← Back
BuildNYC
Four families
376 ROCKAWAY PARKWAY
BROOKLYN · BIN 3101913
💬 Discuss this project
1930Year Built
2Stories
C3Building Class
R6Zoning
3,198 sfGross Floor Area
4Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Four families · Owner of record: 376 Rockaway Realty · 2,500 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRenovation and conversion to 10 dwelling units31p · 1 filing · 20 docs
Floor 2Renovation and conversion to 10 dwelling units27p · 1 filing · 20 docs
Floor 1Renovation and conversion to 10 dwelling units27p · 1 filing · 20 docs
BasementRenovation and conversion to 10 dwelling units30p · 1 filing · 20 docs
Site & exteriorRenovation and conversion to 10 dwelling units6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
376 Rockaway Realty103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/20/2024$1.1M—376 ROCKAWAY LLC → 376 ROCKAWAY REALTY LLC$353/sf building
01/21/2020$835K—Private party → 376 ROCKAWAY LLC$261/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Leandro Nils Dickson Architect306/09/2025
Pramodray Shah, P.E.404/22/2025
Vasilios Artemiou PE103/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAC Developers Group803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S&R ElectricalElectrical103/22/2026
MJH ConstructionGeneral Contractor107/08/2026
MJH Constructionspecialty_contractor107/08/2026
Ness Mechanical P & HPlumbing107/08/2026
Quality PipingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616506/09/2025
Building Lifecycle
12/25/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B01139168-I1-GC
10/06/2025
Closed: Failure to submit an acceptable inspectn rpt for structurally compromised bldg.
DOB violation · closed on the city's record
08/14/2025
Closed: Structure rendered non compliant damages observed to have been sustain caused due to fire. Pemises has extensive smoke & water damage . Cha rring…
DOB violation · closed on the city's record
08/06/2025
Failure to obey a vacate order from the commissioner. Full vacate order B267/2024 exist on the property issued on 6/16/2024. At time of inspection,…
ECB violation · closed
06/11/2025
Signed off — Alteration CO
Sprinkler filed in conjunction to Alt 1 job number B01139168-I1.
B01139168-S1
81 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMJH Construction05/01/2025
DOB NOWSprinklersSigned-offQuality Piping02/18/2025
DOB NOWGeneral ConstructionPermit IssuedMJH Construction02/18/2025
DOB NOWPlumbingSigned-offNess Mechanical P & H02/14/2025
1 project · most recent 06/09/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
06/09/2025Signed-offMJH ConstructionHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 06/09/2025
Sprinkler System
FiledStatusContractorScope
06/09/2025Signed-offQuality PipingSprinkler System
1 project · most recent 06/09/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/09/2025Signed-offNess Mechanical P & HGas, Storm, Water/Sanitary
1 project · most recent 04/23/2025
General Wiring
FiledStatusContractorScope
04/23/2025CompleteS&R ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/04/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
06/05/2025Fenestration air leakageFAHAD FATEHenergy_progress
06/05/2025Maintenance informationFAHAD FATEHenergy_progress
06/05/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
06/05/2025Permanent certificateFAHAD FATEHenergy_progress
06/05/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/05/2025Interior lighting powerFAHAD FATEHenergy_progress
06/05/2025MeteringFAHAD FATEHenergy_progress
06/05/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
06/05/2025Fenestration areasFAHAD FATEHenergy_progress
06/05/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/05/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
06/05/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/22/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/22/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/22/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/22/2025Maintenance informationFAHAD FATEHenergy_progress
04/09/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/09/2025Maintenance informationFAHAD FATEHenergy_progress
04/09/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/09/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/02/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/02/2025Maintenance informationFAHAD FATEHenergy_progress
04/02/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/02/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/11/2025Ventilation and air distribution systemFAHAD FATEHenergy_progress
Latest 25 of 39.
43 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account