Two stories - detached, small or mid-size
38-23 215 PLACE
QUEENS · BIN 4137693
💬 Discuss this project
1930Year Built
2.67Stories
A1Building Class
R3XZoning
1,958 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,600 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR112/18/2023
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281112/18/2023
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Signed Off (1)Objection (4)Special Inspection (5)
07/22/2024
Signed off — Alteration
Installation of solar panels, rooftop, grid tied, RAILED (5.2KW)(13MODULES)
Q00977576-I1
01/19/2024
Permit issued — Solar
Q00977576-I1-SL
01/10/2024
Objection resolved — Addressed
01/03/2024
Objection resolved — Addressed
12/27/2023
Objection raised — Zoning
12/27/2023
Objection raised — Other
12/18/2023
Filed — Alteration
Installation of solar panels, rooftop, grid tied, RAILED (5.2KW)(13MODULES)
Q00977576-I1
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
12/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
12/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/14/2023
Special inspection requirement — Final
Mina Makar
12/14/2023
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR01/19/2024
1 project · most recent 12/14/2023
FiledStatusContractorScope
12/14/2023CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/14/2023Fire-Resistant Penetrations and JointsMina Makarspecial
12/14/2023Structural Stability – Alterations of existing buildingsMina Makarspecial
12/14/2023Energy Code Compliance InspectionsMina Makarprogress
12/14/2023FinalMina Makarprogress
12/14/2023Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q00977576-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q00977576-I1Open ↗
08/23/2026Q00977576-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026Q00977576-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q00977576-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026Q00977576-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00977576-I1Open ↗