Five to six families
378 KOSCIUSZKO STREET
BROOKLYN · BIN 3043322
💬 Discuss this project
1931Year Built
4Stories
C2Building Class
R6BZoning
3,890 sfGross Floor Area
5Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 378 K PROP LLC · 2,000 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
378 K PROP1203/22/2026
TCJ CONSTRUCTION203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/08/2016$988K—Private party → 378 K PROP LLC$254/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALL CITY ENGINEERING PC304/04/2024
BASIC GROUPS CORP102/28/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor603/21/2026
SMVP MGMT INCGeneral Contractor204/09/2026
HV ELECTRIC CORPElectrical103/22/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL CITY ENGINEERING PC7115304/04/2024
Building Lifecycle
All (58)Filed (4)Permit Issued (5)Signed Off (3)Violation (21)Inspection (3)Special Inspection (22)
05/05/2026
Violation issued (HPD, closed)
A
11/20/2025
Violation issued (HPD, closed)
I
10/21/2025
Signed off — Alteration
B00323534-I1
08/15/2025
Signed off — Alteration
Modification of existing sprinkler. No change of use, occupancy and egress
B01027546-I1
07/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/22/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/22/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
05/01/2024
Permit issued — Sprinklers
B01027546-I1-EW-SP
04/10/2024
Signed off — Alteration
INSTALL HVAC SYSTEM FOR A RESIDENTIAL BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00934152-I1
04/10/2024
Violation issued (HPD, closed)
A
04/05/2024
Special inspection requirement — Mechanical Systems
Zhao Deng
04/05/2024
Special inspection requirement — Ventilation and air distribution system
Zhao Deng
04/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
Zhao Deng
04/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Zhao Deng
04/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
Zhao Deng
04/05/2024
Special inspection requirement — Maintenance information
Zhao Deng
04/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Zhao Deng
04/05/2024
Special inspection requirement — Final
Zhao Deng
04/05/2024
Special inspection requirement — Heating Systems
Zhao Deng
04/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
04/04/2024
Filed — Alteration
INSTALL HVAC SYSTEM FOR A RESIDENTIAL BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00934152-P1
04/03/2024
Filed — Alteration
Modification of existing sprinkler. No change of use, occupancy and egress
B01027546-I1
04/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
03/28/2024
Special inspection requirement — Ventilation and air distribution system
Zhao Deng
03/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
Zhao Deng
03/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
Zhao Deng
03/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Zhao Deng
03/28/2024
Special inspection requirement — Maintenance information
Zhao Deng
03/28/2024
Special inspection requirement — Final
Zhao Deng
03/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Zhao Deng
03/28/2024
Special inspection requirement — Mechanical Systems
Zhao Deng
03/28/2024
Special inspection requirement — Heating Systems
Zhao Deng
03/28/2024
Special inspection requirement — Sprinkler Systems
Zhao Deng
03/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
01/09/2024
Permit issued — Mechanical Systems
B00934152-I1-MS
11/21/2023
Violation issued (HPD, closed)
I
10/04/2023
Filed — Alteration
INSTALL HVAC SYSTEM FOR A RESIDENTIAL BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00934152-I1
05/03/2023
Permit issued — Construction Fence
B00323534-I1-FN
03/23/2023
Violation issued (HPD, closed)
A
02/25/2022
Violation issued (HPD, closed)
A
02/25/2022
Violation issued (HPD, closed)
I
01/12/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/12/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/09/2021
Violation issued (HPD, closed)
I
04/09/2021
Violation issued (HPD, closed)
A
06/08/2020
Permit issued — Construction Fence
B00323534-I1-FN
03/03/2020
Permit issued — Construction Fence
B00323534-I1-FN
02/28/2020
Filed — Alteration
B00323534-I1
11/13/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2019
Violation issued (HPD, closed)
I
08/21/2019
Violation issued (ECB, closed)
Construction
07/24/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/23/2019
Violation issued (ECB, closed)
Construction
10/18/2018
Violation issued (HPD, closed)
I
11/24/2017
Violation issued (HPD, closed)
I
11/10/2016
Violation issued (HPD, closed)
I
10/09/2015
Violation issued (HPD, closed)
I
02/23/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP05/01/2024
DOB NOWMechanical SystemsSigned-offKLE CONSTRUCTION INC01/09/2024
DOB NOWConstruction FenceSigned-offKLE CONSTRUCTION INC05/03/2023
DOB NOWConstruction FenceSigned-offSMVP MGMT INC06/08/2020
DOB NOWConstruction FenceSigned-offSMVP MGMT INC03/03/2020
BISPLISSUEDCROSSFIELD PLBG.&HTG11/29/2023
BISOTISSUEDKLE CONSTRUCTION INC11/27/2023
BISOTISSUEDKLE CONSTRUCTION INC06/15/2023
BISEQISSUEDCUBE BUILDERS GROUP NY04/13/2021
BISMHISSUEDCUBE BUILDERS GROUP NY04/13/2021
BISMHISSUEDSMVP MGMT INC07/08/2020
BISOTISSUEDSMVP MGMT INC06/12/2020
BISEQISSUEDSMVP MGMT INC02/12/2020
BISOTISSUEDSMVP MGMT INC02/12/2020
BISMHISSUEDTCJ CONSTRUCTION INC09/04/2019
BISEQISSUEDTCJ CONSTRUCTION INC09/04/2019
BISPLISSUEDSO PLUMBING & HEATING INC04/08/2019
BISMHISSUEDTCJ CONSTRUCTION INC08/27/2018
BISOTISSUEDTCJ CONSTRUCTION INC08/17/2018
BISEQISSUEDTCJ CONSTRUCTION INC08/13/2018
