Miscellaneous warehouse
38-12 30TH STREET
QUEENS · BIN 4004642
💬 Discuss this project
1930Year Built
2Stories
E9Building Class
M1-2/R5DZoning
4,750 sfGross Floor Area
2Units
0 Active Violations 2 old, status unconfirmed ▸
Miscellaneous warehouse · Owner of record: NY Premier Realty · 2,500 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTradional Manakish Oven7p · 1 filing · 9 docs
Floor 4Pne Realty, LLC1 filing · 19 docs
Floor 3Pne Realty, LLC1 filing · 19 docs
Floor 2
Floor 1Tradional Manakish Oven10p · 4 filings · 20 docs
CellarTradional Manakish Oven3p · 2 filings · 17 docs
Site & exteriorHeavy duty sidewalk shed installation4p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pne Realty310/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A. Giannopoulos Architects209/25/2026
Innation Engineering203/08/2023
Real Creative Motion Engineering SE210/02/2022
Ima Engineering107/29/2022
Green Design201/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ima Engineering1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Boodhoo StevenElectrical203/21/2026
K.A.B. ElectricElectrical203/21/2026
CNF ElectricalElectrical103/21/2026
Roland Mechanical of NY*specialty_contractor107/08/2026
Rennon ConstructionScaffold107/08/2026
Bypass MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A. Giannopoulos Architect2196109/25/2026
AA Building & Inspection1519403/08/2023
Building Lifecycle
All (75)Filed (9)Permit Issued (3)Signed Off (1)Violation (4)Inspection (1)Objection (27)Special Inspection (30)
10/16/2026
Objection raised — Scope
10/16/2026
Objection raised — Inspections
10/16/2026
Objection resolved — Addressed
10/16/2026
Objection raised — Scope
10/16/2026
Objection raised — Fire_Protection
10/16/2026
Objection raised — Energy
10/16/2026
Objection raised — Other
09/25/2026
Filed — Alteration CO
Proposed plumbing work, cellar through 4th Floor.
Q01337919-S1
09/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ANASTASIOS GIANNOPOULOS
09/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
ANASTASIOS GIANNOPOULOS
09/25/2026
Special inspection requirement — Energy Code Compliance Inspections
ANASTASIOS GIANNOPOULOS
09/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
ANASTASIOS GIANNOPOULOS
09/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANASTASIOS GIANNOPOULOS
08/12/2026
Objection raised — Other
07/02/2026
Objection resolved — Addressed
07/02/2026
Objection resolved — Addressed
07/02/2026
Objection resolved — Addressed
06/16/2026
Objection resolved — Addressed
06/16/2026
Objection resolved — Addressed
06/16/2026
Objection resolved — Addressed
06/16/2026
Objection resolved — Addressed
06/16/2026
Objection resolved — Addressed
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
05/30/2026
Objection raised — Scope
05/30/2026
Objection raised — Zoning
05/30/2026
Objection raised — Inspections
05/30/2026
Objection raised — Fire_Protection
05/30/2026
Objection raised — Admin
05/30/2026
Objection raised — Structural
05/30/2026
Objection raised — Zoning
05/30/2026
Objection raised — Energy
05/30/2026
Objection raised — Admin
05/30/2026
Objection raised — Fire_Protection
05/30/2026
Objection raised — Other
01/22/2026
Filed — Alteration CO
Proposed plumbing work, cellar through 4th Floor.
