Banking facility, with or without parking
38-18 QUEENS BOULEVARD
QUEENS · BIN 4003170
💬 Discuss this project
1955Year Built
1Stories
K7Building Class
M1-4Zoning
7,822 sfGross Floor Area
1Units
0 Open Violations
Banking facility, with or without parking · Owner of record: PARK LANE HOLDINGS LLC · 15,500 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 20 docs
CellarUnder Construction13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK-IT MANAGEMENT609/13/2026
S S 3103007/08/2026
PARK LANE HOLDINGS LLC C/103/22/2026
CITIBANK703/22/2026
PATH LAND HOLDINGS503/21/2026
CITIBANK N.A.203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S. SCHWARTZ ENGINEERING1307/06/2026
RLG CONSULTATING ENGINEERS104/14/2025
DON M. DACUMOS101/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PAUL FUSCO CONSULTING2403/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HYDRO MECHANICAL INCPlumbing407/08/2026
METROPOLITAN MECHANICAL CGeneral Contractor203/21/2026
POWERHOUSE RETAIL SVCS LLGeneral Contractor207/08/2026
ENERGY ONE ELECTRICAL LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIMON SCHWARTZ, P.E.2598308/07/2023
Building Lifecycle
All (72)Filed (15)Permit Issued (7)Signed Off (4)Violation (10)Inspection (6)Special Inspection (30)
08/12/2026
Signed off — Alteration
INSTALLATION OF 1 BOILER TO REPLACE EXISTING BOILER TO BE REMOVED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01181535-S1
07/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
PATRICK MCDONALD
07/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
PATRICK MCDONALD
07/07/2026
Special inspection requirement — Permanent certificate
PATRICK MCDONALD
07/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
PATRICK MCDONALD
07/07/2026
Special inspection requirement — Maintenance information
PATRICK MCDONALD
07/06/2026
Filed — Alteration
INSTALLATION OF 1 BOILER TO REPLACE EXISTING BOILER TO BE REMOVED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01181535-P7
02/12/2026
Permit issued — Plumbing
Q01181535-S1-PL
12/23/2025
Signed off — Alteration
Q01167932-I1
12/15/2025
Signed off — Alteration
INTERIOR RENOVATION AS PER PLANS AS PER PLANS FILED HEREWITH. WORK INCLUDES TELLER STATION RENOVATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01167942-I1
11/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/22/2025
Filed — Alteration
INSTALLATION OF 1 BOILER TO REPLACE EXISTING BOILER TO BE REMOVED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01181535-P6
10/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PATRICK MCDONALD
10/21/2025
Special inspection requirement — Maintenance information
PATRICK MCDONALD
10/21/2025
Special inspection requirement — Permanent certificate
PATRICK MCDONALD
10/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
PATRICK MCDONALD
10/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
PATRICK MCDONALD
10/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/01/2025
Filed — Alteration
INSTALLATION OF 1 BOILER TO REPLACE EXISTING BOILER TO BE REMOVED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01181535-P5
09/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
PATRICK MCDONALD
09/29/2025
Special inspection requirement — Maintenance information
PATRICK MCDONALD
09/29/2025
Special inspection requirement — Permanent certificate
PATRICK MCDONALD
09/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PATRICK MCDONALD
09/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
PATRICK MCDONALD
08/25/2025
Permit issued — General Construction
Q01167942-I1-GC
08/13/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
PATRICK MCDONALD
07/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PATRICK MCDONALD
07/24/2025
Special inspection requirement — Maintenance information
PATRICK MCDONALD
07/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
PATRICK MCDONALD
07/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PATRICK MCDONALD
07/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
PATRICK MCDONALD
07/24/2025
Special inspection requirement — Permanent certificate
PATRICK MCDONALD
07/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
PATRICK MCDONALD
07/23/2025
