Three families
38-16 149 PLACE
QUEENS · Murray Hill-Broadway Flushing · BIN 4113985
💬 Discuss this project
1970Year Built
3Stories
C0Building Class
R5Zoning
2,500 sfGross Floor Area
3Units
Rent Stabilized10 Open Violations ▸
Three families · 1,967 sf lot · 1.27 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/06/2019$1.6M—— → —$640/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAN ARCHITECT P.C408/16/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VILLAGE P & H NY INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416408/16/2021
Building Lifecycle
All (53)Filed (4)Permit Issued (2)Violation (13)Objection (16)Special Inspection (18)
05/07/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, open)
I
06/12/2025
Violation issued (HPD, open)
A
12/02/2024
Violation issued (HPD, open)
I
04/15/2024
Violation issued (HPD, open)
A
11/24/2023
Violation issued (HPD, open)
I
03/28/2023
Violation issued (HPD, open)
A
11/15/2022
Violation issued (HPD, open)
I
03/04/2022
Violation issued (HPD, open)
A
03/04/2022
Violation issued (HPD, closed)
I
08/16/2021
Filed — Alteration
REPLACEMENT OF EXISTING (1) HOT WATER HEATER & (1) BOILER. ADDITION OF (3) HOT WATER HEATERS & (3) BOILERS, (1) WASHER & DRYER AND (1) GAS METER
Q00294869-P4
08/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
08/10/2021
Special inspection requirement — High Temperature Hot Water Piping (Welding)
ELIAS RASABI
08/10/2021
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
ELIAS RASABI
08/10/2021
Special inspection requirement — Post-installed Anchors
ELIAS RASABI
08/10/2021
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
08/10/2021
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
04/22/2021
Filed — Alteration
REPLACEMENT OF EXISTING (1) HOT WATER HEATER & (1) BOILER. ADDITION OF (3) HOT WATER HEATERS & (3) BOILERS, (1) WASHER & DRYER AND (1) GAS METER
Q00294869-P3
04/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
04/21/2021
Special inspection requirement — High Temperature Hot Water Piping (Welding)
ELIAS RASABI
04/21/2021
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
ELIAS RASABI
04/21/2021
Special inspection requirement — Post-installed Anchors
ELIAS RASABI
04/21/2021
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
04/21/2021
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
04/15/2021
Violation issued (HPD, open)
A
04/15/2021
Violation issued (HPD, closed)
I
01/28/2021
Filed — Alteration
REPLACEMENT OF EXISTING (1) HOT WATER HEATER & (1) BOILER. ADDITION OF (3) HOT WATER HEATERS & (3) BOILERS, (1) WASHER & DRYER AND (1) GAS METER
Q00294869-P2
01/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
01/28/2021
Special inspection requirement — High Temperature Hot Water Piping (Welding)
ELIAS RASABI
01/28/2021
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
ELIAS RASABI
01/28/2021
Special inspection requirement — Post-installed Anchors
ELIAS RASABI
01/28/2021
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
01/28/2021
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
11/24/2020
Permit issued — Plumbing
Q00294869-I1-PL
09/21/2020
Permit issued — Plumbing
Q00294869-I1-PL
02/21/2020
Objection raised — Other
02/21/2020
Objection resolved — Addressed
01/30/2020
Objection raised — Scope
01/30/2020
Objection resolved — Addressed
01/30/2020
Objection raised — Inspections
01/30/2020
Objection resolved — Addressed
01/21/2020
Objection raised — Admin
01/21/2020
Objection resolved — Addressed
01/21/2020
Objection raised — Admin
01/21/2020
Objection resolved — Addressed
01/21/2020
Objection raised — Other
01/21/2020
Objection resolved — Addressed
01/21/2020
Objection raised — Other
01/21/2020
Objection resolved — Addressed
01/21/2020
Objection raised — Admin
01/21/2020
Objection resolved — Addressed
01/13/2020
Filed — Alteration
REPLACEMENT OF EXISTING (1) HOT WATER HEATER & (1) BOILER. ADDITION OF (3) HOT WATER HEATERS & (3) BOILERS, (1) WASHER & DRYER AND (1) GAS METER
Q00294869-I1
02/14/2010
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC11/24/2020
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC09/21/2020
BISPLISSUEDPLUMBING & HTG DOCTOR INC03/02/2015
BIS—ISSUEDINNSBRUCK INTERIORS LLC12/17/2014
