← Back
BuildNYC
Two stories - detached, small or mid-size
38-11 255TH STREET
QUEENS · BIN 4169747
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R2AZoning
3,124 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof5p · 2 filings · 20 docs
Floor 211p · 2 filings · 20 docs
Floor 112p · 2 filings · 20 docs
Cellar12p · 2 filings · 20 docs
Site & exteriorConstruction fence4p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/06/2021$760K—Private party → Private party$243/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Synergic Design Architects104/16/2024
Mehdi Ghazi, P.E502/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ibuild Consulting1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Archlink DesignGeneral Contractor1203/21/2026
Archlink DesignScaffold204/09/2026
R & T ElectricalElectrical103/22/2026
Accord PowerGeneral Contractor103/21/2026
Mes ConstructionPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Synergic Design8561104/16/2024
Mehdi Ghazi, P.E7129402/20/2024
Triangle Inspection & Tes7495204/21/2023
Building Lifecycle
All (58)Filed (6)Permit Issued (8)Signed Off (3)Violation (3)Inspection (6)Objection (2)Special Inspection (30)
01/26/2026
Signed off — Alteration
Q00547805-I1
06/26/2024
Signed off — Alteration
Q01034521-I1
06/10/2024
Permit issued — Structural
Q00547793-I1-GC-CX
04/26/2024
Permit issued — Solar
Q01034521-I1-SL
04/16/2024
Filed — Alteration
Q01034521-I1
04/02/2024
Signed off — Alteration
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00547811-I1
03/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/05/2024
Special inspection requirement — Permanent certificate
MEHDI GHAZI
03/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
03/05/2024
Special inspection requirement — Interior lighting power
MEHDI GHAZI
03/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
03/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
03/05/2024
Special inspection requirement — Electric vehicle service equipment requirements
MEHDI GHAZI
03/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
03/05/2024
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
03/05/2024
Special inspection requirement — Chimneys and vents
MEHDI GHAZI
03/05/2024
Special inspection requirement — Structural Steel - Welding
MEHDI GHAZI
03/05/2024
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
03/05/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
03/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
03/05/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/05/2024
Special inspection requirement — Structural Steel - Details
MEHDI GHAZI
03/05/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
03/05/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
MEHDI GHAZI
03/05/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MEHDI GHAZI
03/05/2024
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
03/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
03/05/2024
Special inspection requirement — Masonry
MEHDI GHAZI
03/05/2024
Special inspection requirement — Heating Systems
MEHDI GHAZI
03/05/2024
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
03/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
03/05/2024
Special inspection requirement — Final
MEHDI GHAZI
03/05/2024
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
03/05/2024
Special inspection requirement — Air barrier — testing
MEHDI GHAZI
03/05/2024
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
03/05/2024
Special inspection requirement — Fenestration areas
MEHDI GHAZI
03/05/2024
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
02/20/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ENLARGEMENT FOR EXISTING SINGLE-FAMILY DETACHED RESIDENCE.
Q00547793-P1
06/23/2023
Permit issued — General Construction
Q00547793-I1-GC-CX
06/23/2023
Permit issued — Construction Fence
Q00547805-I1-FN
04/27/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/21/2023
Filed — Alteration
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00547811-P1
03/10/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/28/2023
Permit issued — Plumbing
Q00547811-I1-PL
12/16/2022
Violation issued (ECB, closed)
Construction
11/28/2022
Violation issued (ECB, closed)
Construction
11/28/2022
Violation issued (ECB, closed)
Construction
11/18/2022
Permit issued — Foundation
Q00547793-I1-GC-CX
11/09/2022
Filed — Alteration
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00547811-I1
10/27/2022
Permit issued — Foundation
Q00547793-I1-GC-CX
10/24/2022
Permit issued — Construction Fence
Q00547805-I1-FN
11/22/2021
Filed — Alteration
Q00547805-I1
08/05/2021
Objection raised — Scope
08/05/2021
Objection resolved — Addressed
08/01/2021
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ENLARGEMENT FOR EXISTING SINGLE-FAMILY DETACHED RESIDENCE.
