2 Open Violations 0 unresolved · 2 paperwork only▸
ECB05/12/2026AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 10/16/2025 BY BADGE 3687 FOR WORK WITHOUT A PERMIT. AT TIME OF INSPECTION ,OBSERVED A14X14 GAZEBO AT REAR ,ALSO EXTENSION AT CORNER OF EXPOSURE 3 AND 4 APHearing held — result not yet published$2K proposed
ECB08/20/1990FAILURE TO PROVIDE CONTRACTORS SIGN REMEDY POST REGAL CONTRACTORS SIGN. FAILURE TO SAFE GUARD PUBLIC AND PROPERTY DEVICE CONSTRUCTION FOUNDATION LEFT OPEN UNEXPECTED AND WATER HAS ACCUMULATED INSIDENothing owed — awaiting certificate of correction
Two family frame · 5,000 sf lot · 0.4 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.