BISPLISSUEDTOP DOG PLBG & HTG CORP04/02/2014
BIS—ISSUEDCHAMPION 1 CONSTR CO INC10/21/2011
1 project · most recent 08/16/2021
Gas Water/Sanitary
FiledStatusContractorScope
08/16/2021Signed-offVILLAGE P & H NY INCGas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/10/2021Fire-Resistant Penetrations and JointsELIAS RASABIspecial
08/10/2021High Temperature Hot Water Piping (Welding)ELIAS RASABIspecial
08/10/2021High-Pressure Fuel-Gas Piping (Welding)ELIAS RASABIspecial
08/10/2021Post-installed AnchorsELIAS RASABIspecial
08/10/2021Energy Code Compliance InspectionsELIAS RASABIprogress
08/10/2021Fire-Resistance Rated ConstructionELIAS RASABIprogress
04/21/2021Fire-Resistant Penetrations and JointsELIAS RASABIspecial
04/21/2021High Temperature Hot Water Piping (Welding)ELIAS RASABIspecial
04/21/2021High-Pressure Fuel-Gas Piping (Welding)ELIAS RASABIspecial
04/21/2021Post-installed AnchorsELIAS RASABIspecial
04/21/2021Energy Code Compliance InspectionsELIAS RASABIprogress
04/21/2021Fire-Resistance Rated ConstructionELIAS RASABIprogress
01/28/2021Fire-Resistant Penetrations and JointsELIAS RASABIspecial
01/28/2021High Temperature Hot Water Piping (Welding)ELIAS RASABIspecial
01/28/2021High-Pressure Fuel-Gas Piping (Welding)ELIAS RASABIspecial
01/28/2021Post-installed AnchorsELIAS RASABIspecial
01/28/2021Energy Code Compliance InspectionsELIAS RASABIprogress
01/28/2021Fire-Resistance Rated ConstructionELIAS RASABIprogress
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing4
08/27/2026Q00294869-P4Request digital key ↗
08/15/2026Q00294869-P2Request digital key ↗
08/15/2026Q00294869-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
04/04/2016420192295Open ↗
01/04/2016420192295Open ↗
11/09/2015420192295Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
03/10/2015420192295Open ↗
12/29/2014420192295Open ↗
04/07/2014420192295Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/20/2015420192295Open ↗
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature12
08/31/2026Q00294869-P3Open ↗
08/31/2026Q00294869-P3Open ↗
08/31/2026Q00294869-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026Q00294869-P3Open ↗
08/31/2026Q00294869-P3Open ↗
08/26/2026Q00294869-P4Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/07/2015420192295Open ↗
10/07/2015420192295Open ↗
10/07/2015420192295Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00294869-P2Open ↗
08/27/2026Q00294869-I1Open ↗
08/27/2026Q00294869-P3Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING2
11/19/2012420192295Open ↗
05/27/2010420192295Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B2
12/10/2015420192295Open ↗
12/10/2015420192295Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/09/2015420192295Open ↗
10/05/2015420192295Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
12/10/2015420192295Open ↗
08/27/2015420192295Open ↗
▸BISWATER METER PERMIT : DEP-METER1
12/10/2015420192295Open ↗
▸Safety & Tenant Protection1
▸BISST-1 Street Tree Checklist1
08/12/2010420192295Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00294869-P2Open ↗
08/27/2026Q00294869-P3Open ↗
08/14/2026Q00294869-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWACP5/20/21 or V54
08/27/2026Q00294869-P3Open ↗
08/14/2026Q00294869-I1Open ↗
08/13/2026Q00294869-P4Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/27/2010420192295Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSUPERSEDING LETTER2
03/10/2015420192295Open ↗
12/29/2014420192295Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
04/04/2016420192295Open ↗
08/12/2010420192295Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
12/10/2015420192295Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/27/2010420192295Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/11/2016420192295Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
02/17/2016420192295Open ↗
05/27/2010420192295Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
02/17/2016420192295Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
02/17/2016420192295Open ↗
11/16/2015420192295Open ↗
07/01/2014420192295Open ↗
▸BISEFILING COVER SHEET1
05/27/2010420192295Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
08/17/2010420192295Open ↗