Q00547793-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedArchlink Design06/10/2024
DOB NOWSolarSigned-offAccord Power04/26/2024
DOB NOWGeneral ConstructionPermit IssuedArchlink Design06/23/2023
DOB NOWConstruction FenceSigned-offArchlink Design06/23/2023
DOB NOWPlumbingSigned-offMes Construction02/28/2023
DOB NOWFoundationPermit IssuedArchlink Design11/18/2022
DOB NOWFoundationPermit IssuedArchlink Design10/27/2022
DOB NOWConstruction FenceSigned-offArchlink Design10/24/2022
1 project · most recent 02/20/2024
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/20/2024Permit IssuedArchlink DesignHeating Systems, Ventilation Systems
Heating
Williamson GWA-175 175,000 BTU · Boiler ×1
Ventilation
Delta Breeze SLM 50 50 CFM · Exhaust Fan ×7
3 projects · most recent 04/26/2024
General Wiring
FiledStatusContractorScope
04/26/2024CompletePower Surge Electric—
04/14/2024CompleteR & T ElectricalGeneral Wiring
11/07/2022CompleteR & T Electrical—
1 project · most recent 02/20/2024
Steel Masonry Wood
FiledStatusContractorScope
02/20/2024Permit IssuedArchlink DesignSteel, Masonry, Wood
1 project · most recent 02/20/2024
Earthwork
FiledStatusContractorScope
02/20/2024Permit IssuedArchlink DesignEarthwork
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/27/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/10/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
03/05/2024HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
03/05/2024Maintenance informationMEHDI GHAZIenergy_progress
03/05/2024Fenestration air leakageMEHDI GHAZIenergy_progress
03/05/2024MeteringMEHDI GHAZIenergy_progress
03/05/2024Duct leakage testing, insulation and designMEHDI GHAZIenergy_progress
03/05/2024Air barrier - visual inspectionMEHDI GHAZIenergy_progress
03/05/2024Insulation placement and R valuesMEHDI GHAZIenergy_progress
03/05/2024Permanent certificateMEHDI GHAZIenergy_progress
03/05/2024Structural Wood FrameMEHDI GHAZIprogress
03/05/2024Chimneys and ventsMEHDI GHAZIspecial
03/05/2024Structural Steel - WeldingMEHDI GHAZIspecial
03/05/2024Concrete - Cast-In-PlaceMEHDI GHAZIspecial
03/05/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
03/05/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
03/05/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/05/2024Structural Steel - DetailsMEHDI GHAZIspecial
03/05/2024Excavations - Sheeting, Shoring, and BracingMEHDI GHAZIspecial
03/05/2024Wall Panels, Curtain Walls, and VeneersMEHDI GHAZIspecial
03/05/2024Structural Steel - High Strength BoltingMEHDI GHAZIspecial
03/05/2024Mechanical SystemsMEHDI GHAZIspecial
03/05/2024Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
03/05/2024MasonryMEHDI GHAZIspecial
03/05/2024Heating SystemsMEHDI GHAZIspecial
03/05/2024Footing and FoundationMEHDI GHAZIprogress
03/05/2024Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
Latest 25 of 86.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00547805-I1Request digital key ↗
08/25/2026Q00547811-P1Request digital key ↗
08/25/2026Q00547811-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
11/02/2021440693732Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/02/2021440693732Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00547793-P1Open ↗
08/13/2026Q00547793-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00547793-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026Q00547793-P1Open ↗
09/02/2026Q00547793-P1Open ↗
09/02/2026Q00547793-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026Q00547793-P1Open ↗
09/02/2026Q00547793-P1Open ↗
09/02/2026Q00547811-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00547805-I1Open ↗
08/25/2026Q00547811-P1Open ↗
08/25/2026Q00547811-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/02/2021440693732Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/02/2021440693732Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00547793-P1Open ↗
08/13/2026Q00547793-I1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
11/02/2021440693732Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00547793-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026Q00547811-I1Open ↗
08/25/2026Q00547811-P1Open ↗
08/23/2026Q00547793-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00547793-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q00547793-I1Open ↗
08/13/2026Q00547793-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00547793-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00547793-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
11/02/2021440693732Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01034521-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
11/02/2021440693732Open ↗
▸BISADDITIONAL INFORMATION1
03/24/2022440693732Open ↗
▸Other Documents9
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00547793-P1Open ↗
08/13/2026Q00547793-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00547793-I1Open ↗
08/13/2026Q00547793-P1Open ↗
▸BISNYS DEC TIDAL WETLANDS MAP1
11/02/2021440693732Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
11/02/2021440693732Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/24/2022440693732Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00547793-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00547793-I1Open ↗