← Back
Community center
QAYS Queensbridge Day Care Center
38-11 27 STREET · BIN 4004679
💬 Discuss this project
1972Year Built
2Stories
P5Building Class
M1-2/R5BZoning
20,788 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Community center · Owner of record: JABB CORONA AVENUE LLC · 11,000 sf lot · 1.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof19p · 3 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 19p · 1 filing · 16 docs
Basement4p · 1 filing · 20 docs
Sub-Basement9p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3811 27 STREET JABB CORON103/22/2026
JABB103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PALETTE ARCHITECTURE303/24/2023
LL ENGINEERING PC207/27/2022
IVAN DESIGN ENG. ANALYSIS, PLLC207/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PALCO MECHANICAL LLCGeneral Contractor903/21/2026
FPL FABRICATORS & ERECTORSGeneral Contractor303/21/2026
MOLLER, GEORGEElectrical203/21/2026
NYC IRONWORKERS LOCAL 40Electrical203/21/2026
ISLAND ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688207/27/2022
Z & T ENGINEERING, P.C.591208/24/2021
Building Lifecycle
All (53)Filed (7)Permit Issued (4)Signed Off (1)Violation (10)Inspection (1)Special Inspection (30)
08/19/2024
Signed off — Alteration
WORK ASSOCIATED WITH THE REPLACEMENT OF ROOFTOP UNITS, ROOF RESURFACING, AND REPLACEMENT OF FENCE MESH. MAINTENANCE REPLACEMENTS AND UPGRADES TO AN EXISTING AND OCCUPIED DAY CARE FACILITY AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q00545378-I1
04/10/2024
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
03/28/2023
Special inspection requirement — Exterior lighting power
Fei Zeng
03/28/2023
Special inspection requirement — Final
John Sunwoo
03/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
03/28/2023
Special inspection requirement — Insulation placement and R values
Fei Zeng
03/28/2023
Special inspection requirement — Interior lighting power
Fei Zeng
03/28/2023
Special inspection requirement — Maintenance information
Fei Zeng
03/24/2023
Filed — Alteration
WORK ASSOCIATED WITH THE REPLACEMENT OF ROOFTOP UNITS, ROOF RESURFACING, AND REPLACEMENT OF FENCE MESH. MAINTENANCE REPLACEMENTS AND UPGRADES TO AN EXISTING AND OCCUPIED DAY CARE FACILITY AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q00545378-P2
03/20/2023
Special inspection requirement — Interior lighting power
SEBASTIAN SETTEDUCATE JR., P.E
03/20/2023
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
03/20/2023
Special inspection requirement — Final
John Sunwoo
03/20/2023
Special inspection requirement — Exterior lighting power
SEBASTIAN SETTEDUCATE JR., P.E
03/20/2023
Special inspection requirement — Insulation placement and R values
SEBASTIAN SETTEDUCATE JR., P.E
03/20/2023
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
07/29/2022
Permit issued — Mechanical Systems
Q00545416-I1-MS
07/28/2022
Special inspection requirement — Ventilation and air distribution system
Fei Zeng
07/28/2022
Special inspection requirement — Duct leakage testing, insulation and design
Fei Zeng
07/28/2022
Special inspection requirement — Mechanical Systems
Fei Zeng
07/28/2022
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
07/28/2022
Special inspection requirement — Final
Fei Zeng
07/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fei Zeng
07/28/2022
Special inspection requirement — Maintenance information
Fei Zeng
07/27/2022
Filed — Alteration
REPLACEMENT OF HVAC UNITS ASSOCIATED WITH ROOF REPLACEMENT WORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00545416-P1
07/27/2022
Permit issued — General Construction
Q00545378-I1-GC
07/20/2022
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
07/20/2022
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
07/20/2022
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
07/20/2022
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
07/20/2022
Special inspection requirement — HVAC-R and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
07/20/2022
Special inspection requirement — Duct leakage testing, insulation and design
SEBASTIAN SETTEDUCATE JR., P.E
07/20/2022
Special inspection requirement — Ventilation and air distribution system
SEBASTIAN SETTEDUCATE JR., P.E
07/18/2022
Special inspection requirement — Structural Steel - Details
Fei Zeng
07/18/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Fei Zeng
07/18/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fei Zeng
07/18/2022
Special inspection requirement — Masonry
Fei Zeng
07/15/2022
Filed — Alteration
WORK ASSOCIATED WITH THE REPLACEMENT OF ROOFTOP UNITS, ROOF RESURFACING, AND REPLACEMENT OF FENCE MESH. MAINTENANCE REPLACEMENTS AND UPGRADES TO AN EXISTING AND OCCUPIED DAY CARE FACILITY AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q00545378-P1
07/15/2022
Filed — Alteration
ASSOCIATED STRUCTRUAL WORK WITH THE MAINTENANCE REPLACEMENTS AND UPGRADES TO ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. IN CONJUNCTION WITH APP Q00545378 AND Q00545416.