Q01337919-I1
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/19/2025
Special inspection requirement — Heating Systems
12/19/2025
Special inspection requirement — Masonry
12/19/2025
Special inspection requirement — Seismic Resistance of Access Floors
12/19/2025
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
12/19/2025
Special inspection requirement — Structural Cold-Formed Steel
12/19/2025
Special inspection requirement — Structural Steel - Details
12/19/2025
Special inspection requirement — Final
12/19/2025
Special inspection requirement — Footing and Foundation
12/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
12/19/2025
Special inspection requirement — Air barrier - visual inspection
12/19/2025
Special inspection requirement — Permanent certificate
12/19/2025
Special inspection requirement — Fenestration areas
12/19/2025
Special inspection requirement — Fenestration air leakage
12/19/2025
Special inspection requirement — Lighting in dwelling units
12/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
12/19/2025
Special inspection requirement — Interior lighting power
12/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
12/19/2025
Special inspection requirement — Insulation placement and R values
12/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
12/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
12/19/2025
Special inspection requirement — Concrete - Cast-In-Place
12/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/19/2025
Special inspection requirement — Mechanical Systems
03/08/2023
Filed — Alteration
PROVIDE AND INSTALL NEW HEATING, VENTILATION, AND AIR CONDITION (HVAC) UNIT, AND EXHAUST SYSTEM ASSOCIATED WITH NEW DUCT WORK FOR NEW STORE.
Q00779765-P1
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBypass Mechanical09/01/2022
DOB NOWMechanical SystemsPermit IssuedRoland Mechanical of NY*09/01/2022
DOB NOWSidewalk ShedSigned-offRennon Construction09/16/2020
BIS—ISSUEDExo Works05/26/2021
BIS—ISSUEDManhattan Construction06/01/2020
BISEQISSUEDManhattan Construction06/12/2019
BIS—ISSUEDManhattan Construction06/12/2019
BIS—RE-ISSUEDManhattan Construction10/18/2018
BIS—ISSUEDManhattan Construction06/15/2018
BIS—ISSUEDManhattan Construction05/10/2018
BISEQISSUEDManhattan Construction05/10/2018
BIS—RE-ISSUEDOmega Construction Management11/01/2017
BIS—ISSUEDOmega Construction Management10/26/2017
BISEQISSUEDOmega Construction Management03/02/2017
BIS—ISSUEDOmega Construction Management10/27/2016
BIS—ISSUEDOmega Construction Management03/18/2016
BISEQISSUEDOmega Construction Management03/17/2016
BIS—ISSUEDOmega Construction Management12/31/2014
BIS—ISSUEDPerfect Ten Construction09/26/2008
2 projects · most recent 09/25/2026
Heating and Air Conditioning Systems Ventilation Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/25/2026——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Heating
Navien ×2
Ventilation
Lg ×2
03/08/2023Permit IssuedRoland Mechanical of NY*Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin DZ11TA0903AA 93,000 BTU · Heat Pump Outdoor ×2
Ventilation
Greenheck CUE-180-VG 1,200 CFM · Exhaust Fan ×4
CUE-120A 235 CFM · Exhaust Fan ×2
2 projects · most recent 09/25/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/25/2026——Water/Sanitary
10/02/2022Permit IssuedBypass MechanicalGas, Water/Sanitary
2 projects · most recent 06/26/2022
General Wiring
FiledStatusContractorScope
06/26/2022CompleteFried Electric CoGeneral Wiring
09/16/2020Permit IssuedRichard Neu—
1 project · most recent 09/25/2026
Steel Concrete
FiledStatusContractorScope
09/25/2026——Steel, Concrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
09/25/2026HVAC-R and service water piping design and insulationANASTASIOS GIANNOPOULOSenergy_progress
09/25/2026HVAC-R and service water heating system controlsANASTASIOS GIANNOPOULOSenergy_progress
09/25/2026Energy Code Compliance InspectionsANASTASIOS GIANNOPOULOSprogress
09/25/2026HVAC-R and service water heating equipmentANASTASIOS GIANNOPOULOSenergy_progress
09/25/2026Fire-Resistant Penetrations and JointsANASTASIOS GIANNOPOULOSspecial
06/16/2026Energy Code Compliance Inspections—progress
12/19/2025Fire-Resistant Penetrations and Joints—special
12/19/2025Heating Systems—special
12/19/2025Masonry—special
12/19/2025Seismic Resistance of Access Floors—special
12/19/2025Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components—special
12/19/2025Structural Cold-Formed Steel—special
12/19/2025Structural Steel - Details—special
12/19/2025Final—progress
12/19/2025Footing and Foundation—progress
12/19/2025HVAC-R and service water piping design and insulation—energy_progress
12/19/2025Air barrier - visual inspection—energy_progress
