RoofUnder Construction37p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
Filing herewith a wet sprinkler/ standpipe application for a new building filed in conjunction with 104214155.
On file for this project
40 documents · 1 drawing sheet
FUEL OIL PIPING SYSTEM SEISMIC REINFORCING PLANS
On file for this project
16 documents
Installation of seismic bracing on new sprinkler and standpipe systems.
On file for this project
11 documents
Latest 3 of 7 filings on this floor.
Floor 6Under Construction44p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe
Filing herewith a wet sprinkler/ standpipe application for a new building filed in conjunction with 104214155.
On file for this project
40 documents · 1 drawing sheet
Installation of seismic bracing on new sprinkler and standpipe systems.
On file for this project
11 documents · 1 drawing sheet
M502- INTEGRAL BELLY TANK FOR GENERATOR WITH 275 GALLONS CAPACITY. DRAWINGS HAVE NO AMENDED CHANGES OTHER THAN -S3 SUFFIX.
On file for this project
72 documents
Latest 3 of 6 filings on this floor.
Floor 5Under Construction45p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe
Filing herewith a wet sprinkler/ standpipe application for a new building filed in conjunction with 104214155.
On file for this project
40 documents · 1 drawing sheet
Installation of seismic bracing on new sprinkler and standpipe systems.
On file for this project
11 documents · 1 drawing sheet
M502- INTEGRAL BELLY TANK FOR GENERATOR WITH 275 GALLONS CAPACITY. DRAWINGS HAVE NO AMENDED CHANGES OTHER THAN -S3 SUFFIX.
On file for this project
72 documents
Latest 3 of 7 filings on this floor.
Floor 4Under Construction44p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe
Filing herewith a wet sprinkler/ standpipe application for a new building filed in conjunction with 104214155.
On file for this project
40 documents · 1 drawing sheet
Installation of seismic bracing on new sprinkler and standpipe systems.
On file for this project
11 documents · 1 drawing sheet
M502- INTEGRAL BELLY TANK FOR GENERATOR WITH 275 GALLONS CAPACITY. DRAWINGS HAVE NO AMENDED CHANGES OTHER THAN -S3 SUFFIX.
On file for this project
72 documents
Latest 3 of 6 filings on this floor.
Floor 3Under Construction45p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe
Filing herewith a wet sprinkler/ standpipe application for a new building filed in conjunction with 104214155.
On file for this project
40 documents · 1 drawing sheet
Installation of seismic bracing on new sprinkler and standpipe systems.
On file for this project
11 documents
M502- INTEGRAL BELLY TANK FOR GENERATOR WITH 275 GALLONS CAPACITY. DRAWINGS HAVE NO AMENDED CHANGES OTHER THAN -S3 SUFFIX.
On file for this project
72 documents
Latest 3 of 7 filings on this floor.
Floor 2Under Construction44p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe
Filing herewith a wet sprinkler/ standpipe application for a new building filed in conjunction with 104214155.
On file for this project
40 documents · 1 drawing sheet
Installation of seismic bracing on new sprinkler and standpipe systems.
On file for this project
11 documents · 1 drawing sheet
M502- INTEGRAL BELLY TANK FOR GENERATOR WITH 275 GALLONS CAPACITY. DRAWINGS HAVE NO AMENDED CHANGES OTHER THAN -S3 SUFFIX.
On file for this project
72 documents
Latest 3 of 6 filings on this floor.
Floor 1Under Construction46p · 8 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
Filing herewith a wet sprinkler/ standpipe application for a new building filed in conjunction with 104214155.
On file for this project
40 documents · 1 drawing sheet
FUEL OIL PIPING SYSTEM SEISMIC REINFORCING PLANS
On file for this project
16 documents
Installation of seismic bracing on new sprinkler and standpipe systems.
On file for this project
11 documents
Latest 3 of 8 filings on this floor.
Cellar1 filing · 10 docs
Architecture
Issued Permit Scope
General Construction
PLUMBING SEISMIC DRAWINGS FOR NEW GAS PIPING AND BOOSTER PUMP INSTALLATION. FILED HEREWITH FOR SEISMIC BRACING ( PLUMBING TRADE) IN CONJUNCTION WITH NB # 104214155. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
10 documents
Site & exterior60p · 11 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalStructuralOther
Issued Permit Scope
Construction Fence · Sidewalk Shed · Sprinklers · Standpipe · Supported Scaffold · Support of Excavation
Filing herewith a wet sprinkler/ standpipe application for a new building filed in conjunction with 104214155.
On file for this project
40 documents · 12 drawing sheets
SH/PS502M - FOR TEMPORARY CONSTRUCTION EQUIPMENT(EMERGENCY SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW # 124367 NO CHANGE IN USE, OCCUPANCY OR EGRESS
On file for this project
10 documents · 8 drawing sheets
SOE/PS502M - FOR TEMPORARY SUPPORT OF EXCAVATION IN STREET AT 5 LOCATIONS FOR UTILITY CONECTIONS SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB # 104214155 NO CHANGE IN USE, OCCUPANCY OR EGRESS
On file for this project
8 documents · 11 drawing sheets
Latest 3 of 11 filings on this floor.
Filed — no permit issued20p · 2 filings · 8 docs
ArchitectureElectricalGeneralMechanicalPlumbingStructural
M502: INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUING ALLRELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGETO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 12 drawing sheets
No filed description on record for this project.
On file for this project
4 documents · 2 drawing sheets