Filed — Alteration
INSTALLATION OF 1 BOILER TO REPLACE EXISTING BOILER TO BE REMOVED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01181535-P3
07/23/2025
Filed — Alteration
INSTALLATION OF 1 BOILER TO REPLACE EXISTING BOILER TO BE REMOVED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01181535-P4
07/18/2025
Violation issued (ECB, closed)
Plumbing
07/18/2025
Special inspection requirement — Maintenance information
PATRICK MCDONALD
07/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PATRICK MCDONALD
07/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
PATRICK MCDONALD
07/18/2025
Special inspection requirement — Permanent certificate
PATRICK MCDONALD
07/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
PATRICK MCDONALD
07/10/2025
Permit issued — Structural
Q01167932-I1-ST
07/10/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
07/02/2025
Filed — Alteration
INSTALLATION OF 1 BOILER TO REPLACE EXISTING BOILER TO BE REMOVED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01181535-P2
07/02/2025
Filed — Alteration
INSTALLATION OF 1 BOILER TO REPLACE EXISTING BOILER TO BE REMOVED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01181535-P1
06/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
PATRICK MCDONALD
06/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
PATRICK MCDONALD
06/18/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
04/17/2025
Violation issued (ECB, closed)
Construction
04/14/2025
Filed — Alteration
Q01167932-I1
03/06/2025
Permit issued — Plumbing
Q01181535-S1-PL
03/06/2025
Permit issued — Boiler Equipment
Q01181535-I1-BE
03/06/2025
Permit issued — Boiler Equipment
Q01181535-S2-BE
02/26/2025
Filed — Alteration
INSTALLATION OF 1 BOILER TO REPLACE EXISTING BOILER TO BE REMOVED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01181535-S1
02/26/2025
Filed — Alteration
INSTALLATION OF 1 BOILER TO REPLACE EXISTING BOILER TO BE REMOVED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01181535-S2
02/26/2025
Filed — Alteration
INSTALLATION OF 1 BOILER TO REPLACE EXISTING BOILER TO BE REMOVED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01181535-I1
01/27/2025
Filed — Alteration
INTERIOR RENOVATION AS PER PLANS AS PER PLANS FILED HEREWITH. WORK INCLUDES TELLER STATION RENOVATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01167942-I1
08/15/2023
Signed off — Alteration
MODIFICATIONS TO MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q08053421-I1
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHYDRO MECHANICAL INC02/12/2026
DOB NOWGeneral ConstructionSigned-offPOWERHOUSE RETAIL SVCS LL08/25/2025
DOB NOWStructuralSigned-offPOWERHOUSE RETAIL SVCS LL07/10/2025
DOB NOWPlumbingPermit IssuedHYDRO MECHANICAL INC03/06/2025
DOB NOWBoiler EquipmentSigned-offHYDRO MECHANICAL INC03/06/2025
DOB NOWBoiler EquipmentSigned-offHYDRO MECHANICAL INC03/06/2025
DOB NOWMechanical SystemsSigned-offMETROPOLITAN MECHANICAL C01/04/2023
BISMHISSUEDSOUND REFRIGERATION & AIR03/13/2016
BISMHISSUEDSOUND REFRIGERATION & AIR11/20/2006
BISBLISSUEDNEW YORK HEATING CORP04/29/2005
BISPLISSUEDNEW YORK HEATING CORP04/29/2005
BIS—ISSUEDGOING SIGN & SVCNG CO,INC08/31/2000
BIS—ISSUEDGOING SIGN & SVCNG CO,INC08/31/2000
BIS—ISSUEDGOING SIGN & SVCNG CO,INC08/31/2000
BISOTISSUEDPERRY MECHANICAL CONTRACTORS03/30/1998
BIS—ISSUEDULTIMATE SIGNS & DESIGNS CORP.11/04/1996
BISPLRE-ISSUEDMETRO MECHANICAL GROUP IN09/17/1996
BISSPISSUEDCAPITOL FIRE SPKL CO,INC09/17/1996
BISOTISSUEDADELHARDT CONSTRUCTION CORP04/17/1996
BISOTISSUEDADELHARDT CONSTRUCTION CORP04/17/1996
BISMHISSUEDADELHARDT CONSTRUCTION CORP04/17/1996
BISPLISSUEDWASOFF PLBG & UTILITY CO10/07/1994
BISBLISSUEDWASOFF PLBG & UTILITY CO10/07/1994
BISOTISSUEDPERRY MECHANICAL CONTRACTOR05/04/1994
1 project · most recent 07/06/2026
Gas
FiledStatusContractorScope
07/06/2026Signed-offHYDRO MECHANICAL INCGas
3 projects · most recent 07/15/2025
General Wiring
FiledStatusContractorScope
07/15/2025CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
05/20/2025CompleteENERGY ONE ELECTRICAL LLCGeneral Wiring
06/19/2021Permit IssuedDANICK ELEC'L CONTR'G CORGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/10/2025Fail-Final Boiler Equipment InspectionFailView ↗
