Two family frame
37A WIEDERER PLACE
STATEN ISLAND · BIN 5016261
💬 Discuss this project
2025Year Built
2Stories
B2Building Class
R3AZoning
2,508 sfGross Floor Area
2Units
Two family frame · Owner of record: JAVES DEVELOPMENT LLC · 3,750 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FOSTER DEVELOPMENT1407/08/2026
FOSTER DEVELOPMENT.LLC1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEADFAST CONSTRUCTION LLGeneral Contractor607/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/07/2026
C&P DESIGN CONSULTANT8472508/11/2025
Building Lifecycle
All (61)Filed (9)Permit Issued (7)Signed Off (5)Inspection (10)Special Inspection (30)
06/26/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01379640-I1
04/14/2026
Permit issued — Solar
S01379640-I1-SL
04/07/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01379640-I1
04/07/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/27/2026
Special inspection requirement — Final
Walid Abdulla
03/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/15/2025
Signed off — New Building
PROPOSED INSTALLATION OF 9' CURB CUTFOR A NEW DETACHED TWO FAMILY RESIDENCE.
S01121982-S2
10/01/2025
Signed off — New Building
PROPOSED INSTALLATION OF 9' CURB CUTFOR A NEW DETACHED TWO FAMILY RESIDENCE.
S01121982-S5
09/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/30/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/04/2025
Signed off — New Building
PROPOSED INSTALLATION OF 9' CURB CUTFOR A NEW DETACHED TWO FAMILY RESIDENCE.
S01121982-S1
09/04/2025
Permit issued — Mechanical Systems
S01121982-S2-MS
08/11/2025
Filed — New Building
PROPOSED INSTALLATION OF 9' CURB CUTFOR A NEW DETACHED TWO FAMILY RESIDENCE.
S01121982-P2
08/11/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
08/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Final
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
08/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
08/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Lighting in dwelling units
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
08/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Protection of exposed foundation insulation
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
08/11/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
08/06/2025
Permit issued — Curb Cut
S01121982-S5-CC
08/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/30/2025
Filed — New Building
PROPOSED INSTALLATION OF 9' CURB CUTFOR A NEW DETACHED TWO FAMILY RESIDENCE.
S01121982-S5
07/22/2025
Signed off — New Building
PROPOSED INSTALLATION OF 9' CURB CUTFOR A NEW DETACHED TWO FAMILY RESIDENCE.
S01121982-S4
05/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/02/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/01/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/24/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/12/2025
Permit issued — Plumbing
S42849901-S1-PL
03/10/2025
Permit issued — Construction Fence
S01121982-S4-FN
03/09/2025
Permit issued — Mechanical Systems
S01121982-I1-GC-CX
03/06/2025
Filed — New Building
PROPOSED INSTALLATION OF 9' CURB CUTFOR A NEW DETACHED TWO FAMILY RESIDENCE.
S01121982-S4
03/05/2025
Permit issued — Plumbing
S01121982-S1-PL
01/10/2025
Filed — New Building
PROPOSED INSTALLATION OF 9' CURB CUTFOR A NEW DETACHED TWO FAMILY RESIDENCE.
S01121982-P1
01/07/2025
Filed — New Building
PROPOSED INSTALLATION OF 9' CURB CUTFOR A NEW DETACHED TWO FAMILY RESIDENCE.
S01121982-S3
12/09/2024
Filed — New Building
PROPOSED INSTALLATION OF 9' CURB CUTFOR A NEW DETACHED TWO FAMILY RESIDENCE.
S01121982-S2
11/25/2024
Filed — New Building
PROPOSED INSTALLATION OF 9' CURB CUTFOR A NEW DETACHED TWO FAMILY RESIDENCE.
S01121982-S1
11/01/2024
Filed — New Building
PROPOSED INSTALLATION OF 9' CURB CUTFOR A NEW DETACHED TWO FAMILY RESIDENCE.