12/19/2025Permanent certificate—energy_progress
12/19/2025Fenestration areas—energy_progress
12/19/2025Fenestration air leakage—energy_progress
12/19/2025Lighting in dwelling units—energy_progress
12/19/2025Fenestration and door U-factor and product ratings—energy_progress
12/19/2025Interior lighting power—energy_progress
12/19/2025HVAC-R and service water heating system controls—energy_progress
12/19/2025Insulation placement and R values—energy_progress
Latest 25 of 39.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Tradional Manakish OvenRestaurant / Food ServiceFloor 1, Roof
Project Q00779765 Alteration · Permit Entire · 08/28/2022
Project Q00788271 Alteration · Permit Entire · 08/28/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 134 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
08/26/2026Q00762086-I1Request digital key ↗
08/25/2026Q00788271-P1Request digital key ↗
08/25/2026Q00788271-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/27/2026Q00399795-I1Request digital key ↗
08/15/2026Q00399795-P1Request digital key ↗
▸Applications & Permits25
▸BISWORK PERMIT APPLICATION14
08/05/2021410140226Open ↗
06/02/2020410140226Open ↗
11/13/2018410140226Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
09/17/2008410142545Open ↗
09/17/2008410143018Open ↗
09/05/2008410140226Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-15 - Application for waiver of Builders pavement requirements1
08/28/2008410156389Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026Q01337919-I1Open ↗
08/13/2026Q01337919-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q01337919-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature9
10/04/2026Q01337919-S1Open ↗
08/26/2026Q00762086-I1Open ↗
08/25/2026Q00788271-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
09/26/2008410140226Open ↗
08/27/2008410140226Open ↗
08/27/2008410140226Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
10/04/2026Q01337919-S1Open ↗
10/04/2026Q01337919-S1Open ↗
10/04/2026Q01337919-S1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/28/2008410156389Open ↗
07/25/2008410143027Open ↗
07/25/2008410143018Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/25/2008410143027Open ↗
07/25/2008410143018Open ↗
07/24/2008410142545Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
10/04/2026Q01337919-S1Open ↗
08/31/2026Q00788271-I1Open ↗
08/23/2026Q00779765-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING3
09/17/2008410142545Open ↗
07/25/2008410143018Open ↗
07/24/2008410142545Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST5
08/28/2008410156389Open ↗
08/27/2008410140226Open ↗
07/25/2008410143027Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01337919-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
10/04/2026Q01337919-S1Open ↗
08/26/2026Q00762086-I1Open ↗
08/25/2026Q00788271-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
07/25/2008410143018Open ↗
07/25/2008410143027Open ↗
07/24/2008410142545Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/21/2008410140226Open ↗
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
08/28/2008410156389Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION5
08/05/2021410140226Open ↗
08/05/2021410140226Open ↗
05/21/2018410140226Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
08/27/2008410156389Open ↗
07/25/2008410143027Open ↗
07/25/2008410143018Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
08/27/2008410140226Open ↗
08/27/2008410140226Open ↗
07/21/2008410140226Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/28/2008410156389Open ↗
▸BISSUPERSEDING LETTER1
01/28/2015410140226Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE7
08/05/2021410140226Open ↗
06/02/2020410140226Open ↗
11/13/2018410140226Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT1
09/26/2008410140226Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET5
08/28/2008410156389Open ↗
07/25/2008410143027Open ↗
07/25/2008410143018Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
08/27/2008410140226Open ↗
08/27/2008410140226Open ↗
08/27/2008410140226Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
08/05/2021410140226Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/28/2008410156389Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/14/2026Q01337919-I1Open ↗
08/13/2026Q01337919-I1Open ↗
▸BISPLOT DIAGRAM1
07/21/2008410140226Open ↗
▸BISSupporting Document: Fee Deferment1
06/21/2018410140226Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/21/2018410140226Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01337919-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01337919-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026Q01337919-I1Open ↗