06/18/2025Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
07/07/2026HVAC-R and service water heating system controlsPATRICK MCDONALDenergy_progress
07/07/2026HVAC-R and service water piping design and insulationPATRICK MCDONALDenergy_progress
07/07/2026Permanent certificatePATRICK MCDONALDenergy_progress
07/07/2026HVAC-R and service water heating equipmentPATRICK MCDONALDenergy_progress
07/07/2026Maintenance informationPATRICK MCDONALDenergy_progress
10/21/2025HVAC-R and service water piping design and insulationPATRICK MCDONALDenergy_progress
10/21/2025Maintenance informationPATRICK MCDONALDenergy_progress
10/21/2025Permanent certificatePATRICK MCDONALDenergy_progress
10/21/2025HVAC-R and service water heating equipmentPATRICK MCDONALDenergy_progress
10/21/2025HVAC-R and service water heating system controlsPATRICK MCDONALDenergy_progress
09/29/2025HVAC-R and service water heating system controlsPATRICK MCDONALDenergy_progress
09/29/2025Maintenance informationPATRICK MCDONALDenergy_progress
09/29/2025Permanent certificatePATRICK MCDONALDenergy_progress
09/29/2025HVAC-R and service water piping design and insulationPATRICK MCDONALDenergy_progress
09/29/2025HVAC-R and service water heating equipmentPATRICK MCDONALDenergy_progress
07/24/2025HVAC-R and service water heating equipmentPATRICK MCDONALDenergy_progress
07/24/2025HVAC-R and service water piping design and insulationPATRICK MCDONALDenergy_progress
07/24/2025Maintenance informationPATRICK MCDONALDenergy_progress
07/24/2025HVAC-R and service water heating system controlsPATRICK MCDONALDenergy_progress
07/24/2025HVAC-R and service water piping design and insulationPATRICK MCDONALDenergy_progress
07/24/2025HVAC-R and service water heating system controlsPATRICK MCDONALDenergy_progress
07/24/2025Permanent certificatePATRICK MCDONALDenergy_progress
07/24/2025HVAC-R and service water heating equipmentPATRICK MCDONALDenergy_progress
07/18/2025Maintenance informationPATRICK MCDONALDenergy_progress
07/18/2025HVAC-R and service water piping design and insulationPATRICK MCDONALDenergy_progress
Latest 25 of 59.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/25/2026Q08053421-I1Request digital key ↗
08/25/2026Q08053421-P1Request digital key ↗
08/25/2026Q08053421-P2Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/11/2016440281614Open ↗
▸BISWORK PERMIT APPLICATION1
03/11/2016440281614Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026Q01181535-I1Open ↗
09/23/2026Q01181535-S2Open ↗
09/01/2026Q01181535-P5Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026Q08053421-P1Open ↗
08/25/2026Q08053421-I1Open ↗
08/20/2026Q01167932-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q08053421-P2Open ↗
08/23/2026Q08053421-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/11/2016440281614Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/11/2016440281614Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/11/2016440281614Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/21/2016440281614Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE PERMITS2
04/21/2016440281614Open ↗
04/21/2016440281614Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
04/21/2016440281614Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/25/2026Q08053421-P1Open ↗
08/25/2026Q08053421-I1Open ↗
08/20/2026Q01167932-I1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/11/2016440281614Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/11/2016440281614Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/21/2016440281614Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/11/2016440281614Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/21/2016440281614Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q08053421-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/11/2016440281614Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/21/2016440281614Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/21/2016440281614Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/21/2016440281614Open ↗
03/11/2016440281614Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/11/2016440281614Open ↗