1 project · most recent 09/27/2024
General Wiring
FiledStatusContractorScope
09/27/2024CompleteHV ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/22/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
04/05/2024Mechanical SystemsZhao Dengspecial
04/05/2024Ventilation and air distribution systemZhao Dengenergy_progress
04/05/2024HVAC-R and service water heating system controlsZhao Dengenergy_progress
04/05/2024HVAC-R and service water piping design and insulationZhao Dengenergy_progress
04/05/2024HVAC-R and service water heating equipmentZhao Dengenergy_progress
04/05/2024Maintenance informationZhao Dengenergy_progress
04/05/2024Energy Code Compliance InspectionsZhao Dengprogress
04/05/2024FinalZhao Dengprogress
04/05/2024Heating SystemsZhao Dengspecial
04/05/2024Fire-Resistant Penetrations and JointsZhao Dengspecial
04/03/2024Fire-Resistant Penetrations and JointsZhao Dengspecial
03/28/2024Ventilation and air distribution systemZhao Dengenergy_progress
03/28/2024HVAC-R and service water heating system controlsZhao Dengenergy_progress
03/28/2024HVAC-R and service water heating equipmentZhao Dengenergy_progress
03/28/2024HVAC-R and service water piping design and insulationZhao Dengenergy_progress
03/28/2024Maintenance informationZhao Dengenergy_progress
03/28/2024FinalZhao Dengprogress
03/28/2024Energy Code Compliance InspectionsZhao Dengprogress
03/28/2024Mechanical SystemsZhao Dengspecial
03/28/2024Heating SystemsZhao Dengspecial
03/28/2024Sprinkler SystemsZhao Dengspecial
03/28/2024Fire-Resistant Penetrations and JointsZhao Dengspecial
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/26/2026B00934152-P1Request digital key ↗
08/26/2026B00934152-I1Request digital key ↗
08/25/2026B01027546-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00323534-I1Request digital key ↗
▸Applications & Permits34
▸BISPLAN / WORK APPROVAL APPLICATION18
07/02/2024340624364Open ↗
06/27/2024340624364Open ↗
01/11/2023340624364Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION15
12/01/2023340624364Open ↗
06/29/2023340624364Open ↗
04/15/2021340624364Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/16/2019340624364Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT I: CERTIFICATION1
09/11/2017321578949Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/11/2017321578949Open ↗
▸BISZONING DIAGRAM1
09/19/2017321578949Open ↗
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00934152-P1Open ↗
09/01/2026B00934152-P1Open ↗
09/01/2026B00934152-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
11/07/2019340624364Open ↗
09/14/2017321642683Open ↗
09/11/2017321578949Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00934152-P1Open ↗
08/26/2026B00934152-I1Open ↗
08/13/2026B01027546-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00934152-P1Open ↗
09/01/2026B00934152-P1Open ↗
09/01/2026B00934152-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/11/2018340624364Open ↗
09/14/2017321642683Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/11/2018340624364Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/14/2017321642683Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/11/2018340624364Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING3
06/27/2024340624364Open ↗
08/12/2019340624364Open ↗
08/11/2018340624364Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
09/14/2017321642683Open ↗
09/08/2017321578949Open ↗
06/02/2017321578949Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
09/11/2017321578949Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026B00934152-P1Open ↗
08/26/2026B00934152-I1Open ↗
08/13/2026B01027546-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/11/2018340624364Open ↗
09/11/2017321578949Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/14/2017321642683Open ↗
09/11/2017321578949Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/19/2021340624364Open ↗
08/11/2018340624364Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/11/2018340624364Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/05/2024340624364Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/19/2021340624364Open ↗
08/11/2018340624364Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/05/2024340624364Open ↗
▸BISMECHANICAL SYSTEMS1
08/05/2024340624364Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
08/05/2024340624364Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
08/05/2024340624364Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/05/2024340624364Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
09/11/2017321578949Open ↗
▸BISMASONRY1
08/05/2024340624364Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSUPERSEDING LETTER6
12/01/2023340624364Open ↗
06/29/2023340624364Open ↗
04/15/2021340624364Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
09/08/2017321578949Open ↗
06/02/2017321578949Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
08/11/2018340624364Open ↗
09/14/2017321642683Open ↗
09/11/2017321578949Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION4
07/02/2024340624364Open ↗
02/17/2021340624364Open ↗
11/06/2019340624364Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
06/29/2023340624364Open ↗
04/15/2021340624364Open ↗
04/15/2021340624364Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
09/14/2017321642683Open ↗
09/14/2017321578949Open ↗
06/02/2017321578949Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/11/2018340624364Open ↗
▸Other Documents2
▸BISSTRUCTURAL COLD-FORMED STEEL2
08/05/2024340624364Open ↗
08/05/2024340624364Open ↗