S01121982-I1
09/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/14/2026
DOB NOWMechanical SystemsSigned-offSTEADFAST CONSTRUCTION LL09/04/2025
DOB NOWCurb CutSigned-offSTEADFAST CONSTRUCTION LL08/06/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR03/12/2025
DOB NOWConstruction FenceSigned-offSTEADFAST CONSTRUCTION LL03/10/2025
DOB NOWMechanical SystemsPermit IssuedSTEADFAST CONSTRUCTION LL03/09/2025
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC03/05/2025
1 project · most recent 08/11/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/11/2025Signed-offSTEADFAST CONSTRUCTION LLHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Tosot AHU: TUD36-24AH2ADU - HP: TU36-24WADU - 3-TON UNIT INSTALLED 47,000 BTU · Heat Pump Outdoor ×1
AHU: TUD60-24AH2ADU - HP: TU60-24WADU 55,000 BTU · Heat Pump Outdoor ×1
N/A N/A 16,000 BTU · Heat Pump Outdoor ×1
Ventilation
Fantech AEV80 70 CFM · Erv ×1
AEV80 - 92 CFM UNIT INSTALLED 100 CFM · Erv ×1
N/A N/A 30 CFM · Erv ×1
1 project · most recent 08/11/2025
Storm Water/Sanitary
FiledStatusContractorScope
08/11/2025Signed-offQUALITY PLUMBING, INCStorm, Water/Sanitary
2 projects · most recent 04/07/2026
General Wiring
FiledStatusContractorScope
04/07/2026CompleteSUNRUN SOLAR ELECTL CORP—
05/13/2025CompleteJ.P.E. ELEC'L CONTR'S INCGeneral Wiring
1 project · most recent 08/11/2025
Concrete Wood
FiledStatusContractorScope
08/11/2025Signed-offSTEADFAST CONSTRUCTION LLConcrete, Wood
1 project · most recent 08/11/2025
Fence
FiledStatusContractorScope
08/11/2025Signed-offSTEADFAST CONSTRUCTION LLFence
1 project · most recent 08/11/2025
Earthwork
FiledStatusContractorScope
08/11/2025Signed-offSTEADFAST CONSTRUCTION LLEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/30/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/14/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/02/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/01/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/24/2025Pass-Final PL - UndergroundPassView ↗
09/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
04/07/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/07/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/27/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/27/2026FinalWalid Abdullaprogress
03/27/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/11/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
08/11/2025Mechanical SystemsStanislav Pilipenkospecial
08/11/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
08/11/2025Subgrade InspectionsStanislav Pilipenkospecial
08/11/2025Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
08/11/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
08/11/2025FinalStanislav Pilipenkoprogress
08/11/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
08/11/2025Footing and FoundationStanislav Pilipenkoprogress
08/11/2025Structural Wood FrameStanislav Pilipenkoprogress
08/11/2025Fenestration areasStanislav Pilipenkoenergy_progress
08/11/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
08/11/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
08/11/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
08/11/2025Interior lighting powerStanislav Pilipenkoenergy_progress
08/11/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
08/11/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
08/11/2025Lighting in dwelling unitsStanislav Pilipenkoenergy_progress
08/11/2025Maintenance informationStanislav Pilipenkoenergy_progress
08/11/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
Latest 25 of 56.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026S01379640-I1Request digital key ↗
08/20/2026S01121982-I1Request digital key ↗
08/18/2026S01121982-S3Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
08/27/2025540264836Open ↗
01/09/2025540264836Open ↗
01/09/2025540264836Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/07/2024540264836Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/20/2026S01121982-I1Open ↗
08/13/2026S01121982-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/20/2026S01121982-I1Open ↗
08/13/2026S01121982-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026S01121982-I1Open ↗
08/13/2026S01121982-P2Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026S01121982-P1Open ↗
09/02/2026S01121982-P1Open ↗
08/28/2026S01379640-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026S01379640-I1Open ↗
08/20/2026S01121982-I1Open ↗
08/18/2026S01121982-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026S01121982-P1Open ↗
08/28/2026S01379640-I1Open ↗
08/28/2026S01379640-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/24/2024540264836Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/20/2026S01121982-I1Open ↗
08/13/2026S01121982-P2Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/20/2026S01121982-I1Open ↗
08/13/2026S01121982-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01121982-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01121982-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01121982-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/20/2026S01121982-I1Open ↗
08/13/2026S01121982-P2Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
09/24/2024540264836Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01121982-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/07/2024540264836Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/26/2026S01379640-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/09/2025540264836Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/20/2026S01121982-I1Open ↗
08/13/2026S01121982-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026S01121982-I1Open ↗
08/13/2026S01121982-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026S01121982-I1Open ↗
08/13/2026S01121982-P2Open ↗
▸BISWAIVER OF MIN. 7 FEET BETWEEN CC & FIREHYD.1
10/07/2024540264836Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
10/07/2024540264836Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/24/2024540264836Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01121982-I1Open ↗