217-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X00968158-I1Open ↗
▸DOB NOWManufacturer's Specifications1