Q00545441-P1
03/04/2022
Violation issued (ECB, closed)
Construction
03/04/2022
Violation issued (ECB, closed)
Construction
03/04/2022
Violation issued (ECB, closed)
Construction
11/12/2021
Permit issued — Structural
Q00545441-I1-ST
08/24/2021
Filed — Alteration
REPLACEMENT OF HVAC UNITS ASSOCIATED WITH ROOF REPLACEMENT WORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00545416-I1
08/09/2021
Permit issued — General Construction
Q00545378-I1-GC
08/06/2021
Filed — Alteration
ASSOCIATED STRUCTRUAL WORK WITH THE MAINTENANCE REPLACEMENTS AND UPGRADES TO ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. IN CONJUNCTION WITH APP Q00545378 AND Q00545416.
Q00545441-I1
08/04/2021
Filed — Alteration
WORK ASSOCIATED WITH THE REPLACEMENT OF ROOFTOP UNITS, ROOF RESURFACING, AND REPLACEMENT OF FENCE MESH. MAINTENANCE REPLACEMENTS AND UPGRADES TO AN EXISTING AND OCCUPIED DAY CARE FACILITY AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q00545378-I1
02/04/2020
Violation issued (ECB, open)
Construction
01/29/2018
Violation issued (ECB, closed)
Construction
05/30/2017
Violation issued (ECB, closed)
Construction
05/30/2017
Violation issued (ECB, closed)
Construction
11/07/2016
Violation issued (ECB, open)
Construction
12/15/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2010
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPALCO MECHANICAL LLC07/29/2022
DOB NOWGeneral ConstructionSigned-offPALCO MECHANICAL LLC07/27/2022
DOB NOWStructuralPermit IssuedFPL FABRICATORS & ERECTO*11/12/2021
DOB NOWGeneral ConstructionSigned-offPALCO MECHANICAL LLC08/09/2021
BISMHISSUEDFIRST ATLANTIC CONSTRUCTION CORP05/31/2001
1 job · most recent 07/27/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/27/2022Permit IssuedPALCO MECHANICAL LLCAir Conditioning Systems
Cooling
Johnson Controls J25ZZJN40P2D5RAD1A1 25 tons · Rooftop Unit ×2
V3N552ABD2A1ADECB1 30 tons · Rooftop Unit ×2
1 job · most recent 05/31/2025
Lighting
FiledStatusContractorScope
05/31/2025Permit IssuedISLAND ELECTRIC CORPLighting
1 job · most recent 07/15/2022
Concrete
FiledStatusContractorScope
07/15/2022Permit IssuedFPL FABRICATORS & ERECTO*Concrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/10/2024Pass-Final Construction Permit WithdrawalPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
03/28/2023Exterior lighting powerFei Zengenergy_progress
03/28/2023FinalJohn Sunwooprogress
03/28/2023Energy Code Compliance InspectionsFei Zengprogress
03/28/2023Insulation placement and R valuesFei Zengenergy_progress
03/28/2023Interior lighting powerFei Zengenergy_progress
03/28/2023Maintenance informationFei Zengenergy_progress
03/20/2023Interior lighting powerSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
03/20/2023Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
03/20/2023FinalJohn Sunwooprogress
03/20/2023Exterior lighting powerSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
03/20/2023Insulation placement and R valuesSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
03/20/2023Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
07/28/2022Ventilation and air distribution systemFei Zengenergy_progress
07/28/2022Duct leakage testing, insulation and designFei Zengenergy_progress
07/28/2022Mechanical SystemsFei Zengspecial
07/28/2022Energy Code Compliance InspectionsFei Zengprogress
07/28/2022FinalFei Zengprogress
07/28/2022HVAC-R and service water heating system controlsFei Zengenergy_progress
07/28/2022Maintenance informationFei Zengenergy_progress
07/20/2022Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
07/20/2022Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
07/20/2022FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
07/20/2022Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
07/20/2022HVAC-R and service water heating system controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
07/20/2022Duct leakage testing, insulation and designSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
Latest 25 of 46.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00545378-P2Request digital key ↗
08/26/2026Q00545378-I1Request digital key ↗
08/26/2026Q00545378-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
03/01/2019421892125Open ↗
03/01/2019421892125Open ↗
03/01/2019421896933Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026Q00545378-I1Open ↗
09/01/2026Q00545378-I1Open ↗
09/01/2026Q00545378-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00545378-P2Open ↗
08/26/2026Q00545378-I1Open ↗
08/26/2026Q00545378-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026Q00545416-I1Open ↗
08/24/2026Q00545441-P1Open ↗
08/24/2026Q00545416-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/01/2019421892125Open ↗
03/01/2019421892125Open ↗
03/01/2019421892125Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/01/2019421892125Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
03/01/2019421892125Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026Q00545378-P1Open ↗
08/26/2026Q00545378-P2Open ↗
08/26/2026Q00545378-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice to Proceed7
08/13/2026Q00545441-I1Open ↗
08/13/2026Q00545416-I1Open ↗
08/13/2026Q00545416-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026Q00545441-I1Open ↗
08/13/2026Q00545378-I1Open ↗
08/13/2026Q00545416-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
04/04/2019421892125Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/26/2026Q00545441-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/01/2019421892125Open ↗
03/01/2019421892125Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00545378-I1Open ↗
08/13/2026Q00545416-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/01/2019421896933Open ↗
03/01/2019421892125Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
03/01/2019421892125Open ↗
03/01/2019421892125Open ↗
03/01/2019421896933Open ↗
Showing 3 of 4 on file for this type