Two family frame
379 MC CLEAN AVENUE
STATEN ISLAND · BIN 5047991
💬 Discuss this project
2024Year Built
2Stories
B2Building Class
R3XZoning
2,700 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 4,040 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 7 docs
Floor 25p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RSTA HOLDINGS2307/08/2026
DELTAMER203/22/2026
MCCLEAN HOLDINGS803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AVID DESIGNS, INC802/13/2025
JAMES A CLANCY103/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DELTAMER, INCGeneral Contractor407/08/2026
WILLIAM REYNOLDSGeneral Contractor303/21/2026
DV PLUMBING INCPlumbing107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738202/13/2025
AVID DESIGNS, INC.453409/25/2024
ETRECTE LLC8116103/13/2024
Building Lifecycle
All (91)Filed (9)Permit Issued (7)Signed Off (4)Violation (4)Inspection (12)Objection (42)Special Inspection (13)
02/13/2025
Filed — New Building
CURB CUT 10' - 7 FOOT WITH TWO 18" SPLAYS
S00828906-P4
11/04/2024
Signed off — New Building
CURB CUT 10' - 7 FOOT WITH TWO 18" SPLAYS
S00828906-S2
10/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Geary
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Geary
09/25/2024
Filed — New Building
CURB CUT 10' - 7 FOOT WITH TWO 18" SPLAYS
S00828906-P3
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Geary
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Geary
09/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/29/2024
Filed — New Building
CURB CUT 10' - 7 FOOT WITH TWO 18" SPLAYS
S00828906-P2
08/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Geary
08/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Geary
08/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/01/2024
Signed off — New Building
CURB CUT 10' - 7 FOOT WITH TWO 18" SPLAYS
S00828906-S1
07/31/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/23/2024
Permit issued — Curb Cut
S00828906-S1-CC
06/10/2024
Signed off — Alteration
S01015838-I1
05/16/2024
Permit issued — Solar
S01015838-I1-SL
03/20/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/13/2024
Filed — Alteration
S01015838-I1
03/11/2024
Signed off — Alteration
S00834012-I1
03/07/2024
Permit issued — Plumbing
S00828906-S2-PL
03/07/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/06/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
03/06/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
03/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
03/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
03/06/2024
Special inspection requirement — Final
James Clancy
01/16/2024
Violation issued (ECB, closed)
Construction
01/16/2024
Violation issued (ECB, closed)
Unknown
12/22/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/21/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/18/2023
Permit issued — Plumbing
S88991539-S2-PL
12/06/2023
Filed — New Building
CURB CUT 10' - 7 FOOT WITH TWO 18" SPLAYS
S00828906-P1
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Geary
11/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Geary
10/18/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/18/2023
Objection resolved — Addressed
10/12/2023
Permit issued — Plumbing
S00828906-S2-PL
10/04/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/29/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/27/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/20/2023
Permit issued — General Construction
S00828906-I1-GC-CX
08/08/2023
Objection raised — Other
08/08/2023
Objection resolved — Addressed
07/26/2023
Objection raised — Other
07/26/2023
Objection resolved — Addressed
07/26/2023
Objection raised — Other
07/26/2023
Objection resolved — Addressed
07/26/2023
Objection raised — Other
07/26/2023
Objection resolved — Addressed
06/13/2023
Objection raised — Other
06/13/2023
Objection resolved — Addressed
05/26/2023
Objection resolved — Addressed
05/26/2023
Objection resolved — Addressed
05/23/2023
Objection raised — Inspections
05/23/2023
Objection resolved — Addressed
05/23/2023
Objection raised — Zoning
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offDELTAMER, INC07/23/2024
DOB NOWSolarSigned-offWILLIAM REYNOLDS05/16/2024
DOB NOWPlumbingSigned-offDV PLUMBING INC03/07/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC12/18/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR10/12/2023
DOB NOWGeneral ConstructionPermit IssuedDELTAMER, INC09/20/2023
DOB NOWConstruction FenceSigned-offDELTAMER, INC03/20/2023
BIS—ISSUEDSKEN SERVICES CORP06/30/2023
1 project · most recent 02/13/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/13/2025Signed-offDELTAMER, INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Luxaire TM9E120D20MP12B 120 BTU · Furnace ×2
Z8ES100B12SMPS1A 60 BTU · Furnace ×2
Ventilation
__Junk__ Ver150 350 CFM · Erv ×4
1 project · most recent 02/13/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/13/2025Signed-offDV PLUMBING INCGas, Storm, Water/Sanitary
2 projects · most recent 03/06/2024
General Wiring
FiledStatusContractorScope
03/06/2024CompleteJSP ELECTL CNTNG CORP—
01/03/2024CompleteA & R ELEC'L CONTR'G INC.General Wiring
1 project · most recent 02/13/2025
Wood
FiledStatusContractorScope
02/13/2025Signed-offDELTAMER, INCWood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
09/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/31/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/22/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/21/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2023Pass-Final PL - UndergroundPassView ↗
10/04/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/29/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/09/2024Energy Code Compliance InspectionsJeffrey Gearyprogress
10/09/2024Fire-Resistant Penetrations and JointsJeffrey Gearyspecial
09/25/2024Fire-Resistant Penetrations and JointsJeffrey Gearyspecial
09/25/2024Energy Code Compliance InspectionsJeffrey Gearyprogress
08/26/2024Energy Code Compliance InspectionsJeffrey Gearyprogress
08/26/2024Fire-Resistant Penetrations and JointsJeffrey Gearyspecial
03/06/2024Air barrier - visual inspectionJames Clancyenergy_progress
03/06/2024Energy Code Compliance InspectionsJames Clancyprogress
03/06/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
03/06/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
03/06/2024FinalJames Clancyprogress
11/21/2023Fire-Resistant Penetrations and JointsJeffrey Gearyspecial
11/21/2023Energy Code Compliance InspectionsJeffrey Gearyprogress
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026S00834012-I1Request digital key ↗
08/22/2026S00828906-P4Request digital key ↗
08/22/2026S00828906-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
10/17/2023540251305Open ↗
02/16/2023520469154Open ↗
▸BISWORK PERMIT APPLICATION1
06/30/2023520469154Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/17/2023540251305Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWRestrictive Declaration/Easement 17
08/22/2026S00828906-P1Open ↗
08/22/2026S00828906-S2Open ↗
08/22/2026S00828906-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026S00828906-I1Open ↗
08/13/2026S00828906-P4Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026S00828906-I1Open ↗
08/13/2026S00828906-P4Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026S00828906-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026S00834012-I1Open ↗
08/22/2026S00828906-S1Open ↗
08/22/2026S00828906-P4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/25/2026S00828906-P1Open ↗
09/01/2026S01015838-I1Open ↗
09/01/2026S01015838-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/25/2026S00828906-P1Open ↗
09/01/2026S01015838-I1Open ↗
08/27/2026S00828906-P3Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/17/2023540251305Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/17/2023540251305Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026S00828906-I1Open ↗
08/13/2026S00828906-P4Open ↗
▸BISGAS CUT-OFF1
06/30/2023520469154Open ↗
▸BISSEWER CUT-OFF1
06/30/2023520469154Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
06/30/2023520469154Open ↗
▸BISELECTRIC CUT-OFF1
06/30/2023520469154Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist2
08/15/2026S00828906-I1Open ↗
08/13/2026S00828906-P4Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/30/2023520469154Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/30/2023520469154Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026S00828906-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026S00828906-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026S00828906-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/30/2023520469154Open ↗
▸BISRODENT CONTROL1
06/30/2023520469154Open ↗
▸Inspections & Test Reports3
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
10/17/2023540251305Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/17/2023540251305Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/15/2026S00828906-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/30/2023520469154Open ↗
06/30/2023520469154Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/17/2023540251305Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/30/2023520469154Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01015838-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/30/2023520469154Open ↗
▸BISWC-DB-100 (Replaces Form C-105-21)Affidavit for NY Entities And Any Out of State Entities with no employees1
06/30/2023520469154Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
06/30/2023520469154Open ↗
▸BISEFILING COVER SHEET1
02/16/2023520469154Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/17/2023540251305Open ↗
▸Other Documents16
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
06/30/2023520469154Open ↗
06/30/2023520469154Open ↗
06/30/2023520469154Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
10/17/2023540251305Open ↗
10/17/2023540251305Open ↗
▸DOB NOWSite Survey: Initial2
08/15/2026S00828906-I1Open ↗
08/13/2026S00828906-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026S00828906-I1Open ↗
08/13/2026S00828906-P4Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026S00828906-P4Open ↗
08/15/2026S00828906-I1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
10/17/2023540251305Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
10/17/2023540251305Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
06/30/2023520469154Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/17/2023540251305Open ↗
▸DOB NOWFinal Survey1
08/15/2026S00828906-I1Open ↗