2 Open Violations 0 unresolved · 2 paperwork only▸
ECB05/08/2018FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED.ON 05/08/18 @ APPROX 11:30AM I OBSERVED IN THE BASEMENT A NEW OIL BOILER ALONG WITH NEW COOPER WATER PIPING AND FITTING INSTALLED WITHOUT ANY INSPECTION ONNothing owed — awaiting certificate of correction
ECB05/08/2018WORK WITHOUT A PERMIT.ON 05/08/18 @ APPROX 11:30AM I OBSERVED IN THE BASEMENT A NEW OIL BOILER ALONG WITH NEW COPPER WATER PIPING AND FITTING INSTALLED WITHOUT ANY PERMITS ON FILE UNDER DOB RECORDS.PICTURES TAKNothing owed — awaiting certificate of correction
Parsonage, rectory · 9,555 sf lot · 0.16 FAR built